Base Resources Limited2024 Mineral Resources and Ore Reserves Statement

Key Points

 

 

The 2024 Mineral Resources and Ore Reserves estimates forBase Resources Limited(ASX / AIM: BSE) are summarised in the table below, together with the 2023 Mineral Resources and Ore Reserves estimates for comparison. The Mineral Resources and Ore Reserves estimates in this statement are reported in accordance with the JORC Code. 

 

Table 1: 2024 Mineral Resources and Ore Reserves estimates compared with the 2023 estimates.

 

[Notes:

(1): Table may be subject to slight arithmetic differences due to rounding.

(2): Kwale incorporates the Kwale South Dune, Kwale North Dune and Bumamani deposits.

(3): Kwale rutile reported is rutile + leucoxene minerals.

(4): The Ranobe Mineral Resources estimate also specifies the monazite and garnet within the mineral assemblage as a percentage of HM, refer to the standalone table for the Ranobe Mineral Resources estimate below for these percentages.]

 

A glossary of key terms used in this announcement is set out below. All figures referred to in this announcement are attached.

 

 

The Company’s 100% owned Kwale Mineral Sands Operations (Kwale Operations) in is located in Kwale County and approximately 50Kenya kilometres south of Mombasa and 10 kilometres inland from the Kenyan coast. The Company’s wholly-owned subsidiary, Base Titanium, holds SpecialMining Lease No. 23 (SML 23), which contains the Kwale South Dune, the Kwale North Dune and the Bumamani deposits, and has a net attributable interest of 100% in the 2024 Kwale Mineral Resources and Ore Reserves estimates.

 

 

The 2024 Kwale Mineral Resources, as at , are estimated to be 13.5Mt at an average HM grade of 1.6% for 0.22Mt of contained HM, at a 1% HM cut-off grade.30 June 2024

 

Table 2: 2024 Kwale Mineral Resources estimate compared with the 2023 estimate at a 1% HM cut-off grade.

 

Table may be subject to slight arithmetic differences due to rounding. Mineral Resources are reported inclusive of Ore Reserves. 

 

The 2024 Kwale Mineral Resources estimate represents a decrease of approximately 170Mt (or 93%) in material tonnes containing 2.6Mt of HM compared to the 2023 Kwale Mineral Resources estimate. This was primarily due to an update of the Kwale North Dune Mineral Resource to remove material no longer considered to have prospects of eventual economic extraction, together with mining depletion and associated sterilisation of the Kwale South Dune, Kwale North Dune and Bumamani Mineral Resources.

 

The Kwale South Dune Mineral Resources were wholly depleted and/or sterilised following the completion of mining in , a decrease of 8.9Mt containing 0.19Mt of HM compared to the 2023 Kwale South Dune Mineral Resources estimate.January 2024

 

The 2024 Kwale North Dune Mineral Resources are estimated to be 11.4Mt at an average HM grade of 1.6% for 0.19Mt of contained HM as at , a decrease of containing 2.33Mt of HM compared to the 2023 Kwale North Dune Mineral Resources estimate.30 June 2024157Mt  

 

The 2024 Bumamani Mineral Resources are estimated to be 2.2Mt at an average HM grade of 1.7% for 0.04Mt of contained HM as at , a decrease of 3.7Mt containing 0.08Mt of HM compared to the 2023 Bumamani Mineral Resources estimate.30 June 2024

 

An infill drill program on the Kwale North Dune and Bumamani deposits was completed during 2023 for improved resource definition and classification to support detailed mine planning. As part of this drill program, access was obtained to land on the southern boundary of the Bumamani deposit, allowing drilling to further extend the deposit 250 metres along strike. Both the Kwale North Dune and Bumamani Mineral Resources estimates have been updated for the additional drilling and revised mineral assemblage values following refinement of the Kwale MinMod algorithm. The corresponding Kwale North Dune and Bumamani Ore Reserves estimates have also been reported using the updated resource models and revised pit designs.

 

 

Included within the Kwale Mineral Resources are the Kwale Ore Reserves, estimated to be 7.6Mt at an average HM grade of 1.8% for 0.14Mt of contained HM as at .30 June 2024

 

Table 3: 2024 Kwale Ore Reserves estimate compared with the 2023 estimate.

 

Table may be subject to slight arithmetic differences due to rounding.

 

The 2024 Kwale Ore Reserves estimate represents a decrease of approximately 13.7Mt (or 64%) in ore tonnes containing 0.34Mt (or 71%) of HM compared to the 2023 Kwale Ore Reserves estimate.

 

The Kwale South Dune Ore Reserves were wholly depleted and/or sterilised following the completion of mining in , a decrease of 5.2Mt containing 0.13Mt of HM.January 2024

 

The Kwale North Dune Ore Reserves are estimated to be 5.6Mt at an average HM grade of 1.8% for 0.10Mt of contained HM as at 30 , a decrease of 6.6Mt containing 0.15Mt of HM due to mining depletion, sterilisation, and revised pit designs following the 2023 infill drill program referred to above.June 2024

 

The Bumamani Ore Reserves are estimated to be 2.1Mt at an average HM grade of 1.7% for 0.04Mt of contained HM as at , a decrease of 1.9Mt containing 0.05Mt of HM due to mining depletion and sterilisation, partially offset by revised pit designs following the 2023 infill and extensional drill program referred to above.30 June 2024 

 

The Company’s 100% owned Toliara Project is based on the Ranobe deposit, located approximately 45 kilometres north of the town of Toliara and 15km inland from the coast in south-west .Madagascar The Ranobe deposit sits withinPermis d’Exploitation37242, which is a mining lease under Malagasy law and is held by the Company’s wholly-owned subsidiary, Base Toliara SARL. Base Toliara SARL has a net attributable interest of 100% in the 2024 Ranobe Mineral Resources and Ore Reserves estimates.

 

On-ground activities at the Toliara Project have been suspended since the Government of Madagascar-imposed suspension, which was put in place in , pending agreement on the fiscal terms applying to the project.November 2019

 

Following engagement with the Government in early 2024, and as confirmed during recent discussions, Base Resources considers in-principle agreement has been reached on the key fiscal terms that will apply to the whole Toliara Project (i.e. both mineral sands and monazite), although these remain subject to entry of binding documentation and therefore the terms remain subject to change and timing is ultimately uncertain. These key terms include applicable royalties and Base Resources’ required contributions to national and regional development projects, on achieving set milestones (such as achieving the requisite legal and fiscal stability for the project) pre and post a final investment decision.

 

Engagement with the Government is now focused on agreeing the terms of a binding memorandum of understanding (MoU) that records the terms agreed in-principle, a draft of which is well advanced. Lifting of the Toliara Project’s on-ground suspension is expected to occur upon entry into the MoU, which Base Resources believes to be achievable in the near term. Discussions are also underway on the terms of the definitive investment agreement to be entered with the Government that will replace the MoU and will establish the necessary legal foundation for development of the Toliara Project. The intent is for the investment agreement to be approved and ratified by the Malagasy Parliament and have the force of law, following which the Company would seek eligibility certification under the Large Mining Investment Law (LGIM) in order for (among other things) the agreed fiscal regime and then current Malagasy law, as supplemented and clarified by the investment agreement, to be stabilised for the duration of the certification.

 

Once fiscal terms have been recorded in binding arrangements and the suspension has been lifted, Base Resources believes it would take approximately 14 months to complete the necessary work to reach a final investment decision, including:

 

 

In view of the progress made with the Government of Madagascar on agreeing fiscal terms and the terms of the MoU and investment agreement to replace the MoU (both as described above), the Company considers there are reasonable grounds for the project progressing in the near term, allowing the continued public reporting of the Ranobe Ore Reserves estimates. Furthermore (and by extension), the Company also considers that the continued public reporting of the Ranobe Mineral Resources estimates is permissible as resources continue to have reasonable prospects for eventual economic extraction. The basis for this includes the progress made with the Government of Madagascar discussions referred to above, as well as the large scale and high grade nature of the deposit, the completed feasibility studies with test work indicating that typical mineral sands processing recoveries are achievable and the forecast strong economic outcomes. 

 

 

The 2024 Ranobe Mineral Resources are unchanged from the 2023 estimate of 2,580Mt at an average HM grade of 4.3% for of contained HM, based on a 1.5% HM cut-off grade.111Mt 

 

Table 4: The 2024 Ranobe Mineral Resources estimate at a 1.5% HM cut-off grade.

 

Table may be subject to slight arithmetic differences due to rounding. Mineral Resources are reported inclusive of Ore Reserves. 

 

Included within the RanobeMineral Resources are the Ranobe Ore Reserves, estimated to be at an average HM grade of 6.1% for 55Mt of contained HM as at , which is unchanged from the 2023 estimate.904Mt30 June 2024 No monazite or garnet is incorporated in the Ranobe Ore Reserves estimate because the existing mining tenure, Permis D’Exploitation 37242, does not currently provide the right to exploit these minerals.

 

Table 5:The 2024 Ranobe Ore Reserves estimate.

 

Table may be subject to slight arithmetic differences due to rounding.

^Recovered Leucoxene will be split between Rutile and Chloride Ilmenite products depending on product specification requirements.

 

 

The Kwale North Dune and Bumamani Mineral Resources estimates reported in this statement have materially changed since they were last reported in accordance with ASX Listing Rule 5.8 (and the information material to understanding the estimates in relation to the applicable criteria in Table 1 of the JORC Code was publicly disclosed). Consequently, further information about both estimates is set out below and includes the summary information prescribed by ASX Listing Rule 5.8 and the explanatory information provided for the purposes of Sections 1 to 3 of Table 1 of the JORC Code, included as Appendix 1 (Kwale North Dune) and Appendix 2 (Bumamani) to this announcement. To avoid doubt, the Company does not consider the reduced Kwale North Dune and Bumamani Ore Reserve estimates constitute material changes for the purposes of ASX Listing Rule 5.9.

 

For further information about the other estimates in this statement, including information that is material to understanding the estimates in relation to the applicable criteria in Table 1 of the JORC Code, refer to the announcements in the table below, which are available on the Company’s website at .https://baseresources.com.au/investors/announcements/

 

 

 

A summary of the governance, internal controls and estimation process applicable to Base Resources’ Mineral Resources and Ore Reserves estimates is as follows:

 

 

 

 

 

Kwale Operations is located on SML 23, which includes the core of the Kwale North and Bumamani deposits.

 

The Kwale Project initially comprised three broad areas that contained concentrations of heavy minerals. They were the Kwale Central Dune, Kwale South Dune (both now fully depleted by mining and currently undergoing rehabilitation) and the Kwale North Dune deposits (refer to Figure 1 attached), with the Bumamani deposit only being discovered in 2017 after mining operations had commenced.

 

The project was initially owned by Tiomin Resources Inc. (Tiomin) which conducted drilling in 1997 and then by Base Titanium (a wholly-owned subsidiary of Base Resources) which purchased the project late in 2010 and commenced confirmatory and extensional drilling of the Central, South and North Dune deposits. The Kwale North Dune deposit was initially excluded from the project on the basis of heavy mineral grade and the then prevailing economic conditions. However, in 2018, with improved economic conditions, the potential of the Kwale North Dune was re-evaluated using refined resource definition methodology and insights gained from five years of mining the Kwale Central Dune. Following this, the 2019 Kwale North Dune Mineral Resources estimate was completed.

 

The rocks of the area are of sedimentary origin and range in age from Upper Carboniferous to Recent. Three divisions are recognised: the Cainozoic rocks, the Upper Mesozoic rocks (not exposed within the area) and the Duruma Sandstone Series giving rise to the dominant topographical feature of the area: the . The Shimba grits and Mazeras sandstone are of Upper Triassic age and form the Upper Duruma Sandstone.Shimba Hills

 

The Margarini sands form a belt of low hills running parallel to the coast. They rest with slight unconformity on the Shimba grits and Mazeras sandstone. This formation was deposited during Pliocene times and consists mainly of unconsolidated fluviatile sediments derived from the Duruma Sandstone Series.

 

The Kwale deposits are an aeolian subset of the Margarini sands and are generally poorly stratified and contain a fraction of clay, which for the Kwale North Dune and Bumamani deposits is approximately 35% and 20%, respectively. Valuable heavy mineral (VHM), mainly ilmenite, rutile, and zircon are locally concentrated and are abundant in some places, giving rise to the deposits.

 

 

The geological interpretations for the Kwale North Dune deposit considered the data in the drill logs, assay results, microscope logging of HM sinks, detailed mineralogy and knowledge gained from mining the Kwale Central Dune and Kwale South Dune deposits. Four geological domains have been identified at the Kwale North Dune deposit. These were used and honoured during the geological modelling (refer to Figure 2 attached).

 

The uppermost zone, referred to as , is a dark red brown, predominantly fine grained, well sorted silty sand with very little induration and is similar to the units in the other Kwale deposits. Mineralogically, it is characterised by clean, glossy, and rounded HM grains with an average VHM content of approximately 75%.Ore Zone 1Ore Zone 1

 

lies below , with an indurated paleo-surface separating the two zones, as observed in the field through difficult drill bit penetration and pit exposures, and in HM sink logs, exhibiting elevated iron oxides. material is higher in slimes with difficult washability and the grain sorting is generally poor. It is slightly lower in VHM content (~70%), often with elevated iron oxides and alumino-silicate minerals (kyanite, andalusite and sillimanite). is considered a fluvial deposit based on the difficulty of wash and the poor grain sorting.Ore Zone 4Ore Zone 1The Ore Zone 4Ore Zone 4

 

lies below and is separated by a lateritic paleo-surface and is also hosted in a fluviatile clay-rich, poorly sorted formation. It is distinguished mineralogically by an increased amount of almandine garnet that reports to the magnetic fraction, and other trash HM significantly increasing magnesium, manganese, aluminium, and silicon in the oxide chemistry. As a result of this, has a notably lower average VHM content (~45%). was previously reported as part of the Kwale North Dune Mineral Resources estimate, but the material has proven to be problematic for efficient hydraulic mining (due to a combination of high clay content and compaction) and mineral processing (poor quality mineral chemistry and variable mineralogy) and is now excluded.Ore Zone 5Ore Zone 4Ore Zone 5Ore Zone 5

 

lies below and is typically hosted in weathered variants of the Mesozoic (Permo-Triassic) Duruma Sandstones. It does contain mineralisation, however its VHM content is approximately 10% and is predominantly titano-haematite (<40% TiOThe Basement ZoneOre Zone 52), with zircon enrichment in the non-magnetic fraction. is not considered to hold potential for eventual economic extraction due to its low VHM content, depth of burial, high slime content (>40%), variability of mineralisation, and presence of induration.The Basement Zone

 

For all ore zones, a strong correlation between the field logs, HM sink logs and XRF oxide chemistry and QEMSCAN mineralogy gives confidence to these interpretations.

 

Following acquisition of the Kwale Project, subsequent resource drilling of the Kwale North Dune deposit was completed using the reverse circulation, air core (RCAC) method and conducted in four campaigns: , to , to , and to (refer to Figure 3 attached). A total of 590 holes were drilled for 22,860 metres and generated 7,788 sample assays for resource estimation (excludes basement samples) over the current area of tenure. Tiomin had drilled 37 holes in 1997 but due to poor twinned hole assay repeatability, no Tiomin drilling information was used by Base Resources for the resource estimates.November 2010December 2012April 2013June 2018May 2019August 2023September 2023

 

The predominantly three metre sample intervals in the 2010 and 2012/13 drilling were replaced by sampling at 1.5 metre intervals for the 2018/19 and 2023 drill programs to provide greater control on geological boundaries. Sample sizes averaged close to 3kg at this sample interval when collecting 25% of the rotary splitter cycle.

 

Sub-samples of the drill samples were dried, weighed, and screened for material less than 45μm (slimes) and +1 mm (oversize). Approximately 100 grams of the screened sample was subjected to a HM float/sink technique using the heavy liquids, lithium polytungstate and sodium polytungstate with a specific gravity of 2.85gcm-3. The resulting HM concentrate was dried and weighed as were the other separated constituent size fractions (the minus 45μm material being calculated by difference).

 

Mineral assemblage analyses were conducted by Base Resources to characterise the mineralogical and chemical characteristics of specific mineral species and magnetic fractions. These mineral assemblage samples were subjected to magnetic separation using a Mineral Technologies induced-roll magnetic separator which captures magnetic (mag), middling (mid) and non-magnetic (non-mag) fractions. The mid and mag fractions were combined and, with the non-mag fraction, were subjected to XRF analysis using a Bruker, S8 Tiger XRF.

 

Data from the mag and non-mag XRF analyses were then processed through an algorithm (MinMod) that runs multiple iterations in assigning key chemical species to derive a calculated mineralogy determination.

 

Drill hole collar and geology data was captured by industry-specific, field logging software with on-board validation. Field and assay data were managed in a MS Access database and subsequently migrated to a more secure SQL database.

 

Standard samples were generated and certified for use in the field and laboratory. Accuracy of HM and slimes (SL) analysis was verified by using the standard samples and monitored using control charts. Standard errors greater than three standard deviations from the mean prompted batch re-assay. A standard precision analysis was conducted on the key assay fields: HM, SL and oversize (OS) for both laboratory and field duplicate samples. Normal scatter and QQ plots were prepared for HM, SL and OS for laboratory and field duplicates.

 

A twin drilling program was introduced for the 2018/19 program to quantify short-range variability in geological character and grade intersections. A water injection versus dry drilling assessment was included in the twin drilling analysis. Field and laboratory duplicate, standard and twin drilling analysis show adequate level of accuracy and precision to support resource classifications as stated.

 

A topographic DTM was prepared by Base Resources based on a LIDAR survey.

 

Construction of the geological grade model was based on coding model cells inside solid wireframe surfaces, comprising topography, and geology (Ore Zones 1, 4, and 5) (refer to Figure 2 attached). Model cell dimensions of 50m x 50m x 1.5m in the XYZ orientations were utilised.

 

Interpolation was undertaken using various sized search ellipses to populate the model with primary grade fields (HM, SL, OS, ILM, RUT and ZIR), and index fields (hardness, induration percent, mineralogy). Inverse distance weighting to a power of three was used for primary assay fields whilst nearest neighbour was used to interpolate index fields. The attached Figure 4 shows an oblique view of the model coloured by HM grades.

 

A fixed bulk density of 1.7 (t/m3) was applied to the 2024 Kwale North Dune Mineral Resources model. This bulk density was selected based on operational experience in the Kwale Central Dune, Kwale South Dune and Kwale North Dune deposits and because no specific deposit bulk density sampling was undertaken.

 

The Kwale North Dune deposit is amenable to being mined and processed in a similar way as the Kwale South Dune and using the existing plant and equipment at the Kwale Operations: hydraulic mining, spiral concentrator and mineral separation plant with magnetic, electrostatic and further gravity separation. , requires mechanical mining assistance to break up compacted clays for subsequent hydraulic mining. Fine and coarse tailings are partially co-disposed together.Unlike Ore Zone 1Ore Zone 4

 

The mining, metallurgical and operating cost modifying factors for the Kwale North Dune deposit have proven to be similar to those derived from mining the Kwale South Dune deposit, albeit marginally higher cost due to the mechanical mining assistance required to break up compacted clays in . It is considered that the Kwale North Dune deposit has reasonable prospects for eventual economic extraction when evaluated in the context of being part of an active mining operation and taking into consideration the form, characteristics and grade of the deposit.Ore Zone 4

 

The criteria used for classification was primarily the drill spacing (predominantly 100m x 100m) and sample interval (predominantly 1.5m), with consideration also given to the continuity of mineral assemblage information. The ore zones exhibit spatially different classifications mainly because of differing density of mineralogical information and variography. An infill drill program in 2023 has increased confidence levels in the 2024 Kwale North Dune Mineral Resources estimate. The 2024 Kwale North Dune Mineral Resources estimate used a 1% HM bottom cut because the economic cut-off grade established by financial modelling is near to this, and resource estimates for Kwale Operations have historically been reported at this cut-off grade. The attached Figure 3 shows the distribution of the resource classifications for Ore Zones 1 and 4, respectively.

 

The significant decrease in material tonnes between the 2021 and 2024 Kwale North Dune Mineral Resources estimates is that the area available for short term mining is constrained to an operational envelope within SML 23 as the prospects for eventual economic extraction outside of the current operational envelope are considered poor given the low HM grade, high slimes content, lack of capacity for slimes tailings storage and high cost and extended timeframes for land acquisition.

 

 

The geological interpretations for the Bumamani deposit considered the data in the drill logs, assay results, microscopic logging of HM sinks, detailed mineralogy and knowledge gained from mining the Kwale Central Dune and Kwale South Dune deposits. Four geological domains have been identified at the Bumamani deposit. These were used and honoured during the geological modelling (refer to Figure 5 attached).

 

The uppermost zone at the Bumamani deposit, referred to as , is a dark red brown, predominantly fine grained, well sorted silty sand with very little induration and is similar to the units in the other Kwale deposits. It averages 2.3% HM, 21% SL and 2% OS. The zone gets sandier to the east with reduced silt content. Mineralogically it is characterised by clean, glossy and rounded HM grains with an average VHM content of approximately 80% VHM.Ore Zone 1Ore Zone 1

 

is a newly recognised unit in the 2024 Bumamani Mineral Resources estimate that occurs along the eastern edge of the Bumamani deposit where there is a distinct but shallow topographic dip that is interpreted as a paleoshoreline hosting pale coloured, well sorted, upwards fining, medium grained sands. The contact with appears transitional and likely reflects some reworking, with no present east of the shallow scarp feature. averages 1.8% HM, 13% SL and 2% OS and has similar mineralogy to with slight enrichment of rutile and zircon.Ore Zone 20Ore Zone 1Ore Zone 1Ore Zone 20Ore Zone 1

 

lies below and , with the contact represented by a lateritic paleo-surface which may imply a time-gap in depositional history. is a fluviatile unit represented locally with poorly sorted sandy clays and gritty sands. domain averages 1.7% HM, 21% SL and 8% OS. is mineralogically similar to with minor depletion of rutile and zircon.Ore Zone 4Ore Zone 1Ore Zone 20Ore Zone 4The Ore Zone 4Ore Zone 4Ore Zone 1

 

at the Bumamani deposit lies beneath and comprises compacted clays, sandy-clays, limestone and fluvial sands. The grain sizes range from silt to pebbles and boulders, with generally poor sorting and is characterised by trace concentrations of HM typically with low VHM content.The Basement ZoneOre Zone 4

 

For all ore zones, a strong correlation between the field logs, HM sink logs and XRF oxide chemistry and QEMSCAN mineralogy gives confidence to these interpretations.

