Trident Royalties. - Portfolio Update: Thacker Pass Lithium Royalty
Trident Royalties Plc
("Trident" or the "Company")
Portfolio Update: Thacker Pass Lithium Royalty
Trident Royalties Plc (AIM: TRR), the diversified mining royalty company, is pleased to note recent updates on the
HIGHLIGHTS
· General Motors Co. (NYSE: GM) ("GM") and LAC have announced that they will jointly invest to develop
· Under the Agreement, GM will make a
· GM has also entered into a 10-year offtake agreement, to purchase the Phase 1 production from
· LAC estimates the lithium extracted and processed from the Project can support production of up to 1 million electric vehicles per year.
· In connection with the Agreement, LAC has provided an update on the construction plan for
o
o Phase 1 production expected to commence in the second half of 2026.
o Project life of 40 years utilising less than 25% of the current Measured and Indicated ("M&I") Mineral Resource estimate 3.
o Proven and Probable Mineral Reserves of 3.7 million tonnes lithium carbonate equivalent ("LCE") at an average grade of 3,160 parts per million lithium ("ppm Li") 4.
o M&I Mineral Resource estimate of 16.1 Mt LCE at an average grade of 2,070 ppm Li.
o
o LAC have awarded the Engineering, Procurement and Construction Management ("EPCM") contract for the construction of
· Trident holds a 60% interest in a gross revenue royalty over the entirety of the Project. Assuming LAC exercises the partial royalty buy-back (
o At current lithium spot price of approximately
"The agreement with GM is a major milestone in moving
"
"For Trident,
Agreement with General Motors
GM has agreed to make an aggregate investment of
Following the satisfaction of certain conditions, GM has agreed to subscribe for shares of LAC at the then market price on the date of subscription, subject to a cap of 130% of the Tranche 1 Subscription Price in an amount equal to
LAC has agreed to use the proceeds from the Agreement for the development of
OFFTAKE & INVESTOR RIGHTS AGREEMENT
LAC has entered into an agreement to supply GM with lithium carbonate production from Phase 1 of
LAC notes that GM has announced four
GM is currently building electric vehicles in two
PROJECT UPDATE
LAC provided a project update in connection with the Agreement2. The Thacker Pass Feasibility Study results reflect operational and process improvements, including increased extraction rates from an optimised mine plan through new ore control strategy, an increase in sulphuric acid utilisation by targeting illite clay with greater potential for increasing lithium extraction per tonne of sulphuric acid and increased crystallisation steps to further remove magnesium impurities.
Other process and design improvements were made to further minimise the project's environmental impact, including, increased capacity to 80,000 tpa within approximately the same mining footprint as the permitted pit boundary and without increasing the size of the sulphuric acid plant, additional beneficiation and neutralisation circuits to increase the neutrality of filter pressed tailings and implementing a tail gas scrubber utilising a neutralisation solution in the sulphuric acid plant to minimise emissions and reduce impacts to ambient air quality.
CONSTRUCTION TIMELINE UPDATE
Phase 1 will consist of a single sulphuric acid plant with a nominal production rate of 3,000 tonnes per day sulphuric acid. Phase 2 construction will begin upon completion of Phase 1, with the addition of a second sulphuric acid plant with an additional nominal production rate of 3,000 tpd.
Total designed capacity of 80,000 tpa lithium carbonate production upon completion of both Phase 1 and Phase 2. Actual production varies by year with anticipated average production of approximately 70,000 tpa lithium carbonate in the first 25 years and approximately 67,000 tpa over the life of mine, including ramp up of Phase 1 and Phase 2.
LAC noted that it continues to prepare for construction while it awaits a ruling for the appeal of the issuance of the United States Bureau of Land Management ("BLM") Record of Decision ("ROD") following a hearing held by the US District Court, District of
References
1: Source: Lithium Americas Corp. announcement dated
( https://www.lithiumamericas.com/news/gm-and-lithium-americas-to-develop-us-sourced-lithium-production-through-650-million-equity-investment-and-supply-agreement )
2: Source: Lithium Americas Corp announcement dated
3: Thacker Pass Mineral Resource Estimate as of
|
Category |
Tonnage |
Average Li |
Lithium Carbonate Equivalent (Mt) |
|
Measured |
534.7 |
2,450 |
7.0 |
|
Indicated |
922.5 |
1,850 |
9.1 |
|
Total Measured & Indicated |
1,457.2 |
2,070 |
16.1 |
|
Inferred |
297.2 |
1,870 |
3.0 |
Notes for the
1. The Qualified Person who supervised the preparation of and approved disclosure for the estimate is
2. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Mineral Resources are inclusive of 217.3 million metric tonnes (Mt) of Mineral Reserves.
