Atalaya MiningCopper - Q1 2026 Operations Update
Atalaya Mining Copper, S.A.
("Atalaya" or "the Company")
Q1 2026 Operations Update
Well positioned for future growth despite recent weather events
Atalaya Mining (LSE: ATYM) is pleased to announce its operations update for the first quarter of 2026 ("Q1 2026" or the "Period").
Proyecto Riotinto Operating Highlights
|
|
|
Q1 |
Q4 |
Full Year |
|
|
|
|
2026(1) |
2025 |
2025 |
2026 Guidance |
|
Ore mined |
M tonnes |
3.4 |
3.7 |
3.9 |
15.5 - 16.0 |
|
Waste mined(2) |
M tonnes |
10.2 |
11.3 |
9.2 |
38 - 44(3) |
|
Ore processed |
M tonnes |
4.1 |
4.2 |
4.1 |
15.5 - 16.0 |
|
Copper grade |
% |
0.30 |
0.42 |
0.33 |
0.38 - 0.41 |
|
Copper recovery |
% |
81.54 |
80.98 |
83.87 |
79 - 83 |
|
Copper production |
tonnes |
9,939 |
14,291 |
11,550 |
50,000 - 54,000 |
(1) Figures for Q1 2026 are preliminary and final figures will be released with Q1 2026 Financial Results.
(2) Represents the Cerro Colorado pit only.
(3) Waste guidance is 57 - 67 million tonnes when including the San Dionisio pit.
"Our production in Q1 2026 was impacted by unusually heavy rains, similar to the operations of our peers in the Iberian Pyrite Belt. In the coming quarters, we expect to recover a portion of the production shortfall.
Beyond the quarter, our focus remains firmly on growing and diversifying the business. We are well-positioned to advance our pipeline across the
Looking further ahead, we believe the structural drivers for copper demand remain compelling. As major economies accelerate investment in renewable energy, electrification and distribution infrastructure, copper will play an increasingly strategic role, reinforcing the long‑term value of our asset portfolio."
Q1 2026 Operating Results
Mining
Ore mined was 3.4 million tonnes in Q1 2026 (Q1 2025: 3.7 million tonnes), compared with 3.9 million tonnes in Q4 2025. As previously disclosed, unusually high rainfall in late January and early
Waste mined was 10.2 million tonnes in Q1 2026 (Q1 2025: 11.3 million tonnes), compared with 9.2 million tonnes in Q4 2025. In addition, waste stripping activities continued at the San Dionisio area.
Processing
The plant processed ore of 4.1 million tonnes in Q1 2026 (Q1 2025: 4.2 million tonnes), compared with 4.1 million tonnes in Q4 2025.
Copper grade was 0.30% in Q1 2026 (Q1 2025: 0.42%), compared with 0.33% in Q4 2025. During the Period, the plant feed was supplemented with low-grade ore stockpiles in order to compensate for pit access limitations following the heavy rainfall events.
Copper recovery was 81.54% in Q1 2026 (Q1 2025: 80.98%), compared with 83.87% in Q4 2025.
Production
Copper production was 9,939 tonnes in Q1 2026 (Q1 2025: 14,291 tonnes), compared with 11,550 tonnes in Q4 2025. In addition, silver contained in copper concentrate was 0.20 million ounces in Q1 2026 (Q1 2025: 0.28 million ounces).
On-site copper concentrate inventories were 5,083 tonnes at
Copper contained in concentrates sold was 9,767 tonnes in Q1 2026 (Q1 2025: 14,687 tonnes), compared with 11,823 tonnes in Q4 2025.
Select Financial Highlights
Realised Copper Price
The average realised copper price (excluding QPs closed during the Period) was
Provisional Revenue Adjustments
For Q1 2026, settlement adjustments (for QPs closed during the Period) and fair value adjustments (for open QPs based on copper forward curve prices as of
Balance Sheet
Consolidated cash and cash equivalents were
Current and non-current borrowings were
Outlook for 2026
Production
Following the impact of rainfall during the Period, the Company plans to review its copper production guidance for FY2026 on an ongoing basis and will provide further updates when the Company reports its Q1 2026 Financial Results in
Previously disclosed production guidance for FY2026 was 50,000 to 54,000 tonnes of copper (with H2 2026 production approximately 10% higher than H1 2026 production) plus silver contained in copper concentrate of 0.9 to 1.1 million ounces.
Operating Costs
With respect to operating costs, the ongoing events in the
Electricity prices in
Any updates to the Company's guidance for FY2026 Cash Costs (
Asset Portfolio Update
Proyecto Riotinto
Stripping activities at San Dionisio continued during the Period, with total waste mined of 3.3 million tonnes in Q1 2026. San Dionisio represents a key component of Atalaya's strategy to increase copper production by sourcing higher-grade material from deposits throughout the
At
Atalaya continues to advance engineering works associated with processing plant modifications that would allow for the simultaneous treatment of polymetallic and copper ores at Riotinto, including refining the layout of the new circuits within the existing plant footprint in order to optimise capital and operating costs.
E-LIX Phase I Plant
In Q1 2026, trials were completed at the E-LIX facility in order to test the technology's suitability for processing ores with high silver content.
Infill drilling continued at the Masa Valverde deposit, where the focus remains on copper-rich stockwork-style zones, which are expected to be amenable for processing at the existing Riotinto facilities. Preparatory work is ongoing ahead of a final Board decision regarding the access ramp.