 

Drilling of the Bumamani deposit was primarily completed using the RCAC method and conducted in three campaigns in 2017, 2018 and 2023 all employing 76mm diameter, 3m long NQ drill rods. A small mechanical auger drilling program was completed in early 2024 for resource edge definition purposes.A total of 243 holes were drilled for 3,912m at 1.5m sampling intervals and generated 3,265 assayed samples for resource estimation (excludes basement samples)(refer to Figure 6 attached). Holes were drilled 50m apart on lines 100m apart. Samples from 2017 and 2018 were split using a rig mounted rotary splitter which delivered an average of 2.7kg of dry sample per interval. Samples from 2023 were typically drilled wet with the total interval sample collected and subsequently air dried and riffle split off site.

 

Samples were dried, weighed, and screened for material less than 45μm (slimes) and +1 mm (oversize). Approximately 100 grams of the screened sample was subjected to a HM float/sink technique using the heavy liquid sodium polytungstate with a specific gravity of 2.85gcm-3. The resulting HM concentrate was dried and weighed as were the other separated constituent size fractions (the minus 45μm material being calculated by difference).

 

Mineral assemblage analyses were conducted to characterise the mineralogical and chemical characteristics of specific mineral species and magnetic fractions. These mineral assemblage samples were subjected to magnetic separation using a Mineral Technologies induced-roll magnetic separator which captures mag, mid and non-mag fractions. The mid and mag fractions were combined and, with the non-mag fraction, were subjected to XRF analysis using a Bruker, S8 Tiger XRF.

 

Data from the mag and non-mag XRF analyses are processed through the MinMod algorithm that runs multiple iterations in assigning key chemical species to derive a calculated mineralogy determination.

 

Drill hole collar and geology data was captured by industry-specific, field logging software with on-board validation. Field and assay data were managed in a MS Access database and subsequently migrated to a more secure SQL database.

 

Standard samples were generated and certified for use in the field and laboratory. Accuracy of HM and SL analysis was verified by using the standard samples and monitored using control charts. Standard errors greater than three standard deviations from the mean prompted batch re-assay. A standard precision analysis was conducted on the key assay fields: HM, SL and OS for both laboratory and field duplicate samples. Normal scatter and QQ plots were prepared for HM, SL and OS for laboratory and field duplicates.

 

A twin drilling program was introduced for the 2018 program to quantify short-range variability in geological character and grade intersections. A water injection versus dry drilling assessment was included in the twin drilling analysis. Field and laboratory duplicate, standard and twin drilling analysis show adequate level of accuracy and precision to support resource classifications as stated.

 

A topographic DTM was prepared by Base Resources based on a LIDAR survey.

 

Construction of the geological grade model was based on coding model cells inside solid wireframe surfaces, comprising topography, and geology (refer to Figure 5 attached). Model cell dimensions of 50m x 50m x 1.5m in the XYZ orientations were utilised.

 

Interpolation was undertaken using various sized search ellipses to populate the model with primary grade fields (HM, SL, OS and mineralogy), and index fields (hardness, induration percent). Inverse distance weighting to a power of three was used for primary assay fields whilst nearest neighbour was used to interpolate index fields. The attached Figure 7 shows an oblique view of the model coloured by HM grade.

 

A fixed bulk density of 1.7 (t/m3) was applied to the 2024 Bumamani Mineral Resources model. This bulk density was selected based on operational experience in the Kwale Central Dune and Kwale South Dune deposits and because no deposit bulk density sampling was undertaken.

 

The Bumamani deposit, being similar in nature to the Kwale South Dune deposit recently mined, is amenable to being mined and processed in the same way by using the existing plant and equipment at the Kwale Operations: hydraulic mining, spiral concentrator and mineral separation plant with magnetic, electrostatic and further gravity separation. Modifications from previous methodology is that the fine and coarse tailings are partially co-disposed together.

 

The mining, metallurgical and operating cost modifying factors for the Bumamani deposit have proven to be similar to those derived from mining the Kwale South Dune deposit, and it is considered that the Bumamani deposit has reasonable prospects for eventual economic extraction when evaluated in the context of being part of an active mining operation and taking into consideration the form, characteristics and grade of the deposit.

 

The criteria used for classification was primarily the drill spacing (predominantly 100m x 50m at Bumamani) and sample interval (predominantly 1.5m), with consideration also given to the continuity of mineral assemblage information. The ore zones exhibit spatially different classifications mainly because of differing density of mineralogical information and variography. An infill drill program in 2023 for detailed mine planning has increased confidence levels in the 2024 Bumamani Mineral Resources estimate. The 2024 Bumamani Mineral Resources estimate used a 1% HM bottom cut because the economic cut-off grade established by financial modelling is near to this, and resource estimates for Kwale Operations have historically been reported at this cut-off grade. The attached Figure 6 show the distribution of the resource classifications for Ore Zones 1, 20 and 4 at Bumamani.

 

The 2024 Bumamani Mineral Resources estimate is constrained to the area available for short term mining (an operational envelope around the current mining pit within SML 23 that considers buffer zones and infrastructure location).

 

 

The information in this statement that relates to Mineral Resources and Ore Reserves is based on, and fairly represents, information and supporting documentation prepared by the Competent Persons named in the table below. Each Competent Person:

 

 

Mr Ian Reudavey has also approved this statement as a whole. 

 

Mr Ian Reudavey is employed by Base Resources and presently holds equity securities in Base Resources. Mr Reudavey is also entitled to participate in Base Resources’ long-term incentive plan and receive equity securities under that plan. Mr and Mr are both employed by Base Titanium, Base Resources’ wholly owned subsidiary.Scott CarruthersEdwin Owino and hold equity securities in Base Resources and are also entitled to participate in Base Resources’ long-term incentive plan and receive equity securities under that plan.Mr CarruthersMr Owino Details about that plan are included in Base Resources’ 2023 Annual Report.

 

 

 

Certain statements in or in connection with this statement contain or comprise forward looking statements. Such statements may include, but are not limited to, statements with regard to future production and grades, capital cost, capacity, sales projections and financial performance and may be (but are not necessarily) identified by the use of phrases such as “will”, “expect”, “anticipate”, “believe” and “envisage”. By their nature, forward looking statements involve risk and uncertainty because they relate to events and depend on circumstances that will occur in the future and may be outside Base Resources’ control. Accordingly, results could differ materially from those set out in the forward-looking statements as a result of, among other factors, changes in economic and market conditions, success of business and operating initiatives, changes in the regulatory environment and other government actions, fluctuations in product prices and exchange rates and business and operational risk management. Subject to any continuing obligations under applicable law or relevant stock exchange listing rules, Base Resources undertakes no obligation to update publicly or release any revisions to these forward-looking statements to reflect events or circumstances after today’s date or to reflect the occurrence of unanticipated events.

Appendix 1 – Sections 1 to 3 of Table 1 of the JORC Code for 2024 Kwale North Dune Mineral Resources estimate

 Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

 

 

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

 

 

Section 3 Estimation and Reporting of Mineral Resources

(Criteria listed in section 1, and where relevant in section 2, also apply to this section.)

 

 

 

Appendix 2 – Sections 1 to 3 of Table 1 of the JORC Code for the 2024 Bumamani Mineral Resources estimate

 

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

 

 

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

 

Section 3 Estimation and Reporting of Mineral Resources

(Criteria listed in section 1, and where relevant in section 2, also apply to this section.)

 

 

ENDS.

 

For further information contact:

 

This release has been authorised by the Base Resources Disclosure Committee.

 

About Base Resources

Base Resources is an Australian based, African focused, mineral sands producer and developer with a track record of project delivery and operational performance. The Company operates the established Kwale Operations in and is developing the Toliara Project in .KenyaMadagascar Base Resources is an ASX and AIM listed company. Further details about Base Resources are available at.www.baseresources.com.au

 

PRINCIPAL & REGISTERED OFFICELevel 3, 46 Colin Street, 6005West Perth, Western AustraliaEmail: Phone: +61 8 9413 7400Fax: +61 8 9322 8912




info@baseresources.com.au

 

NOMINATED ADVISER & JOINT BROKERCanaccord Genuity Limited/ /James AsensioRaj KhatriGeorge GraingerPhone: +44 20 7523 8000


 

JOINT BROKERBerenberg/ Detlir EleziMatthew ArmittPhone: +44 20 3207 7800


--  Kwale North Dune Mineral Resources and Ore Reserves estimates reduced
        due to mining depletion and related sterilisation during the year to 30
        , and removal of Mineral Resources no longer considered to have
        prospects of eventual economic extraction, resulting in:June 2024
o Mineral Resources reducing by  and 2.33Mt of heavy mineral.
o Ore Reserves reducing by 6.6Mt and 0.15Mt of heavy mineral.157Mt
--  Bumamani Mineral Resources and Ore Reserves estimates reduced on an
        overall basis due to mining depletion and related sterilisation during
        the year to , only being partially offset by increases from
        extensional drilling following additional land access, with:30 June 2024
o Mineral Resources reducing by 3.7Mt and 0.08Mt of heavy mineral.
o Ore Reserves reducing by 1.9Mt and 0.05Mt of heavy mineral.
--  Kwale South Dune Mineral Resources and Ore Reserves estimates were fully
        depleted and/or sterilised following completion of mining in .
    --  The Toliara Project’s Ranobe Mineral Resources and Ore Reserves
        estimates are both unchanged.January
        2024
20241                                    20231

        as at 30 June 2024                       as at 30 June 2023

                                HM Assemblage                            HM Assemblage

        Tonnes HM   HM  SL  OS  ILM RUT LEUC ZIR Tonnes HM   HM  SL  OS  ILM RUT LEUC ZIR

        (Mt)   (Mt) (%) (%) (%) (%) (%) (%)  (%) (Mt)   (Mt) (%) (%) (%) (%) (%) (%)  (%)

Mineral Resources

(Measured + Indicated + Inferred, inclusive of Ore Reserves)

Kwale2  13.5   0.22 1.6 36  1.1 51  153 -    5.8 184    2.8  1.5 36  1.9 45  133 -    5.8

Ranobe4 2,580  111  4.3 7.7 0.4 71  1.0 1.0  5.9 2,580  111  4.3 7.7 0.4 71  1.0 1.0  5.9

Ore Reserves

(Proved + Probable)

Kwale   7.6    0.14 1.8 33  1.3 52  16  -    6.2 21     0.5  2.2 32  2.1 52  14  -    6.1

Ranobe  904    55   6.1 3.8 0.1 73  1.0 1.0  5.9 904    55   6.1 3.8 0.1 73  1.0 1.0  5.9
2024                                2023

          as at 30 June 2024                  as at 30 June 2023

                                  HM                                   HM
                                  Assemblage                           Assemblage

Category  Tonnes HM   HM  SL  OS  ILM RUT ZIR Tonnes HM    HM  SL  OS  ILM RUT ZIR

          (Mt)   (Mt) (%) (%) (%) (%) (%) (%) (Mt)   (Mt)  (%) (%) (%) (%) (%) (%)

Kwale South Dune Mineral Resources

Measured  -      -    -   -   -   -   -   -   4.9    0.11  2.2 26  2.3 59  14  6.1

Indicated -      -    -   -   -   -   -   -   4.0    0.09  2.2 27  6.1 57  14  6.0

Total     -      -    -   -   -   -   -   -   8.9    0.19  2.2 26  4.0 58  14  6.1

Kwale North Dune Mineral Resources

Measured  8.1    0.13 1.7 38  0.6 52  15  5.5 104    1.60  1.5 37  1.5 40  13  5.4

Indicated 3.3    0.05 1.6 39  1.0 50  14  5.2 62     0.89  1.4 37  2.1 49  14  6.1

Inferred  -      -    -   -   -   -   -   -   2      0.03  1.2 37  2.9 49  15  6.5

Total     11.4   0.19 1.6 38  0.7 51  15  5.4 169    2.51  1.5 37  1.8 43  13  5.7

Bumamani Mineral Resources

Measured  1.7    0.03 1.8 20  2.2 51  17  8.2 3.0    0.066 2.2 19  2.2 48  15  7.5

Indicated 0.5    0.01 1.6 22  7.2 52  16  7.4 2.6    0.045 1.7 23  5.2 47  16  7.7

Inferred  -      -    -   -   -   -   -   -   0.3    0.004 1.4 27  6.1 41  14  7.8

Total     2.2    0.04 1.7 20  3.4 51  17  8.0 5.9    0.115 1.9 21  3.8 47  15  7.6

Total Kwale Mineral Resources

Measured  9.8    0.16 1.7 35  0.9 52  15  5.9 112    1.77  1.6 36  1.6 41  13  5.5

Indicated 3.8    0.06 1.6 37  1.7 50  14  5.5 69     1.02  1.5 36  2.5 50  14  6.2

Inferred  -      -    -   -   -   -   -   -   3      0.03  1.2 36  3.3 48  15  6.7

Total     13.5   0.22 1.6 36  1.1 51  15  5.8 184    2.82  1.5 36  1.9 45  13  5.8
2024                                  2023

         as at 30 June 2024                    as at 30 June 2023

                                   HM                                   HM
                                   Assemblage                           Assemblage

Category Tonnes HM     HM  SL  OS  ILM RUT ZIR Tonnes HM   HM   SL  OS  ILM RUT ZIR

         (Mt)   (Mt)   (%) (%) (%) (%) (%) (%) (Mt)   (Mt) (%)  (%) (%) (%) (%) (%)

Kwale South Dune Ore Reserves

Proved   -       -    -    -   -   -   -   -   3.6    0.09 2.4  27  2.2 59  14  6.1

Probable -       -    -    -   -   -   -   -   1.6    0.05 3.0  26  7.4 57  13  6.1

Total    -       -    -    -   -   -   -   -   5.2    0.13 2.6  27  3.8 58  14  6.1

Kwale North Dune Ore Reserves

Proved   4.6     0.08 1.9  38  0.5 53  15  5.6 7.3    0.15 2.1  39  0.7 48  13  5.5

Probable 1.0     0.02 1.8  39  1.1 49  14  5.1 4.9    0.10 2.1  38  1.6 52  13  5.9

Total    5.6     0.10 1.8  38  0.6 53  15  5.5 12.1   0.25 2.1  39  1.1 50  13  5.6

Bumamani Ore Reserves

Proved   1.6     0.03 1.7  20  2.1 51  17  8.2 2.6    0.06 2.3  19  2.2 48  16  7.5

Probable 0.4     0.01 1.7  22  7.5 52  16  7.3 1.3    0.03 2.2  19  5.3 48  16  7.6

Total    2.1     0.04 1.7  20  3.3 51  17  8.0 3.9    0.09 2.3  19  3.2 48  16  7.5

Total Kwale Ore Reserves

Proved   6.2     0.11 1.8  33  0.9 53  16  6.3 13.5   0.30  2.2 32  1.4 51  14  6.1

Probable 1.4     0.03 1.8  34  3.0 50  15  5.7 7.8    0.18  2.3 33  3.4 53  14  6.2

Total    7.6     0.14 1.8  33  1.3 52  16  6.2 21.3   0.48  2.2 32  2.1 52  14  6.1
--  completion of the necessary land acquisitions;
    --  finalisation of funding arrangements;
    --  ratification of the investment agreement and LGIM eligibility
        certification; and
    --  entry into offtake agreements and major construction contracts.
Mineral Assemblage as %
                                  of HM

Category  Tonnes HM   HM  SL  OS  ILM RUT LEUC ZIR MON GARN

          (Mt)   (Mt) (%) (%) (%) (%) (%) (%)  (%) (%) (%)

2024 Ranobe Mineral Resources

(as at 30 June 2024)

Measured  597    36   6.1 4.3 0.2 74  1.0 1.0  5.9 1.9 2.2

Indicated 793    35   4.4 7.1 0.5 71  1.0 1.0  5.9 2.0 3.6

Inferred  1,190  39   3.3 9.7 0.6 69  1.0 1.0  5.8 2.0 4.3

Total     2,580  111  4.3 7.7 0.4 71  1.0 1.0  5.9 2.0 3.4
Mineral
                                 Assemblage as %
                                 of HM

Category Tonnes HM   HM  SL  OS  ILM RUT LEUC^ ZIR

         (Mt)   (Mt) (%) (%) (%) (%) (%) (%)   (%)

2024 Ranobe Ore Reserves

(as at 30 June 2024)

Proved   433    30   6.9 3.8 0.1 75  1.0 1.0   6.0

Probable 472    25   5.3 3.9 0.2 72  1.0 1.0   5.8

Total    904    55   6.1 3.8 0.1 73  1.0 1.0   5.9
Deposit(s)                       Announcement   Estimate Date Release Date
                                 Title

                                 Maiden Kwale
Kwale North Dune                 North Dune and
and Bumamani     Ore Reserves    Bumamani Ore   20 June 2022  20 June 2022
                                 Reserves
                                 estimates

Ranobe                           Updated Ranobe
                 Mineral         Mineral        27 September
(Toliara         Resources & Ore Resources and  2021          27 September 2021
Project)         Reserves        Ore Reserves
                                 estimates