3. Mineral Resources are reported using an economic break-even formula: "Operating Cost per Resource Tonne"/"Price per Recovered Tonne Lithium" * 10^6 = ppm Li Cut-off. "Operating Cost per Resource Tonne" =
4. Presented at a cut-off grade of 1,047 ppm Li.
5. A resource constraining pit shell has been derived from performing a pit optimization estimation using
6. The conversion factor for lithium to LCE is 5.323.
7. Applied density for the mineralization is 1.79 t/m3.
8. Measured Mineral Resources are in blocks estimated using at least six drill holes and eighteen samples within a 262 m search radius in the horizontal plane and 5 m in the vertical direction; Indicated Mineral Resources are in blocks estimated using at least two drill holes and six to eighteen samples within a 483 m search radius in the horizontal plane and 5 m in the vertical direction; and Inferred Mineral Resources are blocks estimated with at least two drill holes and three to six samples within a search radius of 722 m in the horizontal plane and 5 m in the vertical plane.
9. Tonnages and grades have been rounded to accuracy levels deemed appropriate by the QP. Summation errors due to rounding may exist.
4: Thacker Pass Mineral Reserve Estimate as of
|
Category |
Tonnage (Mt) |
Average Li (ppm) |
Lithium Carbonate Equivalent (Mt) |
|
Proven |
192.9 |
3,180 |
3.3 |
|
Probable |
24.4 |
3,010 |
0.4 |
|
Total Proven and Probable |
217.3 |
3,160 |
3.7 |
Notes for the
1. The Qualified Person who supervised the preparation of and approved disclosure for the estimate is Kevin Bahe, P.E., SME-RM.
2. Mineral Reserves have been converted from measured and indicated Mineral Resources within the feasibility study and have demonstrated economic viability.
3. Reserves presented at an 85% maximum ash content and 1.533 kilogram of lithium recovered per run of mine feed cut-off grade. A sales price of
4. A LOM plan was developed based on equipment selection, equipment rates, labour rates, and plant feed and reagent parameters. All Mineral Reserves are within the LOM plan. The LOM plan is the basis for the economic assessment within the NI 43-101 technical report titled "Feasibility Study, National Instrument 43-101 Technical Report for the Thacker Pass Project
5. Applied density for the ore is 1.79 t/m3.
6. Lithium Carbonate Equivalent is based on in-situ LCE tonnes with 95% recovery factor.
7. Tonnages and grades have been rounded to accuracy levels deemed appropriate by the QP. Summation errors due to rounding may exist.
8. The reference point at which the Mineral Reserves are defined is at the point where the ore is delivered to the run-of-mine feeder.
Competent Person's Statement
The technical information contained in this disclosure has been read and approved by Mr
** Ends **
Contact details:
|
Trident Royalties Plc |
+1 (757) 208-5171 / +44 7967 589997 |
|
Grant Thornton (Nominated Adviser) |
+44 020 7383 5100 |
|
Stifel Nicolaus Europe Limited (Joint Broker) |
+44 20 7710 7600 |
|
Liberum Capital Limited (Joint Broker) |
+44 20 3100 2184 |
|
Tamesis Partners LLP (Joint Broker) |
+44 20 3882 2868 |
|
St Brides Partners Ltd (Financial PR & IR) Susie Geliher / |
+44 20 7236 1177 |
About Trident
Trident is a growth-focused diversified mining royalty and streaming company, providing investors with exposure to a mix of base battery, precious, and bulk metals.
