logo-loader

Range Resource updates on Perlak well programme

Published: 03:19 06 Jul 2018 EDT

oil and gas operations
The programme aims to add 200 bopd of production

Range Resources Ltd (LON:RRL) has updated investors on operations at the Perlak project in Indonesia, where it is advancing a programme of well workovers.

The first reactivated well, POG-D, is continuing testing as production rates are being optimised – as previously reported the well has flowed 145 barrels of high-quality light oil from one of the multiple production zones over intermittent pumping periods, over a total of 117 hours.

READ: Range kicks off well operations in Indonesia

POG-E, the second well, is presently being reopened with the field team presently working to remove a downhole obstruction.

Up to ten existing wells could be reopened and reactivated through the programme, which is expected to add some 200 barrels of oil per day to Perlak.

 

Ramp Metals Launches Drilling Program in Pursuit of High-Grade Nickel in...

Ramp Metals CEO Jordan Black joined Steve Darling from Proactive to introduce the company to the public domain and share exciting developments in the mining industry. With a background as a geotechnical engineer and experience in venture capital, including a notable role in taking GoldSpot...

37 minutes ago