                 Mineral         2023 Mineral
2023             Resources & Ore Resources and  30 June 2023  12 August 2022
Comparatives     Reserves        Ore Reserves
                                 Statement
--  Review and validation of drilling and sampling methodology and data
        spacing, geological logging, data collection and storage, sampling and
        analytical quality control.
    --  Geological interpretation – review of known and interpreted structure,
        lithology and weathering controls.
    --  Estimation methodology – relevant to mineralisation style and proposed
        mining methodology.
    --  Comparison of estimation results with previous mineral resources models,
        and with results using alternate modelling methodologies.
    --  Visual validation of block model against raw composite data.
    --  Assessment of reasonable prospects for eventual economic extraction.
    --  Use of external Competent Persons to assist in preparation of initial
        Mineral Resources estimates or complete an independent review of initial
        Mineral Resources estimates.
--  Review of potential mining methodology to suit deposit and
        mineralisation characteristics.
    --  Review of potential Modifying Factors, including cost assumptions and
        commodity prices to be utilised in mining evaluation.
    --  Ore Reserves estimate updates initiated following material changes in
        the relevant Modifying Factor assumptions.
    --  Optimisation using appropriate software packages for open pit
        evaluation.
    --  Design based on optimisation results.
    --  Use of external Competent Persons to assist in preparation of initial
        Ore Reserves estimates.
--  is a Member or Fellow of The Australasian Institute of Mining and
        Metallurgy or the Australian Institute of Geoscientists;
    --  has sufficient experience that is relevant to the style of
        mineralisation and type of deposits under consideration and to the
        activity which they are undertaking to qualify as a Competent Person as
        defined in the JORC Code and as a qualified person for the purposes of
        the AIM Rules for Companies; and
    --  consents to the inclusion in this statement of the relevant estimate(s)
        listed alongside their name in table below in the form and context in
        which the estimate and the relevant information are presented.
__________________________________________________________________________
|Name            |Estimate(s)                    |Employer                 |
|________________|_______________________________|_________________________|
|                |Kwale Mineral Resources and Ore|                         |
|                |Reserves (overall), Kwale North|                         |
|Ian Reudavey    |Dune Mineral Resources, Ranobe |Base Resources, full-time|
|                |Mineral Resources, Kwale North |employee                 |
|                |Dune Ore Reserves and Bumamani |                         |
|                |Ore Reserves                   |                         |
|________________|_______________________________|_________________________|
|Scott Carruthers|Ranobe Ore Reserves            |Base Titanium, full-time |
|                |                               |employee                 |
|________________|_______________________________|_________________________|
|Edwin Owino     |Bumamani Mineral Resources     |Base Titanium, full-time |
|                |                               |employee                 |
|________________|_______________________________|_________________________|
______________________________________________________________________________
|Criteria                 |Explanation              |Comment                   |
|_________________________|_________________________|__________________________|
|                         |                         |RCAC drilling was used to |
|                         |                         |collect downhole samples  |
|                         |                         |for the project.          |
|                         |Nature and quality of    |                          |
|                         |sampling (e.g. cut       |For pre-2023 drilling a   |
|                         |channels, random chips,  |rig mounted rotary        |
|                         |or specific specialised  |splitter was used to      |
|                         |industry standard        |collect 25% of the        |
|                         |measurement tools        |downhole sample interval, |
|                         |appropriate to the       |equating to ~6kg for a 3m |
|                         |minerals under           |interval and 3kg for a    |
|                         |investigation, such as   |1.5m interval.            |
|                         |down hole gamma sondes,  |                          |
|                         |or handheld XRF          |For 2023 drilling the     |
|                         |instruments, etc). These |entire 1.5m downhole      |
|                         |examples should not be   |sample interval (averaging|
|                         |taken as limiting the    |~10kg) was collected from |
|                         |broad meaning of         |which approximately 4kg   |
|                         |sampling.                |was obtained via two-stage|
|                         |                         |riffle splitting.         |
|                         |Include reference to     |                          |
|                         |measures taken to ensure |Of the 590 drill holes    |
|                         |sample representivity and|used, 73 of them (drilled |
|                         |the appropriate          |between 2010 – mid 2012)  |
|                         |calibration of any       |utilised 3m sample        |
|                         |measurement tools or     |intervals. The remaining  |
|                         |systems used.            |517 drill holes used 1.5m |
|                         |                         |sample intervals from     |
|Sampling techniques      |Aspects of the           |mid-2012 to 2023.         |
|                         |determination of         |                          |
|                         |mineralisation that are  |Duplicate samples were    |
|                         |Material to the Public   |collected at the splitter |
|                         |Report. In cases where   |for every 20th sample     |
|                         |‘industry standard’ work |simultaneously with the   |
|                         |has been done this would |original sample.          |
|                         |be relatively simple     |                          |
|                         |(e.g. ‘reverse           |A representative grab     |
|                         |circulation drilling was |sample from the sample    |
|                         |used to obtain 1m samples|bags was routinely washed |
|                         |from which 3kg was       |and panned for            |
|                         |pulverised to produce a  |lithological logging as   |
|                         |30g charge for fire      |well as a visual HM       |
|                         |assay’). In other cases  |content estimate.         |
|                         |more explanation may be  |                          |
|                         |required, such as where  |Samples were analysed by  |
|                         |there is coarse gold that|mineral sands industry    |
|                         |has inherent sampling    |standard techniques of    |
|                         |problems. Unusual        |screening, desliming and  |
|                         |commodities or           |heavy liquid separation   |
|                         |mineralisation types     |using LST (lithium        |
|                         |(e.g. submarine nodules) |heteropolytungstate) or   |
|                         |may warrant disclosure of|SPT (sodium polytungstate)|
|                         |detailed information.    |at SG of 2.85g/cm3. XRF   |
|                         |                         |analysis of HM magnetic   |
|                         |                         |fractions was used to     |
|                         |                         |define the mineral        |
|                         |                         |assemblage.               |
|_________________________|_________________________|__________________________|
|                         |                         |73 holes in the 2010 and  |
|                         |                         |2012/2013 campaigns were  |
|                         |                         |drilled with a RCAC Wallis|
|                         |                         |Mantis 75 drill rig using |
|                         |                         |NQ drill tooling of about |
|                         |                         |76mm in diameter and a    |
|                         |                         |3-blade aircore vacuum    |
|                         |                         |face sampling bit.        |
|                         |                         |                          |
|                         |                         |480 holes in the 2018/19  |
|                         |                         |campaign were drilled with|
|                         |                         |a RCAC Wallis Mantis 80   |
|                         |                         |drill rig, also using NQ  |
|                         |                         |drill tooling.            |
|                         |                         |                          |
|                         |                         |37 holes in the 2023      |
|                         |                         |campaign were drilled with|
|                         |Drill type (e.g. core,   |a RCAC EVH2100 drill rig, |
|                         |reverse circulation,     |also using NQ drill       |
|                         |open-hole hammer, rotary |tooling and a 3-blade     |
|                         |air blast, auger, Bangka,|aircore vacuum face       |
|                         |sonic, etc) and details  |sampling bit.             |
|Drilling techniques      |(e.g. core diameter,     |                          |
|                         |triple or standard tube, |For the 2010 and 2012/13  |
|                         |depth of diamond tails,  |campaigns, the mast was   |
|                         |face-sampling bit or     |oriented vertically (90°) |
|                         |other type, whether core |by sight. For the 2018/19 |
|                         |is oriented and if so, by|and 2023 drilling         |
|                         |what method, etc).       |campaign, the rig mast was|
|                         |                         |orientated vertically by  |
|                         |                         |spirit level prior to     |
|                         |                         |drilling to adhere to best|
|                         |                         |practice for geological   |
|                         |                         |boundary delineation.     |
|                         |                         |                          |
|                         |                         |Drilling was recorded in  |
|                         |                         |geological logs as either |
|                         |                         |dry or water injected,    |
|                         |                         |depending on ground       |
|                         |                         |conditions. Water         |
|                         |                         |injection was typically   |
|                         |                         |employed to assist with   |
|                         |                         |penetration through       |
|                         |                         |clays/rock and maintain   |
|                         |                         |sample quality and        |
|                         |                         |delivery.                 |
|_________________________|_________________________|__________________________|
|                         |                         |Sample condition was      |
|                         |                         |logged at the rig as      |
|                         |                         |either good, moderate or  |
|                         |                         |poor, with good meaning   |
|                         |                         |not contaminated and      |
|                         |Method of recording and  |appropriate sample size   |
|                         |assessing core and chip  |(recovery), moderate      |
|                         |sample recoveries and    |meaning not contaminated, |
|                         |results assessed.        |but sample over or under  |
|                         |                         |sized, and poor meaning   |
|                         |Measures taken to        |contaminated or grossly   |
|                         |maximise sample recovery |over/undersized.          |
|                         |and ensure representative|                          |
|Drill sample recovery    |nature of the samples.   |Moist ground conditions   |
|                         |                         |with approximately 35%    |
|                         |Whether a relationship   |silt/clay meant that best |
|                         |exists between sample    |sample quality was        |
|                         |recovery and grade and   |achieved via slow         |
|                         |whether sample bias may  |penetration with water    |
|                         |have occurred due to     |injection to aid in the   |
|                         |preferential loss/gain of|sample recovery.          |
|                         |fine/coarse material.    |                          |
|                         |                         |No relationship is        |
|                         |                         |believed to exist between |
|                         |                         |grade and sample recovery.|
|                         |                         |No bias is also believed  |
|                         |                         |to occur due to loss of   |
|                         |                         |fine material.            |
|_________________________|_________________________|__________________________|
|                         |                         |Field logging was recorded|
|                         |                         |for all down-hole         |
|                         |                         |intervals and was         |
|                         |                         |conducted by the site     |
|                         |                         |Geologist as drilling and |
|                         |                         |sampling proceeded.       |
|                         |                         |Logging was based on a    |
|                         |                         |representative grab sample|
|                         |                         |that was panned for heavy |
|                         |                         |mineral estimation and    |
|                         |                         |host material             |
|                         |                         |observations.             |
|                         |                         |                          |
|                         |                         |Standardised logging codes|
|                         |                         |are developed in the      |
|                         |Whether core and chip    |logging software          |
|                         |samples have been        |(LogChief) to capture     |
|                         |geologically and         |observations on lithology,|
|                         |geotechnically logged to |colour, grainsize,        |
|                         |a level of detail to     |induration and estimated  |
|                         |support appropriate      |mineralisation. Any       |
|                         |Mineral Resource         |relevant comments e.g.,   |
|                         |estimation, mining       |water table, gangue HM    |
|                         |studies and metallurgical|components and            |
|                         |studies.                 |stratigraphic markers were|
|Logging                  |                         |included to aid in the    |
|                         |Whether logging is       |subsequent geological     |
|                         |qualitative or           |modelling.                |
|                         |quantitative in nature.  |                          |
|                         |Core (or costean,        |A qualitative estimate of |
|                         |channel, etc)            |how representative a      |
|                         |photography.             |sample was of the drilled |
|                         |                         |interval was recorded by  |
|                         |The total length and     |Base Titanium field       |
|                         |percentage of the        |geologists whilst logging.|
|                         |relevant intersections   |                          |
|                         |logged.                  |Heavy mineral sinks from  |
|                         |                         |assayed samples were      |
|                         |                         |logged routinely under a  |
|                         |                         |reflected-light,          |
|                         |                         |stereoscopic microscope.  |
|                         |                         |This work was carried out |
|                         |                         |to capture information    |
|                         |                         |relating to VHM content,  |
|                         |                         |mineralogy, HM grainsize  |
|                         |                         |and quality.              |
|                         |                         |                          |
|                         |                         |The logging is of         |
|                         |                         |sufficient detail to      |
|                         |                         |support Mineral Resource  |
|                         |                         |estimation, mining studies|
|                         |                         |and metallurgical studies.|
|_________________________|_________________________|__________________________|
|                         |                         |For pre-2023 drilling,    |
|                         |                         |approximately 25% of the  |
|                         |                         |sample interval was rotary|
|                         |                         |split at the sampling     |
|                         |                         |cyclone on the rig.       |
|                         |                         |                          |
|                         |                         |For 2023 drilling the     |
|                         |                         |entire sample interval was|
|                         |                         |collected mostly wet and  |
|                         |                         |bagged on site in         |
|                         |                         |polyweave bags with       |
|                         |                         |internal plastic lining to|
|                         |                         |avoid loss of slimes.     |
|                         |                         |Following air drying of   |
|                         |                         |excess moisture an        |
|                         |                         |approximate 25% split of  |
|                         |                         |the drilled sample        |
|                         |                         |interval was collected via|
|                         |                         |riffle splitting.         |
|                         |                         |                          |
|                         |                         |The split sample was      |
|                         |                         |processed in a dedicated  |
|                         |                         |sample preparation        |
|                         |                         |facility that follows     |
|                         |                         |conventional mineral sands|
|                         |                         |processes. Samples were   |
|                         |                         |air-dried when weather    |
|                         |                         |permitted, otherwise oven |
|                         |                         |dried during wet weather. |
|                         |                         |After drying, the sample  |
|                         |                         |was rotary split to       |
|                         |                         |produce a ~200-400g sample|
|                         |                         |for analytical work. The  |
|                         |                         |remaining drill sample    |
|                         |                         |material was combined and |
|                         |                         |split down to ~2-3kgs for |
|                         |                         |storage as a reference    |
|                         |                         |sample.                   |
|                         |                         |                          |
|                         |                         |The analytical split      |
|                         |                         |sample was wet screened   |
|                         |                         |using 45 µm and 1 mm      |
|                         |                         |sieves, to generate       |
|                         |                         |oversize and sand         |
|                         |                         |fractions, with slimes    |
|                         |                         |lost during screening and |
|                         |                         |calculated by difference. |
|                         |                         |                          |
|                         |                         |Improvements to the sample|
|                         |                         |preparation stage were    |
|                         |                         |made in 2017 to ensure    |
|                         |                         |industry best practice and|
|                         |                         |to deliver a high degree  |
|                         |                         |of confidence in the      |
|                         |                         |results. These included   |
|                         |                         |the following:            |
|                         |                         |                          |
|                         |                         |    --  A formalised      |
|                         |                         |        process flow was  |
|                         |                         |        generated, posted |
|                         |                         |        in all sample     |
|                         |                         |        preparation areas |
|                         |                         |        and used to train |
|                         |                         |        and monitor sample|
|                         |                         |        preparation staff.|
|                         |                         |    --  Regular monitoring|
|                         |                         |        was completed by  |
|                         |                         |        Base Titanium     |
|                         |                         |        senior staff.     |
|                         |                         |    --  Field samples were|
|                         |                         |        left in their bags|
|                         |                         |        for initial       |
|                         |                         |        air-drying to     |
|                         |                         |        avoid sample loss.|
|                         |                         |    --  Tetrasodium       |
|                         |                         |        pyrophosphate     |
|                         |                         |        (TSPP) was        |
|                         |If core, whether cut or  |        introduced to     |
|                         |sawn and whether quarter,|        decrease attrition|
|                         |half or all core taken.  |        time and improve  |
|                         |                         |        slimes recovery. A|
|                         |If non-core, whether     |        range of attrition|
|                         |riffled, tube sampled,   |        times (with 5%    |
|                         |rotary split, etc and    |        TSPP) were        |
|                         |whether sampled wet or   |        trialled and      |
|                         |dry.                     |        plotted against   |
|                         |                         |        slimes recovery   |
|                         |For all sample types, the|        figures to        |
|                         |nature, quality and      |        determine optimum |
|                         |appropriateness of the   |        attrition time (15|
|                         |sample preparation       |        minutes).         |
|                         |technique.               |    --  Staff were trained|
|                         |                         |        to use paint      |
|                         |Quality control          |        brushes and water |
|Sub-sampling techniques  |procedures adopted for   |        spray rather than |
|and sample preparation   |all sub-sampling stages  |        manipulate sample |
|                         |to maximise              |        through slimes    |
|                         |representivity of        |        screen by hand to |
|                         |samples.                 |        remove the        |
|                         |                         |        potential for     |
|                         |Measures taken to ensure |        screen damage.    |
|                         |that the sampling is     |    --  A calibration     |
|                         |representative of the    |        schedule was      |
|                         |in-situ material         |        introduced for    |
|                         |collected, including for |        scales used in the|
|                         |instance results for     |        sample preparation|
|                         |field                    |        stage.            |
|                         |duplicate/second-half    |    --  The introduction  |
|                         |sampling.                |        of LIMS software  |
|                         |                         |        allowed the       |
|                         |Whether sample sizes are |        capture of sample |
|                         |appropriate to the grain |        preparation data  |
|                         |size of the material     |        digitally at      |
|                         |being sampled.           |        inception and     |
|                         |                         |        synchronisation in|
|                         |                         |        real-time to the  |
|                         |                         |        master Kwale      |
|                         |                         |        Operations        |
|                         |                         |        Laboratory SQL    |
|                         |                         |        database.         |
|                         |                         |    --  Slimes screen     |
|                         |                         |        numbers are       |
|                         |                         |        recorded to       |
|                         |                         |        isolate batches   |
|                         |                         |        should re-assay be|
|                         |                         |        required due to   |
|                         |                         |        poor adherence to |
|                         |                         |        procedure or to   |
|                         |                         |        identify screen   |
|                         |                         |        damage.           |
|                         |                         |    --  Duplicate samples |
|                         |                         |        were collected at |
|                         |                         |        every 20th sample |
|                         |                         |        and assessed      |
|                         |                         |        regularly to      |
|                         |                         |        ensure            |
|                         |                         |        representivity was|
|                         |                         |        achieved.         |
|                         |                         |    --  The drill rods and|
|                         |                         |        cyclone were      |
|                         |                         |        routinely cleaned |
|                         |                         |        between holes     |
|                         |                         |        using pressurised |
|                         |                         |        water to avoid    |
|                         |                         |        inter-hole        |
|                         |                         |        contamination.    |
|                         |                         |The sample preparation    |
|                         |                         |flow sheet follows        |
|                         |                         |conventional mineral sands|
|                         |                         |processes but departed    |
|                         |                         |from standard mineral sand|
|                         |                         |practices in one respect; |
|                         |                         |the samples were generally|
|                         |                         |not oven-dried before     |
|                         |                         |de-sliming to prevent clay|
|                         |                         |minerals baking onto the  |
|                         |                         |HM grains (because the HM |
|                         |                         |fractions were to be used |
|                         |                         |in further analysis).     |
|                         |                         |Instead, a separate sample|
|                         |                         |was split and dried to    |
|                         |                         |determine moisture        |
|                         |                         |content, which was        |
|                         |                         |accounted for             |
|                         |                         |mathematically.           |
|                         |                         |                          |
|                         |                         |QA/QC procedures involved |
|                         |                         |the following:            |
|                         |                         |                          |
|                         |                         |• Prepared duplicate split|
|                         |                         |samples were processed at |
|                         |                         |every 20th sample.        |
|                         |                         |                          |
|                         |                         |• Prepared repeat samples |
|                         |                         |were processed at every   |
|                         |                         |7th sample.               |
|                         |                         |                          |
|                         |                         |• The manual hard-copy    |
|                         |                         |sample preparation records|
|                         |                         |were maintained in files  |
|                         |                         |in the event of           |
|                         |                         |cross-references due to   |
|                         |                         |identified scribing errors|
|                         |                         |in LIMS software.         |
|                         |                         |                          |
|                         |                         |The sample size is        |
|                         |                         |considered appropriate for|
|                         |                         |the grain size of the     |
|                         |                         |material because the grade|
|                         |                         |of HM is measured in per  |
|                         |                         |cent.                     |
|_________________________|_________________________|__________________________|
|                         |                         |The assay process employed|
|                         |                         |included a Sample         |
|                         |                         |Preparation stage,        |
|                         |                         |completed by Base Titanium|
|                         |                         |staff, followed by a heavy|
|                         |                         |liquid separation (using  |
|                         |                         |lithium polytungstate or  |
|                         |                         |sodium polytungstate) at  |
|                         |                         |SG = 2.85g/cm3), completed|
|                         |                         |at Kwale Operations’ site |
|                         |                         |laboratory.               |
|                         |                         |                          |
|                         |                         |The assaying and          |
|                         |                         |laboratory procedures used|
|                         |                         |are considered to follow  |
|                         |                         |industry best practice and|
|                         |                         |the technique is          |
|                         |                         |considered as a total     |
|                         |                         |analysis.                 |
|                         |                         |                          |
|                         |                         |The dried, deslimed       |
|                         |                         |processed samples were    |
|                         |                         |submitted to the Kwale    |
|                         |                         |Operations laboratory with|
|                         |                         |the following approach    |
|                         |                         |adopted.                  |
|                         |                         |                          |
|                         |                         |All samples were dried and|
|                         |                         |weighed.                  |
|                         |                         |                          |
|                         |                         |Sand fraction was         |
|                         |                         |processed by heavy liquid |
|                         |                         |separation to generate a  |
|                         |                         |HM fraction.              |
|                         |                         |                          |
|                         |                         |HM fraction subject to    |
|                         |The nature, quality and  |magnetic separation on a  |
|                         |appropriateness of the   |roll magnet to generate a |
|                         |assaying and laboratory  |magnetic (Mag) fraction,  |
|                         |procedures used and      |mids (Mid) and            |
|                         |whether the technique is |non-magnetic (NonMag)     |
|                         |considered partial or    |fraction.                 |
|                         |total.                   |                          |
|                         |                         |For 2023 drilling the HM  |
|                         |For geophysical tools,   |fraction from individual  |
|                         |spectrometers, handheld  |samples was submitted for |
|                         |XRF instruments, etc, the|magnetic separation,      |
|                         |parameters used in       |whereas for pre-2023      |
|                         |determining the analysis |drilling composite samples|
|Quality of assay data and|including instrument make|of HM from geological     |
|laboratory tests         |and model, reading times,|domains were submitted for|
|                         |calibrations factors     |magnetic separation.      |
|                         |applied and their        |                          |
|                         |derivation, etc.         |XRF analysis of magnetic  |
|                         |                         |fractions was completed   |
|                         |Nature of quality control|with the data used to     |
|                         |procedures adopted (e.g. |model the mineralogy using|
|                         |standards, blanks,       |the Company’s internally  |
|                         |duplicates, external     |developed algorithms      |
|                         |laboratory checks) and   |(MinModel).               |
|                         |whether acceptable levels|                          |
|                         |of accuracy (i.e. lack of|The proprietary MinModel  |
|                         |bias) and precision have |mineralogy technique,     |
|                         |been established.        |developed and employed by |
|                         |                         |Base Resources, comprises |
|                         |                         |an XRF analysis of the    |
|                         |                         |magnetic and non-magnetic |
|                         |                         |fractions of each         |
|                         |                         |composite or sample, the  |
|                         |                         |results from which are    |
|                         |                         |then back-calculated to   |
|                         |                         |determine in-ground       |
|                         |                         |mineralogy. MinModel has  |
|                         |                         |been validated by external|
|                         |                         |quantitative analysis     |
|                         |                         |(QEMSCAN and EDX) and is  |
|                         |                         |considered sufficiently   |
|                         |                         |certified to support      |
|                         |                         |quoted resource confidence|
|                         |                         |in this report.           |
|                         |                         |                          |
|                         |                         |Various quality control   |
|                         |                         |samples were submitted    |
|                         |                         |routinely to assure assay |
|                         |                         |quality. A total of 835   |
|                         |                         |duplicate field samples,  |
|                         |                         |835 lab duplicate sample  |
|                         |                         |preparation samples, 294  |
|                         |                         |field certified standard  |
|                         |                         |samples, and an           |
|                         |                         |unspecified number of     |
|                         |                         |internal laboratory       |
|                         |                         |standards, repeats and    |
|                         |                         |blanks have been assayed  |
|                         |                         |at Kwale Operations’ site |
|                         |                         |laboratory.               |
|                         |                         |                          |
|                         |                         |Acceptable levels of      |
|                         |                         |accuracy and precision    |
|                         |                         |have been established.    |
|_________________________|_________________________|__________________________|
|                         |                         |The Kwale North Dune      |
|                         |                         |deposit is a moderate to  |
|                         |                         |low HM grade, dunal-style |
|                         |                         |accumulation that does not|
|                         |                         |carry excessive           |
|                         |                         |mineralisation or suffer  |
|                         |                         |from ‘nugget’ effects,    |
|                         |                         |typical of other          |
|                         |                         |commodities.              |
|                         |                         |                          |
|                         |                         |No external audit         |
|                         |                         |validation was completed  |
|                         |                         |for the HM analyses       |
|                         |                         |included in the Kwale     |
|                         |                         |North Dune Mineral        |
|                         |                         |Resources estimate. This  |
|                         |                         |is not considered material|
|                         |                         |given the adequate        |
|                         |                         |performance of results    |
|                         |                         |from extensive QA/QC      |
|                         |                         |verification and on       |
|                         |                         |account of low HM grade   |
|                         |                         |variance and deposit      |
|                         |                         |homogeneity.              |
|                         |                         |                          |
|                         |The verification of      |A twin drill hole         |
|                         |significant intersections|procedure was introduced  |
|                         |by either independent or |for the 2018/19 program at|
|                         |alternative company      |a recommended rate of 5%  |
|                         |personnel.               |of the total number of    |
|                         |                         |holes. These twins were   |
|                         |The use of twinned holes.|used to quantify          |
|Verification of sampling |                         |short-range variability in|
|and assaying             |Documentation of primary |geological character and  |
|                         |data, data entry         |grade intersections, and  |
|                         |procedures, data         |were completed at         |
|                         |verification, data       |appropriate spacing across|
|                         |storage (physical and    |the deposit. A total of 41|
|                         |electronic) protocols.   |twin drill holes were     |
|                         |                         |completed during the      |
|                         |Discuss any adjustment to|2018/19 Kwale North Dune  |
|                         |assay data.              |drilling program, which   |
|                         |                         |represents about 5.7% of  |
|                         |                         |the total program. The    |
|                         |                         |twin hole paired data     |
|                         |                         |showed very good          |
|                         |                         |correlation, providing    |
|                         |                         |support to the            |
|                         |                         |integrity/quality of the  |
|                         |                         |resource data.            |
|                         |                         |                          |
|                         |                         |Drill hole logging and    |
|                         |                         |site sample data were     |
|                         |                         |collected electronically  |
|                         |                         |in Maxwell LogChief       |
|                         |                         |software, installed on    |
|                         |                         |field Panasonic Tough pads|
|                         |                         |that synchronise directly |
|                         |                         |to the Datashed database. |
|                         |                         |Assay data is captured    |
|                         |                         |electronically via LIMS   |
|                         |                         |software and merged with  |
|                         |                         |logging and sample data in|
|                         |                         |the Datashed database.    |
|                         |                         |                          |
|                         |                         |No adjustment to assay    |
|                         |                         |data was made.            |
|_________________________|_________________________|__________________________|
|                         |                         |Proposed drill holes were |
|                         |                         |sited on the ground using |
|                         |                         |hand-held Garmin GPS units|
|                         |                         |with an accuracy of ~ 3m. |
|                         |                         |After drilling, the mine  |
|                         |                         |surveyors picked collar   |
|                         |                         |positions via a           |
|                         |                         |differential global       |
|                         |                         |positioning system DGPS   |
|                         |                         |RTK unit registered to    |
|                         |                         |local base stations. The  |
|                         |                         |accuracy of the RTK unit  |
|                         |                         |is stated at 0.02m in the |
|                         |                         |X, Y and Z axes.          |
|                         |                         |                          |
|                         |                         |The survey Geodetic datum |
|                         |                         |utilised was UTM Arc 1960,|
|                         |                         |used in East Africa. Arc  |
|                         |Accuracy and quality of  |1960 references the Clark |
|                         |surveys used to locate   |1880 (RGS) ellipsoid and  |
|                         |drill holes (collar and  |the Greenwich prime       |
|                         |down-hole surveys),      |meridian. All survey data |
|                         |trenches, mine workings  |used in the Kwale North   |
|                         |and other locations used |Dune Mineral Resources    |
|Location of data points  |in Mineral Resource      |estimate dataset has      |
|                         |estimation.              |undergone a transformation|
|                         |                         |to the local mine grid    |
|                         |Specification of the grid|from the standard UTM Zone|
|                         |system used.             |37S (Arc 1960). The local |
|                         |                         |Grid was rotated 42.5°,   |
|                         |Quality and adequacy of  |which aligns the average  |
|                         |topographic control.     |strike of the deposit with|
|                         |                         |local North and is useful |
|                         |                         |for both grade            |
|                         |                         |interpolation and mining  |
|                         |                         |reference during          |
|                         |                         |production.               |
|                         |                         |                          |
|                         |                         |All drill collars were    |
|                         |                         |projected to the local    |
|                         |                         |LIDAR survey, DTM,        |
|                         |                         |captured over the resource|
|                         |                         |area in 2018/19 at a 2x2m |
|                         |                         |grid spacing. This was    |
|                         |                         |performed prior to        |
|                         |                         |interpretation and model  |
|                         |                         |construction to eliminate |
|                         |                         |any elevation disparities |
|                         |                         |for the block model       |
|                         |                         |construction.             |
|_________________________|_________________________|__________________________|
|                         |                         |The drill data spacing for|
|                         |                         |the 2018/19 Kwale North   |
|                         |                         |Dune drilling established |
|                         |                         |a nominal 100m X, 100m Y  |
|                         |                         |and 1.5m Z over the       |
|                         |                         |broader deposit.          |
|                         |                         |Variations from this      |
|                         |                         |spacing resulted from     |
|                         |                         |terrain/traverse          |
|                         |                         |difficulties and ground   |
|                         |                         |access.                   |
|                         |                         |                          |
|                         |                         |The 2023 Kwale North Dune |
|                         |                         |drilling targeted 50m X,  |
|                         |                         |100m Y and 1.5m Z drill   |
|                         |                         |data spacing over areas   |
|                         |                         |identified for potential  |
|                         |                         |mining and is considered  |
|                         |Data spacing for         |as grade control drilling.|
|                         |reporting of Exploration |                          |
|                         |Results.                 |A downhole sample interval|
|                         |                         |of 3m, with occasional    |
|                         |Whether the data spacing |1.5m intervals at         |
|                         |and distribution is      |geological contacts, was  |
|                         |sufficient to establish  |employed in the 2012/2013 |
|                         |the degree of geological |drilling campaign by Base |
|Data spacing and         |and grade continuity     |Titanium.                 |
|distribution             |appropriate for the      |                          |
|                         |Mineral Resource and Ore |A 1.5m, down-hole block   |
|                         |Reserve estimation       |size was applied to model |
|                         |procedure(s) and         |construction and for      |
|                         |classifications applied. |consistency in the        |
|                         |                         |interpolation processes.  |
|                         |Whether sample           |                          |
|                         |compositing has been     |This spacing and          |
|                         |applied.                 |distribution is considered|
|                         |                         |sufficient to establish   |
|                         |                         |the degree of geological  |
|                         |                         |and mineralisation        |
|                         |                         |continuity appropriate for|
|                         |                         |the resource estimation   |
|                         |                         |procedures and            |
|                         |                         |classifications applied.  |
|                         |                         |                          |
|                         |                         |No sample compositing has |
|                         |                         |been applied for HM,      |
|                         |                         |slimes and oversize in the|
|                         |                         |interpolation processes.  |
|                         |                         |Pre-2023 drilling used    |
|                         |                         |compositing for           |
|                         |                         |mineralogical samples,    |
|                         |                         |with composites           |
|                         |                         |constrained to geological |
|                         |                         |domains and typically     |
|                         |                         |limited to 6m downhole.   |
|_________________________|_________________________|__________________________|
|                         |                         |With the geological       |
|                         |                         |setting being a layered   |
|                         |                         |dunal/fluviatile sequence,|
|                         |                         |the orientation of the    |
|                         |                         |deposit mineralisation in |
|                         |                         |general is sub-horizontal.|
|                         |                         |All drill holes were      |
|                         |                         |orientated vertically to  |
|                         |Whether the orientation  |penetrate the             |
|                         |of sampling achieves     |sub-horizontal            |
|                         |unbiased sampling of     |mineralisation            |
|                         |possible structures and  |orthogonally.             |
|                         |the extent to which this |                          |
|                         |is known, considering the|Hole centres were spaced  |
|                         |deposit type.            |nominally at 100m. This   |
|                         |                         |cross-profiles the dune so|
|Orientation of data in   |If the relationship      |that variation can be     |
|relation to geological   |between the drilling     |determined. Down hole     |
|structure                |orientation and the      |intervals were nominated  |
|                         |orientation of key       |as 1.5m. This provides    |
|                         |mineralised structures is|adequate sampling         |
|                         |considered to have       |resolution to capture the |
|                         |introduced a sampling    |distribution and          |
|                         |bias, this should be     |variability of geology    |
|                         |assessed and reported if |units and mineralisation  |
|                         |material.                |encountered vertically    |
|                         |                         |down hole.                |
|                         |                         |                          |
|                         |                         |The orientation of the    |
|                         |                         |drilling is considered    |
|                         |                         |appropriate for testing   |
|                         |                         |the horizontal and        |
|                         |                         |vertical extent of        |
|                         |                         |mineralisation without    |
|                         |                         |bias.                     |
|_________________________|_________________________|__________________________|
|                         |                         |Drill samples were        |
|                         |                         |transported daily from    |
|                         |                         |site to the secure sample |
|                         |                         |preparation facility by   |
|                         |                         |company personnel.        |
|                         |                         |                          |
|                         |                         |Sample residues from the  |
|                         |                         |preparation stage were    |
|                         |                         |transferred to pallets and|
|                         |                         |stored in a locked shed   |
|                         |                         |beside the warehouse at   |
|                         |                         |Kwale Operations.         |
|                         |                         |                          |
|                         |                         |Residues from the Kwale   |
|                         |                         |Operations site laboratory|
|                         |                         |were placed in labelled   |
|                         |                         |bags and stored in        |
|                         |The measures taken to    |numbered boxes. Boxes were|
|Sample security          |ensure sample security.  |placed into a locked      |
|                         |                         |container beside the      |
|                         |                         |laboratory.               |
|                         |                         |                          |
|                         |                         |Sample tables are housed  |
|                         |                         |on a secure,              |
|                         |                         |network-hosted SQL        |
|                         |                         |database. Administration  |
|                         |                         |privileges are limited to |
|                         |                         |two Base Titanium staff:  |
|                         |                         |Exploration Superintendent|
|                         |                         |and the Business          |
|                         |                         |Applications              |
|                         |                         |Administrator.            |
|                         |                         |                          |
|                         |                         |Data is backed up every 12|
|                         |                         |hours and stored in       |
|                         |                         |perpetuity on a secure,   |
|                         |                         |site backup server.       |
|_________________________|_________________________|__________________________|
|                         |                         |Historical audits and     |
|                         |                         |reviews of sampling       |
|                         |                         |techniques have been      |
|                         |                         |completed at Kwale        |
|                         |The results of any audits|Operations by industry    |
|Audits or reviews        |or reviews of sampling   |consultants, and internal |
|                         |techniques and data.     |reviews by Base Resources’|
|                         |                         |Exploration and Resource  |
|                         |                         |Manager were completed    |
|                         |                         |during the drilling       |
|                         |                         |campaigns.                |
|_________________________|_________________________|__________________________|
Criteria                  Explanation                Comment