PMV has been granted the two key permits required for development - the Unified Environmental Authorisation (or in Spanish, Autorización Ambiental Unificada ("AAU")) and the exploitation permit.
Proyecto Touro
Atalaya's local entity Cobre San Rafael ("CSR") continues to advance the permitting process under the Galician legislation that awarded Touro with the status of strategic industrial project (or in Spanish, Proyecto Industrial Estratégico ("PIE")) in 2024.
Adding to the Company's confidence is a recent positive ruling by the High Court of Justice of Galicia ("TSXG") that voids the
Independent of the court ruling, Atalaya and CSR will remain focused on finalising the permitting steps for the new improved project according to the PIE legislation. In preparation for the conclusion of the permitting process, CSR is continuing with detailed engineering and procurement works, land purchases and exploration drilling.
Proyecto Ossa Morena
Drilling is ongoing at the Guijarro gold project, where a total of 17 holes are planned in the current drilling programme.
Proyecto Riotinto East
Drilling will begin at the Cerro Negro permit in the coming weeks.
Skellefte Belt and Rockliden (
In November 2024, Atalaya announced that it had entered into two binding agreements with Mineral Prospektering i Sverige AB ("MPS") pursuant to which Atalaya can earn an initial 75% interest in two separate land packages in
The 2026 winter drilling campaign was completed in late March. While complete assays remain pending and detailed geological interpretations are currently underway, initial results have yielded several positive insights. The programme successfully extended known mineralisation from previous drill holes at both the Skellefte Belt and Rockliden projects. Furthermore, the campaign confirmed the efficacy of ground FLEM (Fixed Loop Electromagnetic) geophysics in refining airborne VTEM targets and successfully detecting sulphide mineralisation.
In 2026, a total of 23 drill holes (6,930 metres) were completed at the Skellefte Belt Project and 9 drill holes (1,812 metres) were completed at the Rockliden Project. Since the commencement of the earn-in agreements, cumulative drilling has totalled 43 holes (12,617 metres) at the Skellefte Belt Project and 25 holes (4,593 metres) at the Rockliden Project.
Over the coming months, ground geophysics will continue across high-priority target areas. This data will be used to define the next phase of drilling, which will focus on testing numerous regional targets and further extending known mineralisation zones.
Corporate Activities Update
Fundraise
In
Proceeds from the fundraise will allow Atalaya to accelerate the development of its copper growth projects in
Investment in Lara Exploration Ltd. (Subsequent Event)
On
The person responsible for arranging release of this announcement on behalf of the Company is
This announcement contains information which, prior to its publication constituted inside information for the purposes of Article 7 of Regulation (EU) No 596/2014.
Contacts:
|
SEC Newgate UK |
|
+44 20 3757 6882 |
|
Atalaya Mining |
|
+34 959 59 28 50 |
About Atalaya Mining Copper, S.A.
Atalaya is a European copper producer that owns and operates the Proyecto Riotinto complex in southwest
Atalaya's operations include the Cerro Colorado open pit mine and a modern 15 Mtpa processing plant, which has the potential to become a central processing hub for ore sourced from its wholly owned regional projects around Riotinto, such as Proyecto Masa Valverde and Proyecto Riotinto East. In addition, Atalaya has a phased earn-in agreement for up to 80% ownership of Cobre San Rafael S.L., which fully owns the Proyecto Touro brownfield copper project in the northwest of
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
Proactive Investors is a publisher of financial news and information. No content in this record, or published on the Proactive Investors website (the "Site"), constitutes a recommendation that any particular security, portfolio of securities, transaction, or investment strategy is suitable or advisable for any specific person. No content is tailored to any specific person's needs, objectives, or financial situation.
Proactive Investors is not a registered investment adviser or broker-dealer and does not provide personalized investment advice. Nothing in this record constitutes investment advice or a recommendation to buy, hold, or sell any security. None of the information providers or their affiliates will advise you personally concerning the nature, potential, advisability, value, or suitability of any particular security, portfolio, transaction, or investment strategy. Any decision to buy, sell, or hold a security should be made only after consulting an appropriately qualified, licensed financial adviser and reading all relevant offering documentation.
This record, and any record we publish by or on behalf of our clients, should not be construed as an offer or solicitation to buy or sell any product or security. Our content is independent financial journalism, produced in a neutral, objective style with full source attribution.
In accordance with the Federal Trade Commission's guidelines on material connections, Proactive Investors discloses the following: we may receive cash or, in some cases, equity compensation from companies whose news is distributed through our platform. This compensation is for news distribution and media services, not for editorial content or coverage decisions. Where Proactive Investors has a commercial relationship with a company covered in this record, that relationship is disclosed within the article. Any such relationship does not determine, influence, or shape the editorial content produced. Where we receive equity compensation, such securities are held independently by a third-party broker and sold at the broker's discretion.
The Site may contain opinions from time to time regarding securities mentioned in other products, including company-related products, and those opinions may differ from those obtained through another Proactive Investors product. Opinions and commentary reflect the views of the named author at the time of writing and are subject to change without notice.
Price and other data is supplied by sources believed to be reliable. Any calculations are made using such data. Neither the data nor the calculations are guaranteed by those sources, by Proactive Investors, by the information providers, or by any other person or entity, and may not be complete or accurate.
From time to time, reference may be made in our marketing materials to previously published articles or opinions. Such references may be selective, may reference only a portion of an article, and are likely not to be current. As markets change continuously, previously published information and data may not be current and should not be relied upon.
FOR OUR FULL DISCLAIMER CLICK HERE