Key highlights of Trident's strategy include:
|
· |
Building upon a royalty and streaming portfolio which broadly mirrors the commodity exposure of the global mining sector (excluding fossil fuels) with a bias towards production or near-production assets, differentiating Trident from the majority of peers which are exclusively, or heavily weighted, to precious metals;
|
|
· |
Acquiring royalties and streams in resource-friendly jurisdictions worldwide, while most competitors have portfolios focused on
|
|
· |
Targeting attractive small-to-mid size transactions which are often ignored in a sector dominated by large players;
|
|
· |
Active deal-sourcing which, in addition to writing new royalties and streams, will focus on the acquisition of assets held by natural sellers such as: closed-end funds, prospect generators, junior and mid-tier miners holding royalties as non-core assets, and counterparties seeking to monetise packages of royalties and streams which are otherwise undervalued by the market;
|
|
· |
Maintaining a low-overhead model which is capable of supporting a larger scale business without a commensurate increase in operating costs; and
|
|
· |
Leveraging the experience of management, the board of directors, and Trident's adviser team, all of whom have deep industry connections and strong transactional experience across multiple commodities and jurisdictions. |
The acquisition and aggregation of individual royalties and streams is expected to deliver strong returns for shareholders as assets are acquired on terms reflective of single asset risk compared with the lower risk profile of a diversified, larger scale portfolio. Further value is expected to be delivered by the introduction of conservative levels of leverage through debt. Once scale has been achieved, strong cash generation is expected to support an attractive dividend policy, providing investors with a desirable mix of inflation protection, growth and income.
Forward-looking Statements
This news release contains forward‐looking information. The statements are based on reasonable assumptions and expectations of management and Trident provides no assurance that actual events will meet management's expectations. In certain cases, forward‐looking information may be identified by such terms as "anticipates", "believes", "could", "estimates", "expects", "may", "shall", "will", or "would". Although Trident believes the expectations expressed in such forward‐looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those projected. Mining exploration and development is an inherently risky business. In addition, factors that could cause actual events to differ materially from the forward-looking information stated herein include any factors which affect decisions to pursue mineral exploration on the relevant property and the ultimate exercise of option rights, which may include changes in market conditions, changes in metal prices, general economic and political conditions, environmental risks, and community and non-governmental actions. Such factors will also affect whether Trident will ultimately receive the benefits anticipated pursuant to relevant agreements. This list is not exhaustive of the factors that may affect any of the forward‐looking statements. These and other factors should be considered carefully and readers should not place undue reliance on forward-looking information.
Third Party Information
As a royalty and streaming company, Trident often has limited, if any, access to non-public scientific and technical information in respect of the properties underlying its portfolio of royalties and investments, or such information is subject to confidentiality provisions. As such, in preparing this announcement, the Company often largely relies upon information provided by or the public disclosures of the owners and operators of the properties underlying its portfolio of royalties, as available at the date of this announcement.
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
This content is published by Proactive Investors Limited and made available subject to the terms and conditions of use of its website (see Terms of Use).
Proactive Investors is a full-service financial newswire. We produce independent, objective financial journalism and do not provide personalised investment advice, act as a broker, or recommend specific securities to individual investors.
Financial content published on this Site is produced under the journalist exemption provided for in Article 20 of the Financial Services and Markets Act 2000 (Financial Promotion) Order 2005, and in accordance with FCA guidance at PERG 8.12. Where a communication is not otherwise exempt, it is issued or approved for distribution in the UK by Proactive Investors Limited.
All information used in the preparation of this communication has been compiled from publicly available sources that we believe to be reliable, however, we cannot, and do not, guarantee the accuracy or completeness of this communication.
This communication is intended for information purposes only and does not constitute investment advice, a personal recommendation, an offer, solicitation, or inducement to buy or sell any investment or financial product. Opinions and commentary reflect the views of the named author at the time of writing and are subject to change without notice.
This communication has been prepared without taking account of the objectives, financial situation or needs of any particular investor. Before entering into any transaction, investors should consider suitability for their individual circumstances and should read the relevant prospectus, term sheet, subscription agreement, information memorandum, prospectus or other offering document in full.
Past performance is not a reliable indicator of future results. The value of investments can fall as well as rise, and you may not recover the amount you invest.
This communication may contain information obtained from third parties, including credit ratings and financial data. Reproduction and distribution of third-party content in any form is prohibited except with the prior written consent of the relevant third party. Credit ratings are statements of opinion and should not be relied upon as investment advice.
FOR OUR FULL DISCLAIMER CLICK HERE