                                                     The Kwale North Dune
                                                     deposit extends across SML
                                                     23 and prospecting licence
                                                     PL 2018/0119 which are both
                          Type, reference            100% held by Base Titanium,
                          name/number, location and  a wholly owned subsidiary
                          ownership including        of Base Resources. The
                          agreements or material     resource being reported
                          issues with third parties  lies wholly within SML 23.
                          such as joint ventures,
                          partnerships, overriding   SML 23 was extended in June
                          royalties, native title    2022 to cover the Kwale
Mineral tenement and land interests, historical      North Dune and Bumamani Ore
tenure status             sites, wilderness or       Reserves and expires in
                          national park and          June 2025. SML 23 is in
                          environmental settings.    good standing with the
                                                     State Department for Mining
                          The security of the tenure and expires on 30 June
                          held at the time of        2025.
                          reporting along with any
                          known impediments to       Local landowners are
                          obtaining a licence to     generally supportive of
                          operate in the area.       exploration and mining
                                                     activities with established
                                                     community relations and
                                                     development programs in
                                                     place.

                                                     In 1996, Tiomin carried out
                                                     reconnaissance surface and
                                                     hand-auger sampling.
                                                     Following the encouraging
                                                     results obtained,
                                                     mud-rotary drilling was
                                                     undertaken in 1997 and 37
                                                     holes for a total of 1,824m
                                                     was achieved for the Kwale
                                                     North Dune, at 3m sampling
                                                     intervals.

                                                     Prior to the acquisition of
                                                     the Kwale Project by Base
                                                     Resources, Tiomin prepared
                                                     and published a North Dune
                                                     Mineral Resources estimate
                                                     of 116 Mt @ 2.1% HM using a
                                                     0.5% HM cut-off grade.
                          Acknowledgment and
Exploration done by other appraisal of exploration   The current resource model
parties                   by other parties.          omits the Tiomin data. This
                                                     followed a twin drilling
                                                     analysis of the Tiomin Mud
                                                     Rotary holes with Base
                                                     Titanium RCAC to determine
                                                     relevance of historical
                                                     data to the Kwale South
                                                     Dune Mineral Resources
                                                     estimate in 2016. A total
                                                     of 18 twin-hole pairs from
                                                     a geographically dispersed
                                                     area within the Kwale South
                                                     Dune were included for
                                                     analysis. A very poor
                                                     correlation in HM values
                                                     between the two methods (R2
                                                     = 0.1522) resulted from the
                                                     study, and it is assumed
                                                     that the poor correlation
                                                     would also extend to the
                                                     Kwale North Dune.

                                                     The Kwale North Dune is
                                                     part of the extensive Kwale
                                                     Dune systems comprising of
                                                     reddish, windblown
                                                     Margarini sand formations
                                                     that overlie a sequence of
                                                     variably mineralised
                                                     clay-rich fluviatile units,
                                                     which in turn overlie a
                                                     Mesozoic sandstone base,
                                                     known as the Mazeras
                                                     formation. All formations
                                                     are locally enriched in HM,
                                                     with the VHM suite
                          Deposit type, geological   dominated by ilmenite with
Geology                   setting, and style of      lesser rutile and zircon.
                          mineralisation.
                                                     These three units are
                                                     separated by lateritic
                                                     paleo-surfaces which
                                                     signify a time-gap between
                                                     the geological formations.

                                                     The Mazeras Sandstone,
                                                     derived from the
                                                     disintegration of the
                                                     Mozambique Belt metamorphic
                                                     rocks, has likely provided
                                                     the supply of heavy
                                                     minerals to the Margarini
                                                     sand dunes and the
                                                     fluviatile formations.

                                                     Drilling by year used for
                                                     the resource model build
                                                     was as follows:

                                                     2010

                                                         --  11 drill holes
                                                             (depth: max 72m,
                                                             min 24m, average
                                                             53m).
                                                         --  Total 582m drilled.
                                                     2012

                          A summary of all               --  24 drill holes
                          information material to            (depth: max 75m,
                          the understanding of the           min 27m, average
                          exploration results                60m).
                          including a tabulation of      --  Total 1,449m
                          the following information          drilled.
                          for all Material drill     2013
                          holes:
                                                         --  38 drill holes
                          easting and northing of            (depth: max 75m,
                          the drill hole collar              min 27m, average
                                                             50m).
                          elevation or RL (Reduced       --  Total 1,911m
                          Level – elevation above            drilled.
                          sea level in metres) of    2018
                          the drill hole collar
                                                         --  473 drill holes
                          dip and azimuth of the             (depth: max 117m,
Drill hole Information    hole                               min 9m, average 38
                                                             m).
                          down hole length and           --  Total 18,045m
                          interception depth                 drilled.
                                                     2019
                          hole length.
                                                         --  7 drill holes
                          If the exclusion of this           (depth: max 21m,
                          information is justified           min 9m, average
                          on the basis that the              16m).
                          information is not             --  Total 114m drilled.
                          Material and this          2023
                          exclusion does not detract
                          from the understanding of      --  37 drill holes
                          the report, the Competent          (depth: max 30m,
                          Person should clearly              min 9m, average
                          explain why this is the            21m).
                          case.                          --  Total 759m drilled.
                                                     See drill hole location
                                                     plan in Figure 3 attached.

                                                     All drill holes were
                                                     drilled vertically.

                                                     All collars were projected
                                                     to the LIDAR topographical
                                                     surface.

                                                     A tabulation of material
                                                     drill holes is not included
                                                     as exploration results are
                                                     not being reported.

                          In reporting Exploration
                          Results, weighting
                          averaging techniques,
                          maximum and/or minimum
                          grade truncations (e.g.
                          cutting of high grades)
                          and cut-off grades are
                          usually Material and
                          should be stated.          Exploration results are not
                                                     being reported.
                          Where aggregate intercepts
                          incorporate short lengths  No metal equivalent values
Data aggregation methods  of high-grade results and  were used.
                          longer lengths of low
                          grade results, the         No aggregation of short
                          procedure used for such    length samples used as
                          aggregation should be      samples were consistently
                          stated and some typical    3m and 1.5m intervals.
                          examples of such
                          aggregations should be
                          shown in detail.

                          The assumptions used for
                          any reporting of metal
                          equivalent values should
                          be clearly stated.

                          These relationships are
                          particularly important in
                          the reporting of
                          Exploration Results.

                          If the geometry of the
                          mineralisation with        The deposit sequences are
Relationship between      respect to the drill hole  sub-horizontal, and the
mineralisation widths and angle is known, its nature vertically inclined holes
intercept lengths         should be reported.        are a fair representation
                                                     of true thickness.
                          If it is not known and
                          only the down hole lengths
                          are reported, there should
                          be a clear statement to
                          this effect (e.g. ‘down
                          hole length, true width
                          not known’).

                          Appropriate maps and
                          sections (with scales) and
                          tabulations of intercepts
                          should be included for any
                          significant discovery      See attached Figures 2 and
Diagrams                  being reported These       3.
                          should include, but not be
                          limited to a plan view of
                          drill hole collar
                          locations and appropriate
                          sectional views.

                          Where comprehensive
                          reporting of all
                          Exploration Results is not
                          practicable,
Balanced reporting        representative reporting   Exploration results are not
                          of both low and high       being reported.
                          grades and/or widths
                          should be practiced to
                          avoid misleading reporting
                          of Exploration Results.

                          Other exploration data, if
                          meaningful and material,
                          should be reported         The Kwale North Dune
                          including (but not limited deposit contains higher
                          to): geological            levels of slimes than the
                          observations; geophysical  deposits previously mined
                          survey results;            at Kwale Operations, and
Other substantive         geochemical survey         also a thicker sequence of
exploration data          results; bulk samples –    Ore Zone 4. These
                          size and method of         characteristics can be
                          treatment; metallurgical   mitigated by mining North
                          test results; bulk         Dune concurrently with
                          density, groundwater,      other deposits to provide a
                          geotechnical and rock      blended feed to the
                          characteristics; potential processing plants.
                          deleterious or
                          contaminating substances.

