logo-loader
viewSt George Mining Ltd

St George Mining intersects thick high-grade nickel-copper-cobalt-PGE mineralisation at Mt Alexander

The Mt Alexander Project is 120 kilometres south-southwest of the Agnew Wiluna belt which hosts world-class nickel deposits.

1560390601_ST-GEORGE-HEADER-YA.jpg
The Mt Alexander project is near Leonora in the north eastern Goldfields

St George Mining Ltd (ASX:SGQ) has obtained thick high-grade nickel-copper-cobalt-platinum group element (PGE) sulphide mineralisation in its latest phase-one drilling program at the Mt Alexander Project in WA.

Best intersections were drilled at the Investigators prospect with results establishing further continuity of high-grade mineralisation, both in the northerly down-dip direction and along the east-west trend of the Cathedrals belt.

Plan view of the Investigators prospect

 

READ: St George Mining identifies high priority nickel-copper targets at Mt Alexander ahead of drilling

St George Mining executive chairman John Prineas said: “The latest high-grade intersections at Investigators establish further continuity to the scope and scale of mineralisation at Investigators.

“Ongoing step-out drilling is being planned with two SAMSON electro magnetic (EM) anomalies in the northern section of the prospect area lined up as high-priority targets for the upcoming drill program.

“The SAMSON anomalies are corroborated by data from two separate geophysical surveys – the recent sub-audio magnetics (SAM) survey as well as a prior moving-loop EM survey are compelling drill targets for the discovery of additional mineralisation.”

READ: St George Mining identifies conductive targets at Mt Alexander Project

Laboratory assays for MARC118 confirm thick intersections of high-grade nickel-copper-cobalt-PGE mineralisation including:

  • 10 metres at 2.47% nickel, 1.06% copper, 0.07% cobalt and 2.52 g/t PGEs from 142 metres, including;
  • 3 metres at 3.85% nickel, 2.12% copper, 0.11% cobalt and 4.22 g/t PGEs from 154 metres; and
  • 2 metres at 5.04% nickel, 1.47% copper, 0.16% cobalt and 2.12 g/t PGEs from 150 metres.

The 10-metre-thick high-grade intersection in MARC118 extends the continuity of mineralisation on the north-south trending MAD60 line.

Other notable intersections were received in MARC109 which drilled about 200 metres to the west-northwest of MARC118, these included:

  • 4 metres at 1.21% nickel, 0.47% copper, 0.04% cobalt and 0.99 g/t PGEs from 200 metres, including;
  • 2 metres at 2.04% nickel, 0.83% copper, 0.07% cobalt and 1.67 g/t PGEs from 202 metres.

READ: St George Mining identifies new Cathedrals Belt nickel mineralisation

The planning for phase-two of the 2019 drill program at Mt Alexander is being finalised.

The combined diamond and reverse circulation (RC) program will test the new DHEM conductors identified from the phase-one drill holes as well as the northern SAMSON anomalies at Investigators.

A high-powered surface MLEM survey is also scheduled over the West End and Bullets prospects and any EM targets generated by those surveys will be prioritised for drilling in the phase-two drilling program.  

Quick facts: St George Mining Ltd

Price: 0.145 AUD

ASX:SGQ
Market: ASX
Market Cap: $59.83 m
Follow

Add related topics to MyProactive

Create your account: sign up and get ahead on news and events

NO INVESTMENT ADVICE

The Company is a publisher. You understand and agree that no content published on the Site constitutes a recommendation that any particular security, portfolio of securities, transaction, or investment strategy is...

In exchange for publishing services rendered by the Company on behalf of St George Mining Ltd named herein, including the promotion by the Company of St George Mining Ltd in any Content on the Site, the Company...

FOR OUR FULL DISCLAIMER CLICK HERE

Watch

St George Mining Melbourne/Sydney Investor Luncheon Presentation

St George Mining Melbourne/Sydney Investor Luncheon Presentation

on 09/21/2015

3 min read