Cornish Metals PLC - OPERATIONS UPDATE FOR THE SOUTH CROFTY TIN PROJECT

OPERATIONS UPDATE FOR THE SOUTH CROFTY TIN PROJECT
Cornish Metals plc (AIM: TIN) ("Cornish Metals" or the "Company"), a mineral exploration and development company focused on advancing its wholly owned and permitted South Crofty tin project in
Highlights
Underground and surface works advancing in parallel, including:
· New Cook's Kitchen ("NCK") shaft mid-shaft pump station refurbishment completed
· NCK shaft refurbishment has resumed below the mid-shaft pump station and mine dewatering is ongoing
· Project schedule continues to be optimised, including bringing forward essential pre-production development at the 290-level to Q3 2026, providing access to the Roskear shaft for through-ventilation and drilling access
· With this refocused execution strategy, shaft refurbishment and mine dewatering are scheduled to be completed in early 2027. Guidance for first tin production is unchanged at mid-2028
· Process plant excavation is progressing according to plan, as are Front-End Engineering Design ("FEED") and Detailed Engineering for the plant
· Surface construction at Roskear shaft has commenced
· Installation of roof cladding for the Bartles Foundry stores and maintenance building is complete
· Mine Dry Phase 2 construction is progressing as planned, with completion targeted in Q1 2026
· Surface exploration drilling programme is planned to commence in
"Activity levels at South Crofty continue to increase, with important milestones achieved both underground and on surface.
"We have optimised our development sequence by shifting our immediate focus to pre-production development of the 290-level. This mitigates certain execution risks for the project, improves schedule flexibility and maintains our guidance for first tin production in mid-2028. Further de-risking options are constantly being reviewed. With multiple workstreams advancing in parallel, we remain focused on disciplined execution as we continue to advance South Crofty towards production. The tin price is very well supported by a tight physical market, growing demand for technology applications and lagging supply, amplifying the need for new and secure mined tin supply that South Crofty can deliver."
Underground activities
Pump station, shaft refurbishment and mine dewatering: Refurbishment work on NCK's mid-shaft pump station (at approximately 360 metres below surface) is now complete following installation of the four new permanent pumps (see image 1). Further to the refurbishment of the pump station, and in addition to the initial scope of work, the

Image 1: New Cook's Kitchen shaft pump station at approximately 360 metres below surface.
Optimised sequencing and bringing forward mine development: The projects and operations teams continually work towards optimising the execution schedule by prioritising essential workstreams and identifying opportunities to further de-risk the project. Pre-production development of the 290-level is being brought forward to commence in Q3 2026. This is essential as this level will provide access to Roskear shaft for through-ventilation and secondary egress. Ramp access will also be established at the 290-level (approximately 530 metres below surface) where mining is planned during early production.
The effect of this re-sequencing mitigates certain execution risks for the project, brings forward essential pre-production development, ventilation and access to underground exploration and infill drilling. With this optimised and refocused execution strategy, shaft refurbishment and mine dewatering are now scheduled to be completed in early 2027. Guidance for first tin production from South Crofty is unchanged at mid-2028.
25-level: Underground development at the 25-level (approximately 45 metres below surface) is underway and multiple drill and blast rounds have been completed (see image 2). Approximately 600 metres of lateral development is planned on this level, which is required to establish the sub-terranean skip discharge and rock handling facilities for the NCK shaft rock-hoisting system. The development training programme is ready and new starter miner training is now underway.

Image 2: 25-level underground development - jumbo drilling round.
Surface activities
Pre-concentration plant: The second phase of excavation for the new pre-concentration plant, focused on removing overburden and rock across the building footprint, is progressing according to plan (see image 3).
The FEED and Detailed Engineering contract for the processing facilities has been awarded to Ausenco with completion expected in Q4 2026, enabling construction of the pre-concentration plant to commence in Q1 2027.
Procurement of the main process equipment is expected to continue through 2026, with most key equipment planned to be ordered in the next 12 months.

Image 3: Pre-concentration plant excavation.
Roskear shaft: The first phase of surface work at Roskear shaft has been completed, and the earthworks are now underway (see image 4). Roskear shaft, located approximately 850 metres west of NCK shaft, is 610 metres deep with a 4.9 metre diameter and will be used for ventilation and secondary access for the mine. Local communities in the area have been contacted, with a drop-in session organised for early February to address any questions.