                          The nature and scale of
                          planned further work (e.g. No further work is
                          tests for lateral          recommended or planned as
                          extensions or depth        the deposit is currently
                          extensions or large-scale  being mined and, with the
                          step-out drilling).        planned cessation of mining
                                                     activities at Kwale
Further work              Diagrams clearly           Operations in December 2024
                          highlighting the areas of  following the depletion of
                          possible extensions,       existing Ore Reserves,
                          including the main         there are no potential mine
                          geological interpretations extensions that have not
                          and future drilling areas, already been identified and
                          provided this information  assessed.
                          is not commercially
                          sensitive.
______________________________________________________________________________
|Criteria                 |Explanation              |Comment                   |
|_________________________|_________________________|__________________________|
|                         |                         |Field data was captured in|
|                         |                         |LogChief logging          |
|                         |                         |application and           |
|                         |                         |automatically validated   |
|                         |                         |through reference to      |
|                         |                         |pre-set library table     |
|                         |                         |configurations. Typing or |
|                         |                         |logging code errors,      |
|                         |                         |duplication of key        |
|                         |                         |identifiers (e.g.,        |
|                         |                         |HOLE_ID, SAMP_ID) and     |
|                         |                         |conflicts in related      |
|                         |                         |tables (e.g., down-hole   |
|                         |                         |depth) are quarantined by |
|                         |                         |the software and require  |
|                         |                         |resolution immediately    |
|                         |                         |before logging can        |
|                         |                         |proceed.                  |
|                         |                         |                          |
|                         |                         |The SQL Database also has |
|                         |                         |identical automated       |
|                         |                         |validation features. Data |
|                         |                         |import is unsuccessful    |
|                         |                         |until these data issues   |
|                         |                         |are resolved.             |
|                         |                         |                          |
|                         |                         |Field logging and survey  |
|                         |                         |data from the SQL database|
|                         |                         |were imported into        |
|                         |                         |Datamine Studio RM for    |
|                         |                         |sectional interpretation. |
|                         |                         |                          |
|                         |                         |Validation steps included |
|                         |                         |a visual interrogation of |
|                         |                         |collar versus geology     |
|                         |                         |depths, a review of hole  |
|                         |                         |locations against the     |
|                         |                         |drilling plan and a check |
|                         |                         |for missing or duplicated |
|                         |                         |logged fields and         |
|                         |                         |outliers. Any spurious or |
|                         |                         |questionable entries were |
|                         |                         |resolved by the           |
|                         |                         |supervising Geologist.    |
|                         |                         |                          |
|                         |                         |A field diary was utilised|
|                         |                         |by the site Geologist to  |
|                         |                         |record the hole name,     |
|                         |                         |date, depth, number of    |
|                         |Measures taken to ensure |samples, time of start and|
|                         |that data has not been   |finish, a description of  |
|                         |corrupted by, for        |the location of the hole  |
|                         |example, transcription or|in relation to the        |
|                         |keying errors, between   |previous hole and other   |
|Database integrity       |its initial collection   |relative observations.    |
|                         |and its use for Mineral  |Such a diary provides     |
|                         |Resource estimation      |valuable evidence if there|
|                         |purposes.                |is an error in hole naming|
|                         |                         |or surveying.             |
|                         |Data validation          |                          |
|                         |procedures used.         |A geologist was employed  |
|                         |                         |to manage digital data    |
|                         |                         |capture at the sample     |
|                         |                         |preparation laboratory to |
|                         |                         |reduce the potential for  |
|                         |                         |data entry error by       |
|                         |                         |unskilled labourers. A    |
|                         |                         |number of validation      |
|                         |                         |checks were made of sample|
|                         |                         |preparation data to ensure|
|                         |                         |accurate data entry and   |
|                         |                         |application of correct    |
|                         |                         |procedure by Base Titanium|
|                         |                         |staff. This included:     |
|                         |                         |                          |
|                         |                         |    --  comparison of     |
|                         |                         |        pre-versus        |
|                         |                         |        post-oven weights;|
|                         |                         |    --  comparison of     |
|                         |                         |        split weight      |
|                         |                         |        versus de-slimed  |
|                         |                         |        weight;           |
|                         |                         |    --  comparison of     |
|                         |                         |        split weight      |
|                         |                         |        versus field      |
|                         |                         |        sample weight; and|
|                         |                         |    --  all sample        |
|                         |                         |        preparation data  |
|                         |                         |        were sorted by    |
|                         |                         |        each individual   |
|                         |                         |        field and outliers|
|                         |                         |        investigated      |
|                         |                         |Assay results were        |
|                         |                         |delivered via email in 45 |
|                         |                         |sample batches from Kwale |
|                         |                         |Operations’ site          |
|                         |                         |laboratory. These were in |
|                         |                         |the form of CSV text files|
|                         |                         |and imported by batch     |
|                         |                         |number directly into the  |
|                         |                         |SQL database tables where |
|                         |                         |pre-set algorithms        |
|                         |                         |converted weights to      |
|                         |                         |percentages and removed   |
|                         |                         |the moisture content. The |
|                         |                         |calculated assay results  |
|                         |                         |were then checked manually|
|                         |                         |for missing records and   |
|                         |                         |out of range or           |
|                         |                         |unrealistic values.       |
|_________________________|_________________________|__________________________|
|                         |                         |The Competent Person, Base|
|                         |                         |Resources’ Exploration and|
|                         |                         |Resources Manager, Mr. Ian|
|                         |Comment on any site      |Reudavey, was based at    |
|                         |visits undertaken by the |Kwale Operations during   |
|                         |Competent Person and the |2023 and 2024. The        |
|Site visits              |outcome of those visits. |Competent Person is       |
|                         |                         |satisfied with the        |
|                         |If no site visits have   |integrity of the database |
|                         |been undertaken indicate |as well as the delineation|
|                         |why this is the case.    |of the geological         |
|                         |                         |boundaries having observed|
|                         |                         |mining at Kwale North     |
|                         |                         |Dune.                     |
|_________________________|_________________________|__________________________|
|                         |                         |The original geological   |
|                         |                         |interpretation was        |
|                         |                         |undertaken by the Base    |
|                         |                         |Titanium Exploration      |
|                         |                         |Superintendent using field|
|                         |                         |logs and observations,    |
|                         |                         |assays, HM sink logs, XRF |
|                         |                         |oxide chemistry and       |
|                         |                         |mineralogy data. The      |
|                         |                         |oversize grades were      |
|                         |                         |particularly useful in    |
|                         |                         |determining the lateritic |
|                         |                         |paleo-surfaces between the|
|                         |                         |geological zones.         |
|                         |                         |Interpretations were      |
|                         |                         |revised and updated by the|
|                         |                         |Competent Person.         |
|                         |                         |                          |
|                         |                         |The data spacing for the  |
|                         |                         |project is considered     |
|                         |                         |sufficient for grade and  |
|                         |                         |mineralogical continuity. |
|                         |                         |                          |
|                         |                         |Three mineralised         |
|                         |                         |geological zones and a    |
|                         |                         |basement zone were        |
|                         |                         |identified and are used as|
|                         |                         |constraints in the Mineral|
|                         |                         |Resources estimation.     |
|                         |                         |                          |
|                         |                         |The uppermost zone at the |
|                         |                         |Kwale North Dune deposit, |
|                         |                         |referred to as Ore Zone 1,|
|                         |                         |is a dark brown,          |
|                         |                         |predominantly fine        |
|                         |                         |grained, well sorted silty|
|                         |                         |sand with very little     |
|                         |                         |induration. It is also    |
|                         |Confidence in (or        |characterised by a clean, |
|                         |conversely, the          |high value heavy mineral  |
|                         |uncertainty of) the      |assemblage.               |
|                         |geological interpretation|                          |
|                         |of the mineral deposit.  |Ore Zone 4 lies below Ore |
|                         |                         |Zone 1 with a clear       |
|                         |Nature of the data used  |lateritic boundary        |
|                         |and of any assumptions   |observed in the field with|
|                         |made.                    |slightly difficult bit    |
|                         |                         |penetration, and in HM    |
|                         |The effect, if any, of   |sink logs, exhibiting     |
|                         |alternative              |elevated iron oxides. Ore |
|Geological interpretation|interpretations on       |Zone 4 is lower in        |
|                         |Mineral Resource         |valuable heavy mineral    |
|                         |estimation.              |content, often dominated  |
|                         |                         |by iron oxides and Al2SiO5|
|                         |The use of geology in    |polymorphs (kyanite,      |
|                         |guiding and controlling  |andalusite and            |
|                         |Mineral Resource         |sillimanite). It is       |
|                         |estimation.              |considered a fluvial      |
|                         |                         |deposit based on the      |
|                         |The factors affecting    |difficulty of wash and the|
|                         |continuity both of grade |poor grain sorting.       |
|                         |and geology.             |                          |
|                         |                         |Ore Zone 5 lies below Ore |
|                         |                         |Zone 4 and is separated   |
|                         |                         |from that zone by a       |
|                         |                         |lateritic paleo-surface.  |
|                         |                         |It is unique              |
|                         |                         |mineralogically due to an |
|                         |                         |increased amount of       |
|                         |                         |almandine garnet that     |
|                         |                         |reports to the mag        |
|                         |                         |fraction, significantly   |
|                         |                         |increasing the magnesium, |
|                         |                         |manganese, aluminium and  |
|                         |                         |silicon in the oxide      |
|                         |                         |chemistry, and this is    |
|                         |                         |also reflected in QEMSCAN |
|                         |                         |mineralogy.               |
|                         |                         |                          |
|                         |                         |For Ore Zones 1, 4 and 5, |
|                         |                         |a strong correlation      |
|                         |                         |between the field logs, HM|
|                         |                         |sink logs and XRF oxide   |
|                         |                         |chemistry and QEMSCAN     |
|                         |                         |mineralogy gives          |
|                         |                         |confidence to these       |
|                         |                         |interpretations.          |
|                         |                         |                          |
|                         |                         |The grade and mineralogy  |
|                         |                         |continuity is abruptly    |
|                         |                         |truncated at the western  |
|                         |                         |edge by an interpreted    |
|                         |                         |normal fault that pushed  |
|                         |                         |basement material to the  |
|                         |                         |surface. Grade and        |
|                         |                         |geological continuity for |
|                         |                         |Ore Zone 1 and 4 can be   |
|                         |                         |impacted by erosion and   |
|                         |                         |the formation of a        |
|                         |                         |dendritic drainage pattern|
|                         |                         |shedding to the east.     |
|_________________________|_________________________|__________________________|
|                         |                         |The Kwale North Dune      |
|                         |The extent and           |Mineral Resources estimate|
|                         |variability of the       |is approximately 1,800m   |
|                         |Mineral Resource         |along strike and about    |
|                         |expressed as length      |700m across strike on     |
|Dimensions               |(along strike or         |average.                  |
|                         |otherwise), plan width,  |                          |
|                         |and depth below surface  |The typical thickness of  |
|                         |to the upper and lower   |Ore Zone 1, Ore Zone 4 and|
|                         |limits of the Mineral    |Ore Zone 5 is             |
|                         |Resource.                |approximately 8m, 10m and |
|                         |                         |8m, respectively.         |
|_________________________|_________________________|__________________________|
|                         |                         |The Kwale North Dune      |
|                         |                         |Mineral Resources         |
|                         |                         |estimation was undertaken |
|                         |                         |using Datamine Studio RM  |
|                         |                         |software. The estimation  |
|                         |                         |techniques used were based|
|                         |                         |upon revision and         |
|                         |                         |modification (as required)|
|                         |                         |of parameters developed   |
|                         |                         |during previous modelling |
|                         |                         |of the Kwale North Dune   |
|                         |                         |deposit.                  |
|                         |                         |                          |
|                         |                         |Interpolation was         |
|                         |                         |constrained within the    |
|                         |                         |geological domains and    |
|                         |                         |utilised search ellipse   |
|                         |                         |dimensions developed from |
|                         |                         |variography, with a       |
|                         |                         |dynamic ellipse           |
|                         |                         |orientation controlled by |
|                         |                         |strike and dip trend      |
|                         |The nature and           |points of the geological  |
|                         |appropriateness of the   |domain.                   |
|                         |estimation technique(s)  |                          |
|                         |applied and key          |Inverse Distance Weighting|
|                         |assumptions, including   |to the power of three was |
|                         |treatment of extreme     |used to interpolate assay |
|                         |grade values, domaining, |grades (HM, Slimes,       |
|                         |interpolation parameters |Oversize, Ilmenite, Rutile|
|                         |and maximum distance of  |and Zircon) from the drill|
|                         |extrapolation from data  |hole file. Nearest        |
|                         |points. If a computer    |Neighbour was used to     |
|                         |assisted estimation      |interpolate the logged    |
|                         |method was chosen include|hardness, mineralogy      |
|                         |a description of computer|composite ID and          |
|                         |software and parameters  |mineralogy chemistry data.|
|                         |used.                    |                          |
|                         |                         |This resource estimate has|
|                         |The availability of check|been constrained to a     |
|                         |estimates, previous      |designated mining area    |
|                         |estimates and/or mine    |within SML 23, as the area|
|                         |production records and   |outside of the current    |
|                         |whether the Mineral      |operational envelope is no|
|                         |Resource estimate takes  |longer considered to have |
|                         |appropriate account of   |prospects for eventual    |
|                         |such data.               |economic extraction, given|
|                         |                         |the absence of mining     |
|                         |The assumptions made     |tenure, the planned       |
|                         |regarding recovery of    |closure of Kwale          |
|                         |by-products.             |Operations, the low HM    |
|                         |                         |grade, high slimes        |
|                         |Estimation of deleterious|content, lack of capacity |
|                         |elements or other        |for slimes tailings       |
|                         |non-grade variables of   |storage and high cost and |
|Estimation and modelling |economic significance    |timeframes of land        |
|techniques               |(e.g., sulphur for acid  |acquisition.              |
|                         |mine drainage            |                          |
|                         |characterisation).       |Mining commenced at Kwale |
|                         |                         |North Dune in February    |
|                         |In the case of block     |2023, and while           |
|                         |model interpolation, the |successfully producing HM,|
|                         |block size in relation to|there have been challenges|
|                         |the average sample       |with hydraulic mining of  |
|                         |spacing and the search   |high clay material in Ore |
|                         |employed.                |Zone 4 and Ore Zone 5.    |
|                         |                         |Given that Ore Zone 5 also|
|                         |Any assumptions behind   |has a low VHM content and |
|                         |modelling of selective   |poor HM quality, it has   |
|                         |mining units.            |now been excluded from the|
|                         |                         |mineral resource as it has|
|                         |Any assumptions about    |proven uneconomical to    |
|                         |correlation between      |extract.                  |
|                         |variables.               |                          |
|                         |                         |No assumptions have been  |
|                         |Description of how the   |made as to the recovery of|
|                         |geological interpretation|by-products.              |
|                         |was used to control the  |                          |
|                         |resource estimates.      |The parent cell size used |
|                         |                         |in the grade interpolation|
|                         |Discussion of basis for  |(50m x 50m) was half the  |
|                         |using or not using grade |average drill hole spacing|
|                         |cutting or capping.      |on the X and Y axes, which|
|                         |                         |was 100m x 100m. The      |
|                         |The process of           |vertical thickness of the |
|                         |validation, the checking |cell was the nominal      |
|                         |process used, the        |average drill sample      |
|                         |comparison of model data |interval i.e., 1.5m.      |
|                         |to drill hole data, and  |                          |
|                         |use of reconciliation    |No assumptions were made  |
|                         |data if available.       |behind modelling of       |
|                         |                         |selected mining units.    |
|                         |                         |                          |
|                         |                         |No assumptions were made  |
|                         |                         |about correlation between |
|                         |                         |variables.                |
|                         |                         |                          |
|                         |                         |No grade cutting or       |
|                         |                         |capping has been applied  |
|                         |                         |as the HM grade is        |
|                         |                         |typically quite low at    |
|                         |                         |Kwale North Dune and the  |
|                         |                         |higher-grade assays       |
|                         |                         |present have been shown to|
|                         |                         |have continuity along a   |
|                         |                         |geological feature from   |
|                         |                         |infill drilling data.     |
|                         |                         |                          |
|                         |                         |Validation was undertaken |
|                         |                         |by swathe plots,          |
|                         |                         |population distribution   |
|                         |                         |analysis and visual       |
|                         |                         |inspection.               |
|_________________________|_________________________|__________________________|
|                         |Whether the tonnages are |                          |
|                         |estimated on a dry basis |The Mineral Resources     |
|Moisture                 |or with natural moisture,|estimate is on a dry      |
|                         |and the method of        |tonnes basis.             |
|                         |determination of the     |                          |
|                         |moisture content         |                          |
|_________________________|_________________________|__________________________|
|                         |                         |The economic cut-off of   |
|                         |                         |Kwale Operations is       |
|                         |                         |between 1% and 1.5% HM    |
|                         |The basis of the adopted |dependent upon mineral    |
|Cut-off parameters       |cut-off grade(s) or      |assemblage and product    |
|                         |quality parameters       |prices, and historically  |
|                         |applied.                 |Kwale Operations Mineral  |
|                         |                         |Resources estimate        |
|                         |                         |reporting has used a 1% HM|
|                         |                         |cut-off grade.            |
|_________________________|_________________________|__________________________|
|                         |                         |The hydraulic mining      |
|                         |Assumptions made         |method currently used at  |
|                         |regarding possible mining|Kwale Operations is also  |
|                         |methods, minimum mining  |being used at Kwale North |
|                         |dimensions and internal  |Dune. The high slime      |
|                         |(or, if applicable,      |content and generally low |
|                         |external) mining         |levels of induration in   |
|                         |dilution. It is always   |the Kwale North Dune      |
|                         |necessary as part of the |deposit provide support   |
|                         |process of determining   |for this mining method,   |
|                         |reasonable prospects for |but the presence of       |
|                         |eventual economic        |compacted clay has        |
|Mining factors or        |extraction to consider   |necessitated the use of   |
|assumptions              |potential mining methods,|higher-pressure water guns|
|                         |but the assumptions made |and some mechanical mining|
|                         |regarding mining methods |assistance.               |
|                         |and parameters when      |                          |
|                         |estimating Mineral       |Based on the operational  |
|                         |Resources may not always |experience to date the    |
|                         |be rigorous. Where this  |Competent Person considers|
|                         |is the case, this should |there are no mining       |
|                         |be reported with an      |factors which are likely  |
|                         |explanation of the basis |to affect the assumption  |
|                         |of the mining assumptions|that the deposit has      |
|                         |made.                    |reasonable prospects for  |
|                         |                         |eventual economic         |
|                         |                         |extraction.               |
|_________________________|_________________________|__________________________|
|                         |The basis for assumptions|The existing concentrator,|
|                         |or predictions regarding |modified to accommodate   |
|                         |metallurgical            |the increased slimes, and |
|                         |amenability. It is always|mineral separation plant  |
|                         |necessary as part of the |at Kwale Operations have  |
|                         |process of determining   |proven capable of         |
|                         |reasonable prospects for |processing the Kwale North|
|                         |eventual economic        |Dune material with        |
|                         |extraction to consider   |recoveries achieving      |
|                         |potential metallurgical  |ranges aligned with       |
|Metallurgical factors or |methods, but the         |historical production.    |
|assumptions              |assumptions regarding    |                          |
|                         |metallurgical treatment  |Based on the operational  |
|                         |processes and parameters |experience to date the    |
|                         |made when reporting      |Competent Person considers|
|                         |Mineral Resources may not|there are no metallurgical|
|                         |always be rigorous. Where|factors which are likely  |
|                         |this is the case, this   |to affect the assumption  |
|                         |should be reported with  |that the deposit has      |
|                         |an explanation of the    |reasonable prospects for  |
|                         |basis of the             |eventual economic         |
|                         |metallurgical assumptions|extraction.               |
|                         |made.                    |                          |
|_________________________|_________________________|__________________________|
|                         |Assumptions made         |                          |
|                         |regarding possible waste |Environmental factors for |
|                         |and process residue      |Kwale North Dune are well |
|                         |disposal options. It is  |established and managed as|
|                         |always necessary as part |they form a continuation  |
|                         |of the process of        |of the current operational|
|                         |determining reasonable   |plan. The Competent Person|
|                         |prospects for eventual   |considers there are no    |
|                         |economic extraction to   |environmental factors     |
|                         |consider the potential   |which are likely to affect|
|                         |environmental impacts of |the assumption that the   |
|                         |the mining and processing|deposit has reasonable    |
|                         |operation. While at this |prospects for eventual    |
|                         |stage the determination  |economic extraction.      |
|Environmental factors or |of potential             |                          |
|assumptions              |environmental impacts,   |Course tailings are       |
|                         |particularly for a       |deposited in the mined out|
|                         |greenfields project, may |pit voids of both the     |
|                         |not always be well       |Kwale Central Dune and    |
|                         |advanced, the status of  |Kwale North Dune before   |
|                         |early consideration of   |being capped with a layer |
|                         |these potential          |of co-disposed of fine and|
|                         |environmental impacts    |coarse tails as the first |
|                         |should be reported. Where|step in rehabilitation of |
|                         |these aspects have not   |these areas. The excess   |
|                         |been considered this     |fine tails not used for   |
|                         |should be reported with  |co-disposal are deposited |
|                         |an explanation of the    |in the site tailings      |
|                         |environmental assumptions|storage facility.         |
|                         |made.                    |                          |
|_________________________|_________________________|__________________________|
|                         |Whether assumed or       |                          |
|                         |determined. If assumed,  |                          |
|                         |the basis for the        |                          |
|                         |assumptions. If          |A fixed dry bulk density  |
|                         |determined, the method   |of 1.7 (t/m3) was assumed |
|                         |used, whether wet or dry,|for the Kwale North Dune  |
|                         |the frequency of the     |Mineral Resources         |
|                         |measurements, the nature,|estimate, based on        |
|                         |size and                 |operational experience of |
|                         |representativeness of the|mining the Kwale Central  |
|                         |samples.                 |Dune, Kwale South Dune and|
|                         |                         |Kwale North Dune deposits |
|                         |The bulk density for bulk|and the difficulty in     |
|Bulk density             |material must have been  |developing a bulk density |
|                         |measured by methods that |formula to account for all|
|                         |adequately account for   |material types.           |
|                         |void spaces (vugs,       |                          |
|                         |porosity, etc), moisture |Ongoing production        |
|                         |and differences between  |reconciliation has shown  |
|                         |rock and alteration zones|this to be a reasonable   |
|                         |within the deposit.      |assumption and more       |
|                         |                         |reliable than bulk density|
|                         |Discuss assumptions for  |algorithms.               |
|                         |bulk density estimates   |                          |
|                         |used in the evaluation   |                          |
|                         |process of the different |                          |
|                         |materials.               |                          |
|_________________________|_________________________|__________________________|
|                         |                         |The Mineral Resources     |
|                         |                         |classification for the    |
|                         |                         |Kwale North Dune deposit  |
|                         |                         |was based on drill hole   |
|                         |                         |spacing, sample interval  |
|                         |The basis for the        |and the distribution and  |
|                         |classification of the    |influence of composite    |
|                         |Mineral Resources into   |mineralogical samples.    |
|                         |varying confidence       |                          |
|                         |categories.              |The classification of the |
|                         |                         |Measured, Indicated, and  |
|                         |Whether appropriate      |Inferred Mineral Resources|
|                         |account has been taken of|was supported by the      |
|                         |all relevant factors     |uniform grid spacing of   |
|                         |(i.e., relative          |drilling, uncomplicated   |
|                         |confidence in            |and consistent geology,   |
|Classification           |tonnage/grade            |relatively good continuity|
|                         |estimations, reliability |of mineralisation         |
|                         |of input data, confidence|particularly along strike |
|                         |in continuity of geology |(and supported by the     |
|                         |and metal values,        |domain controlled         |
|                         |quality, quantity and    |variography), confidence  |
|                         |distribution of the      |in the down hole drilling |
|                         |data).                   |data and supporting       |
|                         |                         |criteria as noted above.  |
|                         |Whether the result       |                          |
|                         |appropriately reflects   |As Competent Person, Base |
|                         |the Competent Person’s   |Resources Exploration and |
|                         |view of the deposit.     |Resources Manager, Mr. Ian|
|                         |                         |Reudavey, considers that  |
|                         |                         |the result appropriately  |
|                         |                         |reflects a reasonable view|
|                         |                         |of the deposit            |
|                         |                         |categorisation.           |
|_________________________|_________________________|__________________________|
|                         |                         |No audits or reviews of   |
|                         |                         |this Mineral Resource     |
|                         |                         |estimate have been        |
|                         |                         |undertaken. However, it   |
|                         |                         |represents an update of an|
|                         |                         |existing Mineral Resource |
|                         |                         |that was initially        |
|                         |The results of any audits|completed by independent  |
|Audits or reviews.       |or reviews of Mineral    |consultants and was       |
|                         |Resource estimates.      |subject to internal       |
|                         |                         |review, and implements    |
|                         |                         |recommendations from that |
|                         |                         |review. Kwale North Dune  |
|                         |                         |is also currently being   |
|                         |                         |mined which represents the|
|                         |                         |ultimate test of a Mineral|
|                         |                         |Resource estimate.        |
|_________________________|_________________________|__________________________|
|                         |Where appropriate a      |                          |
|                         |statement of the relative|                          |
|                         |accuracy and confidence  |                          |
|                         |level in the Mineral     |                          |
|                         |Resource estimate using  |                          |
|                         |an approach or procedure |                          |
|                         |deemed appropriate by the|                          |
|                         |Competent Person. For    |                          |
|                         |example, the application |                          |
|                         |of statistical or        |Variography was undertaken|
|                         |geostatistical procedures|to determine the drill    |
|                         |to quantify the relative |hole support of the       |
|                         |accuracy of the resource |selected JORC Code        |
|                         |within stated confidence |classification.           |
|                         |limits, or, if such an   |                          |
|                         |approach is not deemed   |Validation of the model vs|
|                         |appropriate, a           |drill hole grades by      |
|                         |qualitative discussion of|direct observation and    |
|                         |the factors that could   |comparison of the results |
|Discussion of relative   |affect the relative      |on screen.                |
|accuracy/ confidence     |accuracy and confidence  |                          |
|                         |of the estimate.         |The resource statement is |
|                         |                         |a global estimate for the |
|                         |The statement should     |entire known extent of the|
|                         |specify whether it       |Kwale North Dune deposit  |
|                         |relates to global or     |within the designated     |
|                         |local estimates, and, if |mining area of SML 23.    |
|                         |local, state the relevant|                          |
|                         |tonnages, which should be|Production data shows     |
|                         |relevant to technical and|reasonable correlation    |
|                         |economic evaluation.     |with the resource         |
|                         |Documentation should     |estimate.                 |
|                         |include assumptions made |                          |
|                         |and the procedures used. |                          |
|                         |                         |                          |
|                         |These statements of      |                          |
|                         |relative accuracy and    |                          |
|                         |confidence of the        |                          |
|                         |estimate should be       |                          |
|                         |compared with production |                          |
|                         |data, where available.   |                          |
|_________________________|_________________________|__________________________|
______________________________________________________________________________
|Criteria                 |Explanation              |Comment                   |
|_________________________|_________________________|__________________________|
|                         |Nature and quality of    |                          |
|                         |sampling (e.g. cut       |                          |
|                         |channels, random chips,  |RCAC drilling was used to |
|                         |or specific specialised  |collect downhole samples  |
|                         |industry standard        |for the project.          |
|                         |measurement tools        |                          |
|                         |appropriate to the       |For 2017 and 2018 drilling|
|                         |minerals under           |a rig mounted rotary      |
|                         |investigation, such as   |splitter was used to      |
|                         |down hole gamma sondes,  |collect 25% of the 1.5m   |
|                         |or handheld XRF          |downhole sample interval, |
|                         |instruments, etc). These |equating to ~2.5kg.       |
|                         |examples should not be   |                          |
|                         |taken as limiting the    |For 2023 drilling the     |
|                         |broad meaning of         |entire 1.5m downhole      |
|                         |sampling.                |sample interval (averaging|
|                         |                         |~10kg) was collected from |
|                         |Include reference to     |which approximately 4kg   |
|                         |measures taken to ensure |was obtained via two-stage|
|                         |sample representivity and|riffle splitting.         |
|                         |the appropriate          |                          |
|                         |calibration of any       |Duplicate samples were    |
|                         |measurement tools or     |collected at the splitter |
|                         |systems used.            |for every 20th sample     |
|Sampling techniques      |                         |simultaneously with the   |
|                         |Aspects of the           |original sample.          |
|                         |determination of         |                          |
|                         |mineralisation that are  |A representative grab     |
|                         |Material to the Public   |sample from the sample    |
|                         |Report. In cases where   |bags was routinely washed |
|                         |‘industry standard’ work |and panned for            |
|                         |has been done this would |lithological logging as   |
|                         |be relatively simple     |well as visual HM content |
|                         |(e.g. ‘reverse           |estimate.                 |
|                         |circulation drilling was |                          |
|                         |used to obtain 1m samples|Samples were analysed by  |
|                         |from which 3kg was       |mineral sands             |
|                         |pulverised to produce a  |industry-standard         |
|                         |30g charge for fire      |techniques of screening,  |
|                         |assay’). In other cases  |de-sliming and heavy      |
|                         |more explanation may be  |liquid separation using   |
|                         |required, such as where  |SPT (sodium polytungstate)|
|                         |there is coarse gold that|at SG of 2.85g/cm3. XRF   |
|                         |has inherent sampling    |analysis of HM magnetic   |
|                         |problems. Unusual        |fractions was used to     |
|                         |commodities or           |define the mineral        |
|                         |mineralisation types     |assemblage.               |
|                         |(e.g. submarine nodules) |                          |
|                         |may warrant disclosure of|                          |
|                         |detailed information.    |                          |
|_________________________|_________________________|__________________________|
|                         |                         |173 holes in the 2017 and |
|                         |                         |2018 campaigns were       |
|                         |                         |drilled with a Wallis     |
|                         |                         |Mantis 80 RCAC drill rig  |
|                         |                         |using NQ drill tooling of |
|                         |                         |about 76mm diameter and a |
|                         |                         |3-blade aircore vacuum    |
|                         |                         |face sampling bit.        |
|                         |                         |                          |
|                         |                         |58 holes in the 2023      |
|                         |                         |campaign were drilled with|
|                         |                         |an EVH2100 RCAC rig using |
|                         |                         |Remet rods with an outside|
|                         |                         |diameter of about 75mm and|
|                         |                         |a 3-blade aircore vacuum  |
|                         |                         |face sampling bit.        |
|                         |                         |                          |
|                         |                         |12 mechanised auger holes |
|                         |                         |in the 2024 campaign were |
|                         |Drill type (e.g. core,   |completed immediately west|
|                         |reverse circulation,     |of the Bumamani deposit   |
|                         |open-hole hammer, rotary |with a GY-150 engineering |
|                         |air blast, auger, Bangka,|rig using 152mm auger     |
|                         |sonic, etc) and details  |bits. Although drilled for|
|                         |(e.g. core diameter,     |reconnaissance purposes,  |
|Drilling techniques      |triple or standard tube, |these holes were          |
|                         |depth of diamond tails,  |incorporated into the     |
|                         |face-sampling bit or     |estimation database where |
|                         |other type, whether core |significant gaps in       |
|                         |is oriented and if so, by|aircore drilling occurred.|
|                         |what method, etc).       |                          |
|                         |                         |For all drilling          |
|                         |                         |campaigns, the rig mast   |
|                         |                         |was orientated vertically |
|                         |                         |by spirit level before    |
|                         |                         |drilling, to adhere to    |
|                         |                         |best practices for        |
|                         |                         |geological boundary       |
|                         |                         |delineation.              |
|                         |                         |                          |
|                         |                         |Drilling was recorded in  |
|                         |                         |geological logs as either |
|                         |                         |dry or water-injected     |
|                         |                         |depending on ground       |
|                         |                         |conditions. Water         |
|                         |                         |injection was employed to |
|                         |                         |assist with penetration   |
|                         |                         |through silty/clayey      |
|                         |                         |formations to maintain    |
|                         |                         |sample quality and        |
|                         |                         |delivery.                 |
|_________________________|_________________________|__________________________|
|                         |                         |Sample condition was      |
|                         |                         |logged at the rig as      |
|                         |                         |either good, moderate or  |
|                         |                         |poor, with good meaning   |
|                         |                         |not contaminated and      |
|                         |Method of recording and  |appropriate sample size   |
|                         |assessing core and chip  |(recovery), moderate      |
|                         |sample recoveries and    |meaning not contaminated, |
|                         |results assessed.        |but sample over or        |
|                         |                         |undersized and poor       |
|                         |Measures taken to        |meaning contaminated or   |
|                         |maximise sample recovery |grossly over/undersized.  |
|                         |and ensure representative|                          |
|Drill sample recovery    |nature of the samples.   |Ground conditions of      |
|                         |                         |slightly damp silty sands |
|                         |Whether a relationship   |meant the best sample     |
|                         |exists between sample    |quality was achieved      |
|                         |recovery and grade and   |through slow penetration  |
|                         |whether sample bias may  |with water injection to   |
|                         |have occurred due to     |aid in the sample         |
|                         |preferential loss/gain of|recovery.                 |
|                         |fine/coarse material.    |                          |
|                         |                         |No relationship is        |
|                         |                         |believed to exist between |
|                         |                         |grade and sample recovery.|
|                         |                         |No bias is also believed  |
|                         |                         |to occur due to the loss  |
|                         |                         |of fine material.         |
|_________________________|_________________________|__________________________|
|                         |                         |Field logging was recorded|
|                         |                         |for all 3,987 fixed,      |
|                         |                         |down-hole intervals and   |
|                         |                         |was conducted by the site |
|                         |                         |Geologist as drilling and |
|                         |                         |sampling proceeded.       |
|                         |                         |Logging was based on a    |
|                         |                         |representative grab sample|
|                         |                         |that was panned for host  |
|                         |                         |material observations and |
|                         |                         |heavy mineral estimation. |
|                         |                         |                          |
|                         |                         |Standardised logging codes|
|                         |                         |were developed in the     |
|                         |Whether core and chip    |logging software          |
|                         |samples have been        |(LogChief) to capture     |
|                         |geologically and         |observations on lithology,|
|                         |geotechnically logged to |colour, grain size,       |
|                         |a level of detail to     |induration, and estimated |
|                         |support appropriate      |HM. Any relevant comments |
|                         |Mineral Resource         |e.g., water table, gangue |
|                         |estimation, mining       |HM components and         |
|                         |studies and metallurgical|stratigraphic markers were|
|                         |studies.                 |included to aid in the    |
|Logging                  |                         |subsequent geological     |
|                         |Whether logging is       |modelling.                |
|                         |qualitative or           |                          |
|                         |quantitative in nature.  |A qualitative estimate of |
|                         |Core (or costean,        |how representative a      |
|                         |channel, etc)            |sample was of the drilled |
|                         |photography.             |interval was recorded by  |
|                         |                         |Base Titanium field       |
|                         |The total length and     |geologists whilst logging.|
|                         |percentage of the        |                          |
|                         |relevant intersections   |Heavy mineral sinks from  |
|                         |logged.                  |assayed samples were      |
|                         |                         |logged routinely under a  |
|                         |                         |reflected-light,          |
|                         |                         |stereoscopic microscope.  |
|                         |                         |This work was carried out |
|                         |                         |to capture information    |
|                         |                         |relating to VHM content,  |
|                         |                         |mineralogy, HM grainsize  |
|                         |                         |and quality.              |
|                         |                         |                          |
|                         |                         |The logging is of         |
|                         |                         |sufficient detail to      |
|                         |                         |support Mineral Resource  |
|                         |                         |estimation, mining studies|
|                         |                         |and metallurgical studies.|
|_________________________|_________________________|__________________________|
|                         |                         |For the 2017/2018         |
|                         |                         |drilling, approximately   |
|                         |                         |25% of the sample interval|
|                         |                         |was rotary split at the   |
|                         |                         |sampling cyclone on the   |
|                         |                         |rig.                      |
|                         |                         |                          |
|                         |                         |For the 2023 aircore and  |
|                         |                         |2024 auger drilling, the  |
|                         |                         |entire sample interval was|
|                         |                         |collected mostly wet and  |
|                         |                         |bagged on-site in         |
|                         |                         |polyweave bags with       |
|                         |                         |internal plastic lining to|
|                         |                         |avoid loss of slimes.     |
|                         |                         |Following air drying of   |
|                         |                         |excess moisture, an       |
|                         |                         |approximate 25% split     |
|                         |                         |(~5kg) of the drilled     |
|                         |                         |material was collected via|
|                         |                         |riffle splitting.         |
|                         |                         |                          |
|                         |                         |The split sample was      |
|                         |                         |processed in a dedicated  |
|                         |                         |sample preparation        |
|                         |                         |facility that follows     |
|                         |                         |conventional mineral sands|
|                         |                         |processes. Samples were   |
|                         |                         |air-dried when weather    |
|                         |                         |permitted, otherwise they |
|                         |                         |were oven-dried during wet|
|                         |                         |weather. After drying, the|
|                         |                         |sample was rotary split to|
|                         |                         |produce a ~200-400g sample|
|                         |                         |for analytical work. The  |
|                         |                         |remaining drill sample    |
|                         |                         |material was combined and |
|                         |                         |split down to ~2-3kgs for |
|                         |                         |storage as a reference    |
|                         |                         |sample.                   |
|                         |                         |                          |
|                         |                         |The analytical split      |
|                         |                         |sample was wet screened   |
|                         |                         |using 45 µm and 1 mm      |
|                         |                         |sieves, to generate       |
|                         |                         |oversize and sand         |
|                         |                         |fractions, with slimes    |
|                         |                         |lost during screening and |
|                         |                         |calculated by difference. |
|                         |                         |                          |
|                         |                         |The sample preparation    |
|                         |                         |stage aligns with industry|
|                         |                         |best practice to deliver a|
|                         |                         |high degree of confidence |
|                         |                         |in the results. Steps     |
|                         |                         |include the following:    |
|                         |                         |                          |
|                         |                         |    --  A formalised      |
|                         |                         |        process flow is   |
|                         |                         |        posted in all     |
|                         |                         |        sample preparation|
|                         |                         |        areas and used to |
|                         |                         |        train and monitor |
|                         |                         |        sample preparation|
|                         |                         |        staff.            |
|                         |                         |    --  Regular monitoring|
|                         |                         |        is completed by   |
|                         |                         |        Base Titanium     |
|                         |                         |        senior staff.     |
|                         |                         |    --  Field samples are |
|                         |                         |        left in their bags|
|                         |If core, whether cut or  |        for initial       |
|                         |sawn and whether quarter,|        air-drying to     |
|                         |half or all core taken.  |        avoid sample loss.|
|                         |                         |    --  TSPP dispersant is|
|                         |If non-core, whether     |        utilised to       |
|                         |riffled, tube sampled,   |        decrease attrition|
|                         |rotary split, etc and    |        time (to 15       |
|                         |whether sampled wet or   |        minutes) and      |
|                         |dry.                     |        improve slimes    |
|                         |                         |        recovery.         |
|                         |For all sample types, the|    --  Staff are trained |
|                         |nature, quality and      |        to use paint      |
|                         |appropriateness of the   |        brushes and water |
|                         |sample preparation       |        spray rather than |
|                         |technique.               |        manipulate samples|
|                         |                         |        through the screen|
|                         |Quality control          |        by hand to remove |
|Sub-sampling techniques  |procedures adopted for   |        the potential for |
|and sample preparation   |all sub-sampling stages  |        screen damage.    |
|                         |to maximise              |    --  A calibration     |
|                         |representivity of        |        schedule is       |
|                         |samples.                 |        utilised for      |
|                         |                         |        scales used in the|
|                         |Measures taken to ensure |        sample preparation|
|                         |that the sampling is     |        stage.            |
|                         |representative of the    |    --  The introduction  |
|                         |in-situ material         |        of LIMS software  |
|                         |collected, including for |        allows the capture|
|                         |instance results for     |        of sample         |
|                         |field                    |        preparation data  |
|                         |duplicate/second-half    |        digitally at      |
|                         |sampling.                |        inception and     |
|                         |                         |        synchronisation in|
|                         |Whether sample sizes are |        real-time to the  |
|                         |appropriate to the grain |        master Kwale      |
|                         |size of the material     |        Laboratory SQL    |
|                         |being sampled.           |        database.         |
|                         |                         |    --  Slimes screen     |
|                         |                         |        numbers are       |
|                         |                         |        recorded to       |
|                         |                         |        isolate batches   |
|                         |                         |        should re-assay be|
|                         |                         |        required due to   |
|                         |                         |        poor adherence to |
|                         |                         |        procedure or to   |
|                         |                         |        identify screen   |
|                         |                         |        damage.           |
|                         |                         |    --  Duplicate samples |
|                         |                         |        were collected at |
|                         |                         |        every 20th sample |
|                         |                         |        and assessed      |
|                         |                         |        regularly to      |
|                         |                         |        ensure            |
|                         |                         |        representivity was|
|                         |                         |        achieved.         |
|                         |                         |The drill rods and cyclone|
|                         |                         |were routinely cleaned    |
|                         |                         |between holes using       |
|                         |                         |pressurised water to avoid|
|                         |                         |inter-hole contamination. |
|                         |                         |The sample preparation    |
|                         |                         |flow sheet follows        |
|                         |                         |conventional mineral sands|
|                         |                         |processes but departed    |
|                         |                         |from standard mineral sand|
|                         |                         |practices in one respect; |
|                         |                         |the samples were generally|
|                         |                         |not oven-dried before     |
|                         |                         |de-sliming to prevent clay|
|                         |                         |minerals baking onto the  |
|                         |                         |HM grains (because the HM |
|                         |                         |fractions were to be used |
|                         |                         |in further analysis).     |
|                         |                         |Instead, a separate sample|
|                         |                         |was split and dried to    |
|                         |                         |determine moisture        |
|                         |                         |content, which was        |
|                         |                         |accounted for             |
|                         |                         |mathematically.           |
|                         |                         |                          |
|                         |                         |QA/QC procedures involved |
|                         |                         |the following:            |
|                         |                         |                          |
|                         |                         |    --  Prepared duplicate|
|                         |                         |        split samples were|
|                         |                         |        processed at every|
|                         |                         |        20th sample.      |
|                         |                         |    --  Prepared repeat   |
|                         |                         |        samples were      |
|                         |                         |        processed at every|
|                         |                         |        7th sample.       |
|                         |                         |    --  The manual        |
|                         |                         |        hard-copy sample  |
|                         |                         |        preparation       |
|                         |                         |        records were      |
|                         |                         |        maintained in     |
|                         |                         |        files in the event|
|                         |                         |        of                |
|                         |                         |        cross-references  |
|                         |                         |        due to identified |
|                         |                         |        scribing errors in|
|                         |                         |        LIMS software.    |
|                         |                         |The sample size is        |
|                         |                         |considered appropriate for|
|                         |                         |the grain size of the     |
|                         |                         |material because the grade|
|                         |                         |of HM is measured in per  |
|                         |                         |cent.                     |
|_________________________|_________________________|__________________________|
|                         |                         |The assay process employed|
|                         |                         |included a Sample         |
|                         |                         |Preparation stage,        |
|                         |                         |completed by Base Titanium|
|                         |                         |staff, followed by a heavy|
|                         |                         |liquid separation (using  |
|                         |                         |sodium polytungstate) at  |
|                         |                         |SG = 2.85g/cm3), completed|
|                         |                         |at Kwale Operations’ site |
|                         |                         |laboratory.               |
|                         |                         |                          |
|                         |                         |The assaying and          |
|                         |                         |laboratory procedures used|
|                         |                         |are considered to follow  |
|                         |                         |industry best practice and|
|                         |                         |the technique is          |
|                         |                         |considered as a total     |
|                         |                         |analysis.                 |
|                         |                         |                          |
|                         |                         |The dried, deslimed       |
|                         |                         |processed samples were    |
|                         |                         |submitted to the Kwale    |
|                         |                         |Operations laboratory with|
|                         |                         |the following approach    |
|                         |                         |adopted.                  |
|                         |                         |                          |
|                         |                         |All samples were dried and|
|                         |                         |weighed.                  |
|                         |                         |                          |
|                         |                         |Sand fraction was         |
|                         |The nature, quality and  |processed by SPT heavy    |
|                         |appropriateness of the   |liquid separation to      |
|                         |assaying and laboratory  |generate a HM fraction.   |
|                         |procedures used and      |                          |
|                         |whether the technique is |The HM fraction was       |
|                         |considered partial or    |subject to magnetic       |
|                         |total.                   |separation on a roll      |
|                         |                         |magnet to generate a      |
|                         |For geophysical tools,   |magnetic (Mag) fraction   |
|                         |spectrometers, handheld  |and a non-magnetic        |
|                         |XRF instruments, etc, the|(non-Mag) fraction.       |
|                         |parameters used in       |                          |
|                         |determining the analysis |XRF analysis of magnetic  |
|Quality of assay data and|including instrument make|fractions was completed   |
|laboratory tests         |and model, reading times,|with the data used to     |
|                         |calibrations factors     |model the mineralogy using|
|                         |applied and their        |the Company’s internally  |
|                         |derivation, etc.         |developed algorithms      |
|                         |                         |(MinModel).               |
|                         |Nature of quality control|                          |
|                         |procedures adopted (e.g. |The proprietary MinMod    |
|                         |standards, blanks,       |mineralogy technique,     |
|                         |duplicates, external     |developed and employed by |
|                         |laboratory checks) and   |Base Resources, comprises |
|                         |whether acceptable levels|an XRF analysis of the    |
|                         |of accuracy (i.e. lack of|magnetic and non-magnetic |
|                         |bias) and precision have |fractions of each         |
|                         |been established.        |composite or sample, the  |
|                         |                         |results from which are    |
|                         |                         |then back-calculated to   |
|                         |                         |determine in-ground       |
|                         |                         |mineralogy. MinMod has    |
|                         |                         |been validated by external|
|                         |                         |quantitative analysis     |
|                         |                         |(QEMSCAN and EDX) and is  |
|                         |                         |considered sufficiently   |
|                         |                         |certified to support      |
|                         |                         |quoted resource confidence|
|                         |                         |in this report.           |
|                         |                         |                          |
|                         |                         |Various quality control   |
|                         |                         |samples were submitted    |
|                         |                         |routinely to assure assay |
|                         |                         |quality. A total of 112   |
|                         |                         |duplicate field samples,  |
|                         |                         |108 lab duplicate sample  |
|                         |                         |preparation samples, 68   |
|                         |                         |field standard samples, 84|
|                         |                         |lab standard samples and  |
|                         |                         |71 instrument stability   |
|                         |                         |standards have been       |
|                         |                         |assayed at Kwale          |
|                         |                         |Operations’ site          |
|                         |                         |laboratory.               |
|                         |                         |                          |
|                         |                         |Acceptable levels of      |
|                         |                         |accuracy and precision    |
|                         |                         |have been established.    |
|_________________________|_________________________|__________________________|
|                         |                         |The Bumamani Deposit is a |
|                         |                         |moderate to low HM grade, |
|                         |                         |dunal and paleo-beach     |
|                         |                         |style accumulation that   |
|                         |                         |does not carry excessive  |
|                         |                         |mineralisation or suffer  |
|                         |                         |from ‘nugget’ effects,    |
|                         |                         |typical of other          |
|                         |                         |commodities.              |
|                         |                         |                          |
|                         |                         |An external audit         |
|                         |                         |validation was completed  |
|                         |                         |for the HM analyses       |
|                         |                         |included in the Bumamani  |
|                         |                         |Mineral Resources estimate|
|                         |                         |by IHC Robbins in 2020.   |
|                         |                         |                          |
|                         |                         |An internal audit         |
|                         |                         |validation was completed  |
|                         |                         |by the Base Resources     |
|                         |                         |Exploration & Resources   |
|                         |                         |Manager who is a Competent|
|                         |The verification of      |Person.                   |
|                         |significant intersections|                          |
|                         |by either independent or |A total of 12 twin drill  |
|                         |alternative company      |holes were completed      |
|                         |personnel.               |between the two drilling  |
|                         |                         |programmes, representing  |
|                         |The use of twinned holes.|about 5.2% of the total   |
|Verification of sampling |                         |programme. These twin     |
|and assaying             |Documentation of primary |holes are used to quantify|
|                         |data, data entry         |short-range variability in|
|                         |procedures, data         |geological character and  |
|                         |verification, data       |grade intersections and   |
|                         |storage (physical and    |were drilled throughout   |
|                         |electronic) protocols.   |the deposit.              |
|                         |                         |                          |
|                         |Discuss any adjustment to|The spatially             |
|                         |assay data.              |well-represented twin-hole|
|                         |                         |paired data shows a good  |
|                         |                         |correlation, considered   |
|                         |                         |material to the           |
|                         |                         |integrity/quality of the  |
|                         |                         |resource data.            |
|                         |                         |                          |
|                         |                         |Drill hole logging and    |
|                         |                         |site sample data were     |
|                         |                         |collected electronically  |
|                         |                         |in Maxwell LogChief       |
|                         |                         |software, installed on    |
|                         |                         |field Panasonic Tough pads|
|                         |                         |that synchronise directly |
|                         |                         |to the Datashed database. |
|                         |                         |Assay data is captured    |
|                         |                         |electronically via LIMS   |
|                         |                         |software and merged with  |
|                         |                         |logging and sample data in|
|                         |                         |the Datashed database.    |
|                         |                         |                          |
|                         |                         |No adjustment to assay    |
|                         |                         |data was made.            |
|_________________________|_________________________|__________________________|
|                         |                         |Proposed drill holes were |
|                         |                         |sited on the ground using |
|                         |                         |hand-held Garmin GPS units|
|                         |                         |with an accuracy of ~ 3m. |
|                         |                         |After drilling, the mine  |
|                         |                         |surveyors picked collar   |
|                         |                         |positions via a DGPS RTK  |
|                         |                         |unit registered to local  |
|                         |                         |base stations. The        |
|                         |                         |accuracy of the RTK unit  |
|                         |                         |is stated at 0.02m in the |
|                         |                         |X, Y and Z axes.          |
|                         |                         |                          |
|                         |                         |The survey geodetic datum |
|                         |                         |utilised is UTM Arc 1960, |
|                         |                         |used in east Africa. Arc  |
|                         |Accuracy and quality of  |1960 references the Clark |
|                         |surveys used to locate   |1880 (RGS) ellipsoid and  |
|                         |drill holes (collar and  |the Greenwich prime       |
|                         |down-hole surveys),      |meridian. All survey data |
|                         |trenches, mine workings  |used in the Bumamani      |
|                         |and other locations used |Mineral Resource dataset  |
|                         |in Mineral Resource      |has undergone a           |
|Location of data points  |estimation.              |transformation to the     |
|                         |                         |local mine grid from the  |
|                         |Specification of the grid|standard UTM Zone 37S (Arc|
|                         |system used.             |1960). The local grid was |
|                         |                         |rotated at (-42.5°) which |
|                         |Quality and adequacy of  |aligned the average       |
|                         |topographic control.     |regional strike with the  |
|                         |                         |local North and was useful|
|                         |                         |for both grade            |
|                         |                         |interpolation and mining  |
|                         |                         |reference during          |
|                         |                         |production.               |
|                         |                         |                          |
|                         |                         |All drill collars are     |
|                         |                         |projected to the local    |
|                         |                         |LIDAR DTM captured over   |
|                         |                         |the resource area in 2018 |
|                         |                         |at a 2x2m grid spacing.   |
|                         |                         |This was performed before |
|                         |                         |interpretation and model  |
|                         |                         |construction, to eliminate|
|                         |                         |any elevation disparities |
|                         |                         |for the block model       |
|                         |                         |construction.             |
|_________________________|_________________________|__________________________|
|                         |                         |The drill data spacing    |
|                         |                         |from the 2017/2018 and    |
|                         |                         |2023 Bumamani Mineral     |
|                         |                         |Resource drilling         |
|                         |Data spacing for         |programmes was on average |
|                         |reporting of Exploration |50m East, 100m North and  |
|                         |Results.                 |1.5m downhole. Variations |
|                         |                         |from this spacing resulted|
|                         |Whether the data spacing |from terrain challenges or|
|                         |and distribution is      |low grades.               |
|                         |sufficient to establish  |                          |
|                         |the degree of geological |This spacing and          |
|Data spacing and         |and grade continuity     |distribution was          |
|distribution             |appropriate for the      |considered sufficient to  |
|                         |Mineral Resource and Ore |establish the degree of   |
|                         |Reserve estimation       |geological and            |
|                         |procedure(s) and         |mineralisation continuity |
|                         |classifications applied. |appropriate for the       |
|                         |                         |resource estimation       |
|                         |Whether sample           |procedures and            |
|                         |compositing has been     |classifications applied.  |
|                         |applied.                 |                          |
|                         |                         |No sample compositing has |
|                         |                         |been applied for HM,      |
|                         |                         |slimes, oversize and XRF  |
|                         |                         |assays.                   |
|_________________________|_________________________|__________________________|
|                         |                         |With the geological       |
|                         |                         |setting being a layered   |
|                         |                         |dunal/marine/fluviatile   |
|                         |                         |sequence, the orientation |
|                         |                         |of the deposit            |
|                         |                         |mineralisation in general |
|                         |                         |is sub-horizontal. All    |
|                         |                         |drill holes were          |
|                         |Whether the orientation  |orientated vertically     |
|                         |of sampling achieves     |(-90°) to penetrate the   |
|                         |unbiased sampling of     |sub-horizontal            |
|                         |possible structures and  |mineralisation            |
|                         |the extent to which this |orthogonally.             |
|                         |is known, considering the|                          |
|                         |deposit type.            |Hole centres were spaced  |
|Orientation of data in   |                         |at 50m. This              |
|relation to geological   |If the relationship      |cross-profiled the ore    |
|structure                |between the drilling     |zones so that variation   |
|                         |orientation and the      |could be determined.      |
|                         |orientation of key       |Downhole intervals at 1.5 |
|                         |mineralised structures is|metres provided adequate  |
|                         |considered to have       |sampling resolution to    |
|                         |introduced a sampling    |capture the distribution  |
|                         |bias, this should be     |and variability of geology|
|                         |assessed and reported if |units and mineralisation  |
|                         |material.                |encountered vertically.   |
|                         |                         |                          |
|                         |                         |The orientation of the    |
|                         |                         |drilling was considered   |
|                         |                         |appropriate for testing   |
|                         |                         |the horizontal and        |
|                         |                         |vertical extent of        |
|                         |                         |mineralisation without    |
|                         |                         |bias.                     |
|_________________________|_________________________|__________________________|
|                         |                         |Drill samples were        |
|                         |                         |transported daily from    |
|                         |                         |site to the secure sample |
|                         |                         |preparation facility by   |
|                         |                         |company personnel.        |
|                         |                         |                          |
|                         |                         |Sample residues from the  |
|                         |                         |preparation stage were    |
|                         |                         |transferred to pallets and|
|                         |                         |stored in a locked sample |
|                         |                         |storage shed beside the   |
|                         |                         |warehouse at the Kwale    |
|                         |                         |Operations.               |
|                         |                         |                          |
|                         |                         |Residues from the Kwale   |
|                         |                         |Operations Laboratory were|
|                         |                         |placed in labelled jars   |
|                         |                         |and stored in numbered    |
|                         |                         |boxes inside a container  |
|                         |                         |near the prepatory lab    |
|                         |The measures taken to    |facility.                 |
|Sample security          |ensure sample security.  |                          |
|                         |                         |Remnant drill samples were|
|                         |                         |packed in labelled wood   |
|                         |                         |pallets and stored in a   |
|                         |                         |dedicated storage shed    |
|                         |                         |facility.                 |
|                         |                         |                          |
|                         |                         |Sample tables are housed  |
|                         |                         |on a secure,              |
|                         |                         |network-hosted SQL        |
|                         |                         |database. Administration  |
|                         |                         |privileges are limited to |
|                         |                         |two Base Titanium staff:  |
|                         |                         |Exploration Superintendent|
|                         |                         |and the Business          |
|                         |                         |Applications              |
|                         |                         |Administrator.            |
|                         |                         |                          |
|                         |                         |Data is backed up every 12|
|                         |                         |hours and stored in       |
|                         |                         |perpetuity on a secure,   |
|                         |                         |site backup server.       |
|_________________________|_________________________|__________________________|
|                         |                         |IHC Robbins Geological    |
|                         |                         |Services validated the    |
|                         |                         |resource data and reviewed|
|                         |                         |the completed block model |
|                         |                         |in 2020, and considered   |
|                         |                         |the model fit for purpose.|
|                         |                         |                          |
|                         |The results of any audits|Base Resources Exploration|
|Audits or reviews        |or reviews of sampling   |and Resources Manager, Mr.|
|                         |techniques and data.     |Ian Reudavey reviewed the |
|                         |                         |Bumamani geological       |
|                         |                         |interpretations,          |
|                         |                         |wireframes and assay and  |
|                         |                         |mineralogy data           |
|                         |                         |interpolations and        |
|                         |                         |following minor revisions |
|                         |                         |considered the data fit   |
|                         |                         |for purpose.              |
|_________________________|_________________________|__________________________|
Criteria                  Explanation                Comment