Image 4: Surface works at Roskear shaft.
Workshop and stores: Construction activities for the new workshop and stores facility located at the old Bartles Foundry site are progressing well with the roof panel installation now complete (see image 5) and the welfare area currently under construction. Due to the recent wet weather experienced in

Image 5: Workshop and stores building - roof panel installation complete.
Surface exploration drilling: A surface exploration drilling programme is scheduled to commence in March to explore the western edges of South Crofty's Roskear lodes, with the potential to intersect other lodes. The planned 2,400 metre drill programme seeks to extend the Inferred Mineral Resource of the Roskear lodes and demonstrate the potential to add to South Crofty's overall Mineral Resource inventory.
Other
The exploration and option deed entered into with Cornish Lithium Plc in
ABOUT CORNISH METALS
Cornish Metals is a mineral exploration and development company that is advancing the South Crofty critical mineral project towards production. South Crofty:
· is a historical underground tin mine located in
· is the highest grade known tin Mineral Resource not in production with significant near-mine and regional Mineral Resource potential;
· is permitted to commence underground mining (valid to 2071), construct a new processing facility and for all necessary site infrastructure;
· will be a low environmental impact underground mine with zero surface tailings;
· would be potentially the first primary producer of tin in
· benefits from strong local community, regional and national government support with a growing team of skilled people, local to
· is an opportunity for a secure domestic supply of tin in the
ENDS
Engage with us directly at our investor hub. Sign up at: https://investors.cornishmetals.com/link/P7bbor
For additional information please contact:
|
Cornish Metals
|
|
|
|
|
|
Tel: +44 1209 715 777
|
|
SP Angel Corporate Finance LLP (Nominated Adviser)
|
|
Tel: +44 203 470 0470
|
|
Berenberg (Joint Broker) |
|
Tel: +44 20 3753 3040
|
|
Peel Hunt (Joint Broker) |
|
Tel: +44 20 7418 8900
|
|
|
|
|
|
BlytheRay (Financial PR) |
Said Izagaren |
Tel: +44 207 138 3204 |
The Bartles Foundry project is part-funded by the UK Government through the UK Shared Prosperity Fund. Cornwall Council is responsible for managing projects funded by the UK Shared Prosperity Fund through the

Market Abuse Regulation (MAR) Disclosure
The information contained within this announcement is deemed by the Company to constitute inside information pursuant to Article 7 of EU Regulation 596/2014 as it forms part of
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
Proactive Investors is a publisher of financial news and information. No content in this record, or published on the Proactive Investors website (the "Site"), constitutes a recommendation that any particular security, portfolio of securities, transaction, or investment strategy is suitable or advisable for any specific person. No content is tailored to any specific person's needs, objectives, or financial situation.
Proactive Investors is not a registered investment adviser or broker-dealer and does not provide personalized investment advice. Nothing in this record constitutes investment advice or a recommendation to buy, hold, or sell any security. None of the information providers or their affiliates will advise you personally concerning the nature, potential, advisability, value, or suitability of any particular security, portfolio, transaction, or investment strategy. Any decision to buy, sell, or hold a security should be made only after consulting an appropriately qualified, licensed financial adviser and reading all relevant offering documentation.
This record, and any record we publish by or on behalf of our clients, should not be construed as an offer or solicitation to buy or sell any product or security. Our content is independent financial journalism, produced in a neutral, objective style with full source attribution.
In accordance with the Federal Trade Commission's guidelines on material connections, Proactive Investors discloses the following: we may receive cash or, in some cases, equity compensation from companies whose news is distributed through our platform. This compensation is for news distribution and media services, not for editorial content or coverage decisions. Where Proactive Investors has a commercial relationship with a company covered in this record, that relationship is disclosed within the article. Any such relationship does not determine, influence, or shape the editorial content produced. Where we receive equity compensation, such securities are held independently by a third-party broker and sold at the broker's discretion.
The Site may contain opinions from time to time regarding securities mentioned in other products, including company-related products, and those opinions may differ from those obtained through another Proactive Investors product. Opinions and commentary reflect the views of the named author at the time of writing and are subject to change without notice.
Price and other data is supplied by sources believed to be reliable. Any calculations are made using such data. Neither the data nor the calculations are guaranteed by those sources, by Proactive Investors, by the information providers, or by any other person or entity, and may not be complete or accurate.
From time to time, reference may be made in our marketing materials to previously published articles or opinions. Such references may be selective, may reference only a portion of an article, and are likely not to be current. As markets change continuously, previously published information and data may not be current and should not be relied upon.
FOR OUR FULL DISCLAIMER CLICK HERE