                                                     The Bumamani project is
                                                     located within SML 23,
                                                     which is 100% held by Base
                          Type, reference            Titanium, a wholly owned
                          name/number, location and  subsidiary of Base
                          ownership including        Resources.
                          agreements or material
                          issues with third parties  SML 23 was initially
                          such as joint ventures,    granted in 2004 and
                          partnerships, overriding   extended in June 2022 to
                          royalties, native title    cover the Kwale North Dune
Mineral tenement and land interests, historical      and Bumamani Ore Reserves.
tenure status             sites, wilderness or
                          national park and          SML 23 is in good standing
                          environmental settings.    with the State Department
                                                     for Mining and expires on
                          The security of the tenure 30 June 2025.
                          held at the time of
                          reporting along with any   Local landowners are
                          known impediments to       generally supportive of
                          obtaining a licence to     exploration and mining
                          operate in the area.       activities with established
                                                     community relations and
                                                     development programs in
                                                     place.

                          Acknowledgment and         No known historical
Exploration done by other appraisal of exploration   exploration by third
parties                   by other parties.          parties was undertaken in
                                                     the Bumamani area.

                                                     The Bumamani deposits are
                                                     primarily hosted in the
                                                     ‘Margarini Formation’
                                                     comprising reddish-brown,
                                                     well-sorted, fine-grained
                                                     dune sands overlying clay
                                                     fluviatile units, which in
                                                     turn overlie a Mesozoic
                                                     sandstone base, known as
                                                     the Mazeras formation. All
                                                     formations are locally
                                                     enriched in HM, with the
                                                     VHM suite dominated by
                                                     ilmenite, with lesser
                                                     rutile and zircon.

                                                     These three units are
                                                     separated by lateritic
                                                     paleo-surfaces which
                                                     signify a time-gap between
                                                     the geological formations.

                                                     The Mazeras Sandstone,
                          Deposit type, geological   derived from the
Geology                   setting and style of       disintegration of the
                          mineralisation.            Mozambique Belt metamorphic
                                                     rocks, has likely provided
                                                     the supply of heavy
                                                     minerals to the Margarini
                                                     sand dunes and the
                                                     fluviatile formations.

                                                     The eastern part of the
                                                     Bumamani deposit, occurring
                                                     at around 50-60m above sea
                                                     level, is hosted in well
                                                     drained, yellow to white,
                                                     loose, marine sands
                                                     occurring along an subtle
                                                     arcuate topographic ridge.
                                                     These sands are a result of
                                                     marine transgression events
                                                     before the mid-Pleistocene
                                                     that resulted in raised
                                                     beaches, reworking existing
                                                     Margarini deposits and
                                                     locally concentrating them
                                                     into small high-grade
                                                     deposits.

                                                     Drilling by year used for
                                                     the resource model build
                                                     was as follows:

                                                     2017 stratigraphic drilling

                          A summary of all               --  39 RCAC drill holes
                          information material to            (depth: max 75m,
                          the understanding of the           min 12m, average
                          exploration results                25.8m)
                          including a tabulation of      --  Total 1,005m
                          the following information          drilled.
                          for all Material drill     2018 exploration drilling
                          holes:
                                                         --  134 RCAC drill
                          easting and northing of            holes (depth: max
                          the drill hole collar              27m, min 6m,
                                                             average 13.0m).
                          elevation or RL (Reduced       --  Total 1,743m
                          Level – elevation above            drilled.
                          sea level in metres) of    2023 exploration drilling
                          the drill hole collar
                                                         --  58 RCAC drill holes
                          dip and azimuth of the             (depth: max 22.5m,
Drill hole Information    hole                               min 13.5m, average
                                                             17.1m).
                          down hole length and           --  Total 990m drilled.
                          interception depth         2024 exploration drilling

                          hole length.                   --  12 auger drill
                                                             holes (depth: max
                          If the exclusion of this           15m, min 12m,
                          information is justified           average 14.5m).
                          on the basis that the          --  Total 174m drilled.
                          information is not         See the drill hole location
                          Material and this          plan in the attached Figure
                          exclusion does not detract 5.
                          from the understanding of
                          the report, the Competent  All drill holes were
                          Person should clearly      drilled vertically.
                          explain why this is the
                          case.                      All collars were projected
                                                     to the LIDAR topographical
                                                     surface.

                                                     A tabulation of material
                                                     drill holes is not included
                                                     as exploration results are
                                                     not being reported.

                          In reporting Exploration
                          Results, weighting
                          averaging techniques,
                          maximum and/or minimum
                          grade truncations (e.g.
                          cutting of high grades)
                          and cut-off grades are
                          usually Material and
                          should be stated.          Exploration results are not
                                                     being reported.
                          Where aggregate intercepts
                          incorporate short lengths  No metal equivalent values
Data aggregation methods  of high-grade results and  were used.
                          longer lengths of low
                          grade results, the         No aggregation of short
                          procedure used for such    length samples used as
                          aggregation should be      samples were consistently
                          stated and some typical    1.5m intervals.
                          examples of such
                          aggregations should be
                          shown in detail.

                          The assumptions used for
                          any reporting of metal
                          equivalent values should
                          be clearly stated.

                          These relationships are
                          particularly important in
                          the reporting of
                          Exploration Results.

                          If the geometry of the
                          mineralisation with        The deposit sequences are
Relationship between      respect to the drill hole  sub-horizontal, and the
mineralisation widths and angle is known, its nature vertically inclined holes
intercept lengths         should be reported.        are a fair representation
                                                     of true thickness.
                          If it is not known and
                          only the down hole lengths
                          are reported, there should
                          be a clear statement to
                          this effect (e.g. ‘down
                          hole length, true width
                          not known’).

                          Appropriate maps and
                          sections (with scales) and
                          tabulations of intercepts
                          should be included for any
                          significant discovery      See attached Figures 4 and
Diagrams                  being reported These       5.
                          should include, but not be
                          limited to a plan view of
                          drill hole collar
                          locations and appropriate
                          sectional views.

                          Where comprehensive
                          reporting of all
                          Exploration Results is not
                          practicable,
Balanced reporting        representative reporting   Exploration results are not
                          of both low and high       being reported.
                          grades and/or widths
                          should be practiced to
                          avoid misleading reporting
                          of Exploration Results.

                          Other exploration data, if
                          meaningful and material,
                          should be reported
                          including (but not limited The Bumamani dunal and
                          to): geological            fossil beach material
                          observations; geophysical  contains significantly
                          survey results;            lower slimes than the Kwale
Other substantive         geochemical survey         North Dune deposit. This
exploration data          results; bulk samples –    characteristic is
                          size and method of         beneficial when mining the
                          treatment; metallurgical   deposit concurrently with
                          test results; bulk         the Kwale North Dune to
                          density, groundwater,      provide a blended feed to
                          geotechnical and rock      the processing plants.
                          characteristics; potential
                          deleterious or
                          contaminating substances.

                          The nature and scale of
                          planned further work (e.g. No further work is
                          tests for lateral          recommended or planned as
                          extensions or depth        the deposit is currently
                          extensions or large-scale  being mined and, with the
                          step-out drilling).        planned cessation of mining
                                                     activities at Kwale
Further work              Diagrams clearly           Operations in December 2024
                          highlighting the areas of  following the depletion of
                          possible extensions,       existing Ore Reserves,
                          including the main         there are no potential mine
                          geological interpretations extensions that have not
                          and future drilling areas, already been identified and
                          provided this information  assessed.
                          is not commercially
                          sensitive.
______________________________________________________________________________
|Criteria                 |Explanation              |Comment                   |
|_________________________|_________________________|__________________________|
|                         |                         |Field data was captured in|
|                         |                         |LogChief logging          |
|                         |                         |application and           |
|                         |                         |automatically validated   |
|                         |                         |through reference to      |
|                         |                         |pre-set library table     |
|                         |                         |configurations. Typing or |
|                         |                         |logging code errors,      |
|                         |                         |duplication of key        |
|                         |                         |identifiers (e.g.,        |
|                         |                         |HOLE_ID, SAMPLEID) and    |
|                         |                         |conflicts in related      |
|                         |                         |tables (e.g. downhole     |
|                         |                         |depth) are quarantined by |
|                         |                         |the software and require  |
|                         |                         |resolving immediately     |
|                         |                         |before logging can        |
|                         |                         |proceed.                  |
|                         |                         |                          |
|                         |                         |The SQL database also has |
|                         |                         |identical automated       |
|                         |                         |validation features. Data |
|                         |                         |import is unsuccessful    |
|                         |                         |until these data issues   |
|                         |                         |are resolved.             |
|                         |                         |                          |
|                         |                         |Field logging and assay   |
|                         |                         |data from the SQL database|
|                         |                         |were imported into        |
|                         |                         |Micromine software for    |
|                         |                         |sectional interpretation. |
|                         |                         |                          |
|                         |                         |Validation steps included |
|                         |                         |a visual interrogation of |
|                         |                         |collar versus geology     |
|                         |                         |depths, a review of hole  |
|                         |                         |locations against the     |
|                         |                         |drilling plan and a check |
|                         |                         |for missing or duplicated |
|                         |                         |logged fields and         |
|                         |                         |outliers. Any spurious or |
|                         |                         |questionable entries were |
|                         |                         |resolved by the           |
|                         |                         |supervising Geologist.    |
|                         |                         |                          |
|                         |                         |A field diary was utilised|
|                         |                         |by the site Geologist to  |
|                         |                         |record the hole name,     |
|                         |Measures taken to ensure |date, depth, number of    |
|                         |that data has not been   |samples, time of start and|
|                         |corrupted by, for        |finish, a description of  |
|                         |example, transcription or|the hole location relative|
|                         |keying errors, between   |to the previous hole and  |
|Database integrity       |its initial collection   |other relative            |
|                         |and its use for Mineral  |observations. Such a diary|
|                         |Resource estimation      |provides valuable evidence|
|                         |purposes.                |if there is an error in   |
|                         |                         |hole naming or surveying. |
|                         |Data validation          |                          |
|                         |procedures used.         |A geologist was employed  |
|                         |                         |to manage digital data    |
|                         |                         |capture at the sample     |
|                         |                         |preparation laboratory to |
|                         |                         |reduce the potential for  |
|                         |                         |data entry error by       |
|                         |                         |unskilled labourers.      |
|                         |                         |Several validation checks |
|                         |                         |were made of sample       |
|                         |                         |preparation data to ensure|
|                         |                         |accurate data entry and   |
|                         |                         |application of correct    |
|                         |                         |procedure by Base Titanium|
|                         |                         |staff. This included:     |
|                         |                         |                          |
|                         |                         |    --  Comparison of     |
|                         |                         |        pre-versus        |
|                         |                         |        post-oven weights.|
|                         |                         |    --  Comparison of     |
|                         |                         |        split weight      |
|                         |                         |        versus de-slimed  |
|                         |                         |        weight.           |
|                         |                         |    --  Comparison of     |
|                         |                         |        split weight      |
|                         |                         |        versus field      |
|                         |                         |        sample weight.    |
|                         |                         |    --  All sample        |
|                         |                         |        preparation data  |
|                         |                         |        was sorted by each|
|                         |                         |        field and outliers|
|                         |                         |        were investigated.|
|                         |                         |Assay results were        |
|                         |                         |delivered via email in 45 |
|                         |                         |sample batches from Kwale |
|                         |                         |Operations’ site          |
|                         |                         |laboratory. These were in |
|                         |                         |the form of CSV text files|
|                         |                         |and imported by batch     |
|                         |                         |number directly into the  |
|                         |                         |SQL database tables where |
|                         |                         |pre-set algorithms        |
|                         |                         |converted weights to      |
|                         |                         |percentages and removed   |
|                         |                         |the moisture content. The |
|                         |                         |calculated assay results  |
|                         |                         |are then checked manually |
|                         |                         |for missing records and   |
|                         |                         |out-of-range or           |
|                         |                         |unrealistic values.       |
|_________________________|_________________________|__________________________|
|                         |                         |The Competent Person is   |
|                         |                         |Base Titanium Exploration |
|                         |                         |Manager, Mr Edwin Owino,  |
|                         |Comment on any site      |and he is based at Kwale  |
|                         |visits undertaken by the |Operations and oversaw the|
|                         |Competent Person and the |drilling program and      |
|                         |outcome of those visits. |sample collection. The    |
|Site visits              |                         |Competent Person is       |
|                         |If no site visits have   |satisfied with the        |
|                         |been undertaken indicate |integrity of the database |
|                         |why this is the case.    |as well as the delineation|
|                         |                         |of the geological         |
|                         |                         |boundaries having many    |
|                         |                         |years of experience at    |
|                         |                         |Kwale Operations.         |
|_________________________|_________________________|__________________________|
|                         |                         |The geological            |
|                         |                         |interpretation was        |
|                         |                         |undertaken by the Base    |
|                         |                         |Titanium Exploration      |
|                         |                         |Manager by using field    |
|                         |                         |logs and observations,    |
|                         |                         |assays, HM sink logs, XRF |
|                         |                         |oxide chemistry and       |
|                         |                         |mineralogy data.          |
|                         |                         |                          |
|                         |                         |The data spacing for the  |
|                         |                         |project is considered     |
|                         |                         |sufficient for grade and  |
|                         |                         |mineralogical continuity. |
|                         |                         |                          |
|                         |                         |Three mineralised         |
|                         |                         |geological zones and a    |
|                         |                         |basement zone were        |
|                         |                         |identified and are used as|
|                         |                         |constraints in the Mineral|
|                         |                         |Resources estimation.     |
|                         |                         |                          |
|                         |                         |The uppermost zone at     |
|                         |                         |Bumamani, referred to as  |
|                         |                         |Ore Zone 1, is a dark red |
|                         |                         |brown, predominantly fine,|
|                         |                         |well-sorted silty sand    |
|                         |                         |with very little          |
|                         |                         |induration. It is also    |
|                         |Confidence in (or        |characterised by clean,   |
|                         |conversely, the          |well-sorted and polished  |
|                         |uncertainty of) the      |HM with a high value      |
|                         |geological interpretation|mineral assemblage.       |
|                         |of the mineral deposit.  |                          |
|                         |                         |Ore Zone 20 flanks Ore    |
|                         |Nature of the data used  |Zone 1 to the east and is |
|                         |and of any assumptions   |hosted in well-sorted     |
|                         |made.                    |medium to coarse fossil   |
|                         |                         |beach sands characterised |
|                         |The effect, if any, of   |by low slimes and         |
|                         |alternative              |induration. The HM is     |
|Geological interpretation|interpretations on       |well-sorted and polished, |
|                         |Mineral Resource         |containing elevated rutile|
|                         |estimation.              |and zircon as well as a   |
|                         |                         |higher-titanium ilmenite  |
|                         |The use of geology in    |than typical for the Kwale|
|                         |guiding and controlling  |deposits.                 |
|                         |Mineral Resource         |                          |
|                         |estimation.              |Ore Zone 4 underlying both|
|                         |                         |Ore Zone 1 and Ore Zone 20|
|                         |The factors affecting    |is a sandy-clay fluviatile|
|                         |continuity both of grade |unit with low-level       |
|                         |and geology.             |sorting and common        |
|                         |                         |lateritic fragments. The  |
|                         |                         |HM from this zone contains|
|                         |                         |both gangue silicates and |
|                         |                         |lateritic aggregates.     |
|                         |                         |                          |
|                         |                         |All three formations have |
|                         |                         |a regional strike         |
|                         |                         |direction of about 40     |
|                         |                         |degrees East of North and |
|                         |                         |range in age from         |
|                         |                         |mid-Pliocene to           |
|                         |                         |Pleistocene.              |
|                         |                         |                          |
|                         |                         |The Basement Zone is      |
|                         |                         |mostly a clay-rich,       |
|                         |                         |fluviatile unit with a    |
|                         |                         |difficult-to-impossible   |
|                         |                         |washability. The HM from  |
|                         |                         |this zone is typically    |
|                         |                         |dominated by trash        |
|                         |                         |minerals.                 |
|                         |                         |                          |
|                         |                         |All interpreted geology   |
|                         |                         |zones show a strong       |
|                         |                         |correlation between the   |
|                         |                         |field logs, HM sink logs  |
|                         |                         |and XRF oxide chemistry   |
|                         |                         |and mineralogy, giving    |
|                         |                         |confidence to these       |
|                         |                         |interpretations.          |
|_________________________|_________________________|__________________________|
|                         |                         |The Bumamani Mineral      |
|                         |The extent and           |Resources estimate is     |
|                         |variability of the       |approximately 1,100m along|
|                         |Mineral Resource         |strike and 150-300m across|
|                         |expressed as length      |strike on average. The    |
|                         |(along strike or         |deposit thickness averages|
|Dimensions               |otherwise), plan width,  |11m.                      |
|                         |and depth below surface  |                          |
|                         |to the upper and lower   |The typical thickness of  |
|                         |limits of the Mineral    |Ore Zone 1, Ore Zone 20   |
|                         |Resource.                |and Ore Zone 4 is         |
|                         |                         |approximately 8.5m, 7m and|
|                         |                         |2.5m, respectively.       |
|_________________________|_________________________|__________________________|
|                         |                         |The Bumamani Mineral      |
|                         |                         |Resource estimation was   |
|                         |                         |undertaken using Micromine|
|                         |The nature and           |Origin 2023 software. The |
|                         |appropriateness of the   |estimation techniques used|
|                         |estimation technique(s)  |are based upon revision   |
|                         |applied and key          |and modification (as      |
|                         |assumptions, including   |required) of parameters   |
|                         |treatment of extreme     |developed during previous |
|                         |grade values, domaining, |modelling of the Bumamani |
|                         |interpolation parameters |deposit.                  |
|                         |and maximum distance of  |                          |
|                         |extrapolation from data  |Interpolation was         |
|                         |points. If a computer    |constrained within the    |
|                         |assisted estimation      |geological domains and    |
|                         |method was chosen include|utilised search ellipse   |
|                         |a description of computer|dimensions developed from |
|                         |software and parameters  |variography, with a       |
|                         |used.                    |dynamic ellipse           |
|                         |                         |orientation controlled by |
|                         |The availability of check|strike and dip trend      |
|                         |estimates, previous      |points of the geological  |
|                         |estimates and/or mine    |domain.                   |
|                         |production records and   |                          |
|                         |whether the Mineral      |Inverse Distance Weighting|
|                         |Resource estimate takes  |to the power of three was |
|                         |appropriate account of   |used to interpolate assay |
|                         |such data.               |grades (HM, Slimes,       |
|                         |                         |Oversize) and mineralogy  |
|                         |The assumptions made     |(Ilmenite, Rutile and     |
|                         |regarding recovery of    |Zircon).                  |
|                         |by-products.             |                          |
|                         |                         |This resource estimate has|
|                         |Estimation of deleterious|been constrained to a     |
|                         |elements or other        |designated mining area    |
|                         |non-grade variables of   |within SML 23, as the area|
|                         |economic significance    |outside of the current    |
|Estimation and modelling |(e.g., sulphur for acid  |operational envelope is   |
|techniques               |mine drainage            |not considered to have    |
|                         |characterisation).       |prospects for eventual    |
|                         |                         |economic extraction, given|
|                         |In the case of block     |the absence of mining     |
|                         |model interpolation, the |tenure, the planned close |
|                         |block size in relation to|of Kwale Operations, the  |
|                         |the average sample       |low HM grade, small       |
|                         |spacing and the search   |volumes of mineralisation |
|                         |employed.                |identified, and high cost |
|                         |                         |and timeframes of land    |
|                         |Any assumptions behind   |acquisition.              |
|                         |modelling of selective   |                          |
|                         |mining units.            |No assumptions have been  |
|                         |                         |made as to the recovery of|
|                         |Any assumptions about    |by-products.              |
|                         |correlation between      |                          |
|                         |variables.               |The parent cell size used |
|                         |                         |in the grade interpolation|
|                         |Description of how the   |was half the average drill|
|                         |geological interpretation|hole spacing on the Y and |
|                         |was used to control the  |X axes, which was 100m x  |
|                         |resource estimates.      |50m. The vertical         |
|                         |                         |thickness of the cell was |
|                         |Discussion of basis for  |the average drill sample  |
|                         |using or not using grade |interval i.e., 1.5m.      |
|                         |cutting or capping.      |                          |
|                         |                         |No assumptions were made  |
|                         |The process of           |behind the modelling of   |
|                         |validation, the checking |selected mining units.    |
|                         |process used, the        |                          |
|                         |comparison of model data |No assumptions were made  |
|                         |to drill hole data, and  |about the correlation     |
|                         |use of reconciliation    |behind variables.         |
|                         |data if available.       |                          |
|                         |                         |Validation was undertaken |
|                         |                         |by swath plots, population|
|                         |                         |distribution analysis and |
|                         |                         |visual inspection.        |
|_________________________|_________________________|__________________________|
|                         |Whether the tonnages are |                          |
|                         |estimated on a dry basis |The Mineral Resources     |
|Moisture                 |or with natural moisture,|estimate is on a dry      |
|                         |and the method of        |tonnes basis.             |
|                         |determination of the     |                          |
|                         |moisture content         |                          |
|_________________________|_________________________|__________________________|
|                         |                         |The economic cut-off of   |
|                         |                         |Kwale Operations is       |
|                         |                         |between 1% and 1.5% HM    |
|                         |The basis of the adopted |dependent upon mineral    |
|Cut-off parameters       |cut-off grade(s) or      |assemblage and product    |
|                         |quality parameters       |prices, and historically  |
|                         |applied.                 |Kwale Operations Mineral  |
|                         |                         |Resources estimate        |
|                         |                         |reporting has used a 1% HM|
|                         |                         |cut-off grade.            |
|_________________________|_________________________|__________________________|
|                         |Assumptions made         |                          |
|                         |regarding possible mining|                          |
|                         |methods, minimum mining  |The hydraulic mining      |
|                         |dimensions and internal  |method currently used at  |
|                         |(or, if applicable,      |the Kwale Operations is   |
|                         |external) mining         |also used at Bumamani. The|
|                         |dilution. It is always   |slime content and         |
|                         |necessary as part of the |generally low levels of   |
|                         |process of determining   |induration in the Bumamani|
|                         |reasonable prospects for |deposit provide support   |
|                         |eventual economic        |for this mining method.   |
|Mining factors or        |extraction to consider   |                          |
|assumptions              |potential mining methods,|Based on the operational  |
|                         |but the assumptions made |experience to date the    |
|                         |regarding mining methods |Competent Person considers|
|                         |and parameters when      |there are no mining       |
|                         |estimating Mineral       |factors which are likely  |
|                         |Resources may not always |to affect the assumption  |
|                         |be rigorous. Where this  |that the deposit has      |
|                         |is the case, this should |reasonable prospects for  |
|                         |be reported with an      |eventual economic         |
|                         |explanation of the basis |extraction.               |
|                         |of the mining assumptions|                          |
|                         |made.                    |                          |
|_________________________|_________________________|__________________________|
|                         |The basis for assumptions|                          |
|                         |or predictions regarding |The existing concentrator |
|                         |metallurgical            |and mineral separation    |
|                         |amenability. It is always|plant at Kwale Operations |
|                         |necessary as part of the |have proven capable of    |
|                         |process of determining   |processing the Bumamani   |
|                         |reasonable prospects for |material with recoveries  |
|                         |eventual economic        |achieving ranges aligned  |
|                         |extraction to consider   |with historical           |
|                         |potential metallurgical  |production.               |
|Metallurgical factors or |methods, but the         |                          |
|assumptions              |assumptions regarding    |Based on the operational  |
|                         |metallurgical treatment  |experience to date the    |
|                         |processes and parameters |Competent Person considers|
|                         |made when reporting      |there are no metallurgical|
|                         |Mineral Resources may not|factors which are likely  |
|                         |always be rigorous. Where|to affect the assumption  |
|                         |this is the case, this   |that the deposit has      |
|                         |should be reported with  |reasonable prospects for  |
|                         |an explanation of the    |eventual economic         |
|                         |basis of the             |extraction.               |
|                         |metallurgical assumptions|                          |
|                         |made.                    |                          |
|_________________________|_________________________|__________________________|
|                         |                         |Environmental factors for |
|                         |                         |Bumamani are well         |
|                         |Assumptions made         |established and managed as|
|                         |regarding possible waste |they form a continuation  |
|                         |and process residue      |of the current operational|
|                         |disposal options. It is  |plan. The Competent Person|
|                         |always necessary as part |considers there are no    |
|                         |of the process of        |environmental factors     |
|                         |determining reasonable   |which are likely to affect|
|                         |prospects for eventual   |the assumption that the   |
|                         |economic extraction to   |deposit has reasonable    |
|                         |consider the potential   |prospects for eventual    |
|                         |environmental impacts of |economic extraction.      |
|                         |the mining and processing|                          |
|                         |operation. While at this |Course tailings are       |
|                         |stage the determination  |deposited in the mined out|
|Environmental factors or |of potential             |pit voids of both the     |
|assumptions              |environmental impacts,   |Kwale Central Dune and    |
|                         |particularly for a       |Kwale North Dune before   |
|                         |greenfields project, may |being capped with a layer |
|                         |not always be well       |of co-disposed of fine and|
|                         |advanced, the status of  |coarse tails as the first |
|                         |early consideration of   |step in rehabilitation of |
|                         |these potential          |those areas. The excess   |
|                         |environmental impacts    |fine tails not used for   |
|                         |should be reported. Where|co-disposal are deposited |
|                         |these aspects have not   |in the site tailings      |
|                         |been considered this     |storage facility. There is|
|                         |should be reported with  |no plan to return tailings|
|                         |an explanation of the    |to the Bumamani pit void, |
|                         |environmental assumptions|and it will be re-shaped  |
|                         |made.                    |to a stable landform upon |
|                         |                         |the cessation of mining as|
|                         |                         |the first step in         |
|                         |                         |rehabilitation.           |
|_________________________|_________________________|__________________________|
|                         |Whether assumed or       |                          |
|                         |determined. If assumed,  |                          |
|                         |the basis for the        |                          |
|                         |assumptions. If          |                          |
|                         |determined, the method   |                          |
|                         |used, whether wet or dry,|                          |
|                         |the frequency of the     |A fixed dry bulk density  |
|                         |measurements, the nature,|of 1.7 (t/m3) was assumed |
|                         |size and                 |for the Bumamani Mineral  |
|                         |representativeness of the|Resources estimate, based |
|                         |samples.                 |on operational experience |
|                         |                         |of mining the Kwale       |
|                         |The bulk density for bulk|Central Dune and Kwale    |
|Bulk density             |material must have been  |South Dune deposits.      |
|                         |measured by methods that |                          |
|                         |adequately account for   |Ongoing production        |
|                         |void spaces (vugs,       |reconciliation has shown  |
|                         |porosity, etc), moisture |this to be a reasonable   |
|                         |and differences between  |assumption and more       |
|                         |rock and alteration zones|reliable than bulk density|
|                         |within the deposit.      |algorithms.               |
|                         |                         |                          |
|                         |Discuss assumptions for  |                          |
|                         |bulk density estimates   |                          |
|                         |used in the evaluation   |                          |
|                         |process of the different |                          |
|                         |materials.               |                          |
|_________________________|_________________________|__________________________|
|                         |                         |The Mineral Resources     |
|                         |                         |classification for the    |
|                         |                         |Bumamani deposit was based|
|                         |                         |on drill hole spacing,    |
|                         |The basis for the        |sample interval and the   |
|                         |classification of the    |distribution and influence|
|                         |Mineral Resources into   |of composite mineralogical|
|                         |varying confidence       |samples.                  |
|                         |categories.              |                          |
|                         |                         |The classification of the |
|                         |Whether appropriate      |Measured, Indicated, and  |
|                         |account has been taken of|Inferred Mineral Resources|
|                         |all relevant factors     |was supported by the      |
|                         |(i.e., relative          |uniform grid spacing of   |
|                         |confidence in            |drilling, uncomplicated   |
|                         |tonnage/grade            |and consistent geology,   |
|Classification           |estimations, reliability |relatively good continuity|
|                         |of input data, confidence|of mineralisation         |
|                         |in continuity of geology |particularly along strike |
|                         |and metal values,        |(and supported by the     |
|                         |quality, quantity and    |domain-controlled         |
|                         |distribution of the      |variography), confidence  |
|                         |data).                   |in the downhole drilling  |
|                         |                         |data and supporting       |
|                         |Whether the result       |criteria as noted above.  |
|                         |appropriately reflects   |                          |
|                         |the Competent Person’s   |As Competent Person, Base |
|                         |view of the deposit.     |Titanium Exploration      |
|                         |                         |Manager, Mr. Edwin Owino, |
|                         |                         |considers that the result |
|                         |                         |appropriately reflects a  |
|                         |                         |reasonable view of the    |
|                         |                         |deposit categorisation.   |
|_________________________|_________________________|__________________________|
|                         |                         |Internal peer review was  |
|                         |                         |undertaken by Ian         |
|                         |                         |Reudavey, Base Resources  |
|                         |                         |Exploration and Resource  |
|                         |                         |Manager, with a focus on  |
|                         |                         |the process and output of |
|                         |The results of any audits|the geology               |
|Audits or reviews.       |or reviews of Mineral    |interpretation, database  |
|                         |Resource estimates.      |integrity and             |
|                         |                         |consideration of whether  |
|                         |                         |wireframes reflect the    |
|                         |                         |geological interpretation |
|                         |                         |and grade interpolations. |
|                         |                         |Mr. Reudavey was satisfied|
|                         |                         |with these facets.        |
|_________________________|_________________________|__________________________|
|                         |Where appropriate a      |                          |
|                         |statement of the relative|                          |
|                         |accuracy and confidence  |                          |
|                         |level in the Mineral     |                          |
|                         |Resource estimate using  |                          |
|                         |an approach or procedure |                          |
|                         |deemed appropriate by the|                          |
|                         |Competent Person. For    |                          |
|                         |example, the application |                          |
|                         |of statistical or        |Variography was undertaken|
|                         |geostatistical procedures|to determine the drill    |
|                         |to quantify the relative |hole support of the       |
|                         |accuracy of the resource |selected JORC Code        |
|                         |within stated confidence |classification.           |
|                         |limits, or, if such an   |                          |
|                         |approach is not deemed   |Validation of the model vs|
|                         |appropriate, a           |drill hole grades was     |
|                         |qualitative discussion of|undertaken by direct      |
|                         |the factors that could   |observation and comparison|
|Discussion of relative   |affect the relative      |of the results on screen. |
|accuracy/ confidence     |accuracy and confidence  |                          |
|                         |of the estimate.         |The resource statement is |
|                         |                         |a global estimate for the |
|                         |The statement should     |entire known extent of the|
|                         |specify whether it       |Bumamani deposit within   |
|                         |relates to global or     |SML 23.                   |
|                         |local estimates, and, if |                          |
|                         |local, state the relevant|Production data shows     |
|                         |tonnages, which should be|reasonable correlation    |
|                         |relevant to technical and|with the resource         |
|                         |economic evaluation.     |estimate.                 |
|                         |Documentation should     |                          |
|                         |include assumptions made |                          |
|                         |and the procedures used. |                          |
|                         |                         |                          |
|                         |These statements of      |                          |
|                         |relative accuracy and    |                          |
|                         |confidence of the        |                          |
|                         |estimate should be       |                          |
|                         |compared with production |                          |
|                         |data, where available.   |                          |
|_________________________|_________________________|__________________________|
The relative proportion of heavy mineral
Assemblage                        components, principally ilmenite, rutile,
                                  zircon and, where applicable, leucoxene,
                                  monazite and garnet.

Base Titanium                     Base Titanium Limited.

                                  The JORC Code requires that a Competent
                                  Person be a Member or Fellow of The
                                  Australasian Institute of Mining and
                                  Metallurgy, of the Australian Institute of
                                  Geoscientists, or of a ‘Recognised
Competent Person                  Professional Organisation’. A Competent
                                  Person must have a minimum of five years’
                                  experience working with the style of
                                  mineralisation or type of deposit under
                                  consideration and relevant to the activity
                                  which that person is undertaking.

                                  The lowest grade of mineralised material that
                                  is thought to be economically mineable and
Cut-off grade                     available. Typically used by Base Resources
                                  to define which material is reported in a
                                  Mineral Resources estimate.

DTM                               Digital Terrain Model.

GARN                              Garnet, a valuable heavy mineral.

                                  A physical or chemical measurement of the
                                  characteristics of the material of interest.
Grade                             In this context, the grade is always a
                                  percentage and the characteristics are heavy
                                  mineral, oversize, slime and the various
                                  product minerals (ilmenite, rutile etc).

Heavy mineral or HM               In mineral sands, minerals with a specific
                                  gravity greater than 2.85 t/m3.

ILM                               Ilmenite, a valuable heavy mineral.

                                  An Indicated Mineral Resource is that part of
                                  a Mineral Resource for which quantity, grade
                                  (or quality), densities, shape and physical
Indicated                         characteristics are estimated with sufficient
                                  confidence to allow the application of
                                  Modifying Factors in sufficient detail to
                                  support mine planning and evaluation of the
                                  economic viability of the deposit.

                                  An Inferred Mineral Resource is that part of
                                  a Mineral Resource for which quantity and
                                  grade (or quality) are estimated on the basis
                                  of limited geological evidence and sampling.
                                  Geological evidence is sufficient to imply
Inferred                          but not verify geological and grade (or
                                  quality) continuity. It is based on
                                  exploration, sampling and testing information
                                  gathered through appropriate techniques from
                                  locations such as outcrops, trenches, pits,
                                  workings and drill holes.

                                  A statistical interpolation method whereby
Inverse distance weighting        the influence of data points within a defined
                                  neighbourhood around an interpolated point
                                  decreases as a function of distance.

                                  The Australasian Code for Reporting of
                                  Exploration Results, Mineral Resources and
                                  Ore Reserves 2012 Edition, as published by
JORC Code                         the Joint Ore Reserves Committee of The
                                  Australasian Institute of Mining and
                                  Metallurgy, Australian Institute of
                                  Geoscientists and Minerals Council of
                                  .

Kwale Operations or Kwale Project The Company’s 100% owned Kwale Mineral Sands
                                  Operations in .

LEUC                              Leucoxene, a valuable heavy mineral.

                                  LIDAR is a remote sensing technology that
LIDAR survey                      measures distance by illuminating a target
                                  with a laser and analysing the reflected
                                  light to produce a DTM.

                                  A Measured Mineral Resource is that part of a
                                  Mineral Resource for which quantity, grade
                                  (or quality), densities, shape, and physical
Measured                          characteristics are estimated with confidence
                                  sufficient to allow the application of
                                  Modifying Factors to support detailed mine
                                  planning and final evaluation of the economic
                                  viability of the deposit.

                                  Mineral Resources are a concentration or
                                  occurrence of solid material of economic
                                  interest in or on the Earth’s crust in such
                                  form, grade (or quality), and quantity that
                                  there are reasonable prospects for eventual
                                  economic extraction. The location, quantity,
Mineral Resources                 grade (or quality), continuity and other
                                  geological characteristics of a Mineral
                                  Resource are known, estimated or interpreted
                                  from specific geological evidence and
                                  knowledge, including sampling. Mineral
                                  Resources are sub-divided, in order of
                                  increasing geological confidence, into
                                  Inferred, Indicated and Measured categories.

                                  A company developed mineralogy modelling
                                  technique, it comprises an XRF analysis of
MinMod                            the magnetic and non-magnetic fractions of
                                  each composite or sample, the results from
                                  which are then back-calculated to determine
                                  in-ground mineralogy.

                                  Modifying Factors are considerations used to
                                  convert Mineral Resources to Ore Reserves.
                                  These include, but are not restricted to,
Modifying Factors                 mining, processing, metallurgical,
                                  infrastructure, economic, marketing, legal,
                                  environmental, social and governmental
                                  factors.

MON                               Monazite, a valuable heavy mineral that
                                  contains rare earth elements.

NQ                                Specification of drilling rods (and bits)
                                  with an outer diameter of 76mm.

                                  Ore Reserves are the economically mineable
                                  part of a Measured and/or Indicated Mineral
                                  Resource. It includes diluting materials and
                                  allowances for losses, which may occur when
                                  the material is mined or extracted and is
Ore Reserves                      defined by studies at Pre-Feasibility or
                                  Feasibility level as appropriate that include
                                  application of Modifying Factors. Such
                                  studies demonstrate that, at the time of
                                  reporting, extraction could reasonably be
                                  justified.

OS                                Oversize material, for Kwale and Ranobe it is
                                  defined as material >1mm in size

                                  A Probable Ore Reserve is the economically
                                  mineable part of an Indicated, and in some
Probable                          circumstances, a Measured Mineral Resource.
                                  The confidence in the Modifying Factors
                                  applying to a Probable Ore Reserve is lower
                                  than that applying to a Proved Ore Reserve.

                                  A Proved Ore Reserve is the economically
Proved                            mineable part of a Measured Mineral Resource.
                                  A Proved Ore Reserve implies a high degree of
                                  confidence in the Modifying Factors.

                                  An acronym for Quantitative Evaluation of
                                  Materials by Scanning Electron Microscopy, an
QEMSCAN                           integrated automated mineralogy and
                                  petrography solution providing quantitative
                                  analysis of minerals and rocks.

QQ plot                           Quantile plot. Used to graphically compare
                                  data distributions.

RCAC                              Reverse circulation air core.

                                  Real time kinematic DGPS uses a base station
                                  GPS at a known point that communicates via
RTK                               radio with a roving unit so that the random
                                  position error introduced by the satellite
                                  owners may be corrected in real time.

RUT                               Rutile, a valuable heavy mineral.

                                  Slimes, fine material (defined as <45µm at
SL                                Kwale and <63µm at Ranobe) that is a waste
                                  product from the processing of mineral sands.

SML 23                            Kwale Special  No. 23

                                  Material that is depleted from Mineral
                                  Resources or Ore Reserves, but which was not
                                  mined. This material still remains in ground
Sterilisation                     following mining activity and, in the
                                  Competent Person’s opinion, it has no
                                  reasonable prospects for eventual economic
                                  extraction.

                                  A geostatistical method that investigates the
Variography                       spatial variability and dependence of grade
                                  within a deposit. This may also include a
                                  directional analysis.

                                  A spectroscopic method used to determine the
                                  chemical composition of a material through
XRF analysis or XRF               analysis of secondary X-ray emissions,
                                  generated by excitation of a sample with
                                  primary X-rays that are characteristic of a
                                  particular element.

ZIR                               Zircon, a valuable heavy mineral.AustraliaKenyaMining Lease
______________________________________________________________
|Australian Media Relations      |UK Media Relations           |
|________________________________|_____________________________|
|Sodali & Co                     |Tavistock Communications     |
|________________________________|_____________________________|
| and Michael Weir|Jos Simson and |
|________________________________|_____________________________|
|Tel: +61 8 6160 4900            |Tel: +44 207 920 3150        |
|________________________________|_____________________________|Cameron GilenkoGareth Tredway

SUMMARY

KWALE DEPOSITS

Mineral Resources

Ore Reserves

Ranobe Deposit

 

Mineral Resources

Ore Reserves

Further information

Mineral Resources and Ore Reserves Governance

 

Mineral Resources

Ore Reserves

Further information relevant to both the 2024 Kwale North Dune and Bumamani Mineral Resources estimates

Further information specific to the 2024 Kwale North Dune Mineral Resources estimate

Further information specific to the 2024 Bumamani Mineral Resources estimate

Competent Persons’ Statements

Forward looking statements

 

 

Glossary




Figure 1 -   Figure 2 -    Figure 3 -   Figure 4 -   Figure 5 -   Figure 6 -
Plan showing   Schematic   Map showing  Oblique view   Schematic   Map showing
site layout  cross-section Kwale North    of Kwale   cross-section  Bumamani
  of Kwale   of the Kwale  Dune deposit  North Dune     of the       deposit
 Operations   North Dune                               Bumamani
Ore Reserves    deposit                                 deposit


 Figure 7 -
  Bumamani
  deposit
oblique view
NO INVESTMENT ADVICE

Proactive Investors is a publisher of financial news and information. No content in this record, or published on the Proactive Investors website (the "Site"), constitutes a recommendation that any particular security, portfolio of securities, transaction, or investment strategy is suitable or advisable for any specific person. No content is tailored to any specific person's needs, objectives, or financial situation.

Proactive Investors is not a registered investment adviser or broker-dealer and does not provide personalized investment advice. Nothing in this record constitutes investment advice or a recommendation to buy, hold, or sell any security. None of the information providers or their affiliates will advise you personally concerning the nature, potential, advisability, value, or suitability of any particular security, portfolio, transaction, or investment strategy. Any decision to buy, sell, or hold a security should be made only after consulting an appropriately qualified, licensed financial adviser and reading all relevant offering documentation.

This record, and any record we publish by or on behalf of our clients, should not be construed as an offer or solicitation to buy or sell any product or security. Our content is independent financial journalism, produced in a neutral, objective style with full source attribution.

In accordance with the Federal Trade Commission's guidelines on material connections, Proactive Investors discloses the following: we may receive cash or, in some cases, equity compensation from companies whose news is distributed through our platform. This compensation is for news distribution and media services, not for editorial content or coverage decisions. Where Proactive Investors has a commercial relationship with a company covered in this record, that relationship is disclosed within the article. Any such relationship does not determine, influence, or shape the editorial content produced. Where we receive equity compensation, such securities are held independently by a third-party broker and sold at the broker's discretion.

The Site may contain opinions from time to time regarding securities mentioned in other products, including company-related products, and those opinions may differ from those obtained through another Proactive Investors product. Opinions and commentary reflect the views of the named author at the time of writing and are subject to change without notice.

Price and other data is supplied by sources believed to be reliable. Any calculations are made using such data. Neither the data nor the calculations are guaranteed by those sources, by Proactive Investors, by the information providers, or by any other person or entity, and may not be complete or accurate.

From time to time, reference may be made in our marketing materials to previously published articles or opinions. Such references may be selective, may reference only a portion of an article, and are likely not to be current. As markets change continuously, previously published information and data may not be current and should not be relied upon.

FOR OUR FULL DISCLAIMER CLICK HERE

